Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: POWER AND CONTROL SYSTEMS CO., INC. AKA PACS

Planned inspection · Health discipline

On , OSHA opened a planned health inspection of POWER AND CONTROL SYSTEMS CO., INC. AKA PACS in 10 PITTSBURG AVE., MOUNT VERNON, OH 43050 (NAICS 000000). OSHA activity number 304366297.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Power and Control Systems CO., INC. AKA Pacs — free Get an email when a new federal OSHA severe-injury report for Power and Control Systems CO., INC. AKA Pacs is published. One employer, no account, unsubscribe in one click.
Site address
10 PITTSBURG AVE.
City
MOUNT VERNON
State
OH
ZIP
43050
Mailing
P.O. BOX 892, MOUNT VERNON, OH 43050
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
3613
Employees
225
Ownership type
A

19 citations on file for this inspection.

1910.106 D04 I

Serious Gravity 02 1 instance 2 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Penalty
Initial $1,700 · Current $765 Reduced
Recent events (2)
  • — I (S) $765.00
  • — Z (S) $1700.00

1910.147 C04 II

Serious Gravity 03 1 instance 1 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Penalty
Initial $2,125 · Current $956 Reduced
Recent events (2)
  • — I (S) $956.25
  • — Z (S) $2125.00

1910.147 C05 II

Serious Gravity 03 1 instance 1 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Recent events (2)
  • — I (S)
  • — Z (S)

1910.147 C05 III

Serious Gravity 03 1 instance 1 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Recent events (2)
  • — I (S)
  • — Z (S)

1910.147 C06 I

Serious Gravity 03 1 instance 1 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Recent events (2)
  • — I (S)
  • — Z (S)

1910.151 C

Serious Gravity 02 1 instance 1 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Penalty
Initial $1,700 · Current $765 Reduced

Hazardous substances 2310

Recent events (2)
  • — I (S) $765.00
  • — Z (S) $1700.00

1910.178 A04

Serious Gravity 01 1 instance 1 exposed
Issued
Jun 3, 2002
Abate by
Aug 15, 2002
Penalty
Initial $1,275 · Current $574 Reduced
Recent events (2)
  • — I (S) $573.75
  • — Z (S) $1275.00

1910.212 A01

Serious Gravity 01 1 instance 1 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Penalty
Initial $1,275 · Current $574 Reduced
Recent events (2)
  • — I (S) $573.75
  • — Z (S) $1275.00

1910.213 B03

Serious Gravity 03 1 instance 1 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Penalty
Initial $2,125 · Current $956 Reduced
Recent events (2)
  • — I (S) $956.25
  • — Z (S) $2125.00

1910.215 A04

Serious Gravity 03 1 instance 1 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Penalty
Initial $2,125 · Current $956 Reduced
Recent events (2)
  • — I (S) $956.25
  • — Z (S) $2125.00

1910.215 D03

Serious Gravity 01 1 instance 1 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Recent events (2)
  • — I (S)
  • — Z (S)

1910.132 D01

Other-than-serious Gravity 01 1 instance 4 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Recent events (2)
  • — I (O)
  • — Z (O)

1910.134 M02 I

Other-than-serious Gravity 01 1 instance 2 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Recent events (2)
  • — I (O)
  • — Z (O)

1910.303 B02

Other-than-serious Gravity 01 1 instance 1 exposed
Issued
Jun 3, 2002
Abate by
Jun 6, 2002
Recent events (2)
  • — I (O)
  • — Z (O)

1910.303 F

Other-than-serious Gravity 01 1 instance 1 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Recent events (2)
  • — I (O)
  • — Z (O)

1910.304 F01 IV

Other-than-serious Gravity 01 1 instance 2 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Recent events (2)
  • — I (O)
  • — Z (O)

1910.1200 E01 I

Other-than-serious Gravity 01 1 instance 4 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Recent events (2)
  • — I (O)
  • — Z (O)

1910.1200 F05 I

Other-than-serious Gravity 01 1 instance 4 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Recent events (2)
  • — I (O)
  • — Z (O)

1910.1200 F05 II

Other-than-serious Gravity 01 1 instance 4 exposed
Issued
Jun 3, 2002
Abate by
Jul 6, 2002
Recent events (2)
  • — I (O)
  • — Z (O)

View Power and Control Systems CO., INC. AKA Pacs's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 304366297.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.