Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: SCHREITER READY MIX MATERIALS

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SCHREITER READY MIX MATERIALS in 200 SOUTH COOL SPRINGS ROAD, O'FALLON, MO 63366 (NAICS 000000). OSHA activity number 304327265.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Schreiter Ready MIX Materials — free Get an email when a new federal OSHA severe-injury report for Schreiter Ready MIX Materials is published. One employer, no account, unsubscribe in one click.
Site address
200 SOUTH COOL SPRINGS ROAD
City
O'FALLON
State
MO
ZIP
63366
Mailing
200 SOUTH COOL SPRINGS ROAD, OFALLON, MO 63366
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
3273
Employees
28
Ownership type
A
Industry flags
Manufacturing safety.

3 citations on file for this inspection.

5(a)(1)

Serious Gravity 02 1 instance 1 exposed
Issued
Apr 15, 2002
Abate by
Jun 1, 2004
Penalty
Initial $900 · Current $1 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to:
(a)Employees are exposed to a fall hazard of approximately 8 feet once
they access
the work platforms located on the sides of cement mixer trucks.  the
entrance to
the work platform is left unguarded.
Among other feasible and acceptable methods to correct this hazard would
be to:
install a chain or other mechanically strong material across the entrance
opening
to the work platform.  This chain or other mechanically strong material
would be
left in the open position while employees access the work platform.  Once
the
employees gain access to the work platform, the chain or other mechanically
strong material would be secured in the closed position.  Another feasible
method
for guarding this open side would be to install a swinging gate which
could be
secured in the open position while employees access the work platform.
Once
employees gain access to the work platform, the swinging gate can be
secured in
the closed position.
Abatement verification is required for this violation.  The abatement
certification sheet is enclosed with the citation(s).n
Recent events (3)
  • — P (S) $1.00
  • — F (S) $1.00
  • — Z (S) $900.00

1910.212 A01

Serious Gravity 02 1 instance 2 exposed
Issued
Apr 15, 2002
Abate by
Sep 22, 2003
Penalty
Initial $900 · Current $900
Recent events (2)
  • — F (S) $900.00
  • — Z (S) $900.00

1910.169 B03 IV

Other-than-serious Gravity 01 1 instance 1 exposed
Issued
Apr 15, 2002
Abate by
Sep 22, 2003
Recent events (2)
  • — F (O)
  • — Z (O)

View Schreiter Ready MIX Materials's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 304327265.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.