Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: INTERMOUNTAIN POWER SERVICE CORP

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of INTERMOUNTAIN POWER SERVICE CORP in 160 EAST 300 SOUTH, SALT LAKE CITY, UT 84114 (NAICS 000000). OSHA activity number 304407604.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Intermountain Power Service Corp — free Get an email when a new federal OSHA severe-injury report for Intermountain Power Service Corp is published. One employer, no account, unsubscribe in one click.
Site address
160 EAST 300 SOUTH
City
SALT LAKE CITY
State
UT
ZIP
84114
Mailing
RT. 1 BOX 864, DELTA, UT 84624
Inspection type
Complaint (B)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
000000
SIC code (legacy)
4911
Employees
470
Ownership type
A
Industry flags
Manufacturing safety.

21 citations on file for this inspection.

10005 D03

Serious 1 instance 50 exposed
Issued
May 29, 2001
Abate by
Jun 15, 2001
Penalty
Initial $1,125 · Current $375 Reduced
Recent events (2)
  • — F (S) $375.00
  • — Z (S) $1125.00

60001 N

Serious 1 instance 10 exposed
Issued
May 29, 2001
Abate by
Jun 15, 2001
Recent events (2)
  • — F (S)
  • — Z (S)

1910.212 A01

Serious 1 instance 5 exposed
Issued
May 29, 2001
Abate by
Jun 15, 2001
Recent events (2)
  • — F (S)
  • — Z (S)

1910.219 C02 I

Serious 3 instances 20 exposed
Issued
May 29, 2001
Abate by
Jun 15, 2001
Recent events (2)
  • — F (S)
  • — Z (S)

1910.219 E03 I

Serious 1 instance 15 exposed
Issued
May 29, 2001
Abate by
Jun 4, 2001
Recent events (2)
  • — F (S)
  • — Z (S)

1910.119 D03 I

Serious 1 instance 457 exposed
Issued
May 29, 2001
Abate by
Jun 4, 2001
Penalty
Initial $1,125 · Current $375 Reduced
Recent events (2)
  • — F (S) $375.00
  • — Z (S) $1125.00

1910.119 E05

Serious 1 instance 453 exposed
Issued
May 29, 2001
Abate by
Jun 15, 2001
Recent events (2)
  • — F (S)
  • — Z (S)

1910.119 F03

Serious 1 instance 453 exposed
Issued
May 29, 2001
Abate by
Jun 15, 2001
Recent events (2)
  • — F (S)
  • — Z (S)

1910.303 G02 III

Deleted Serious 1 instance 10 exposed
Issued
May 29, 2001
Abate by
Jun 4, 2001
Penalty
Initial $1,125 · Current $1,125
Recent events (2)
  • — F (S) $1125.00
  • — Z (S) $1125.00

1910.305 E01

Deleted Serious 1 instance 10 exposed
Issued
May 29, 2001
Abate by
Jun 15, 2001
Recent events (2)
  • — F (S)
  • — Z (S)

1910.305 J02 II

Deleted Serious 1 instance 30 exposed
Issued
May 29, 2001
Abate by
Jun 15, 2001
Recent events (2)
  • — F (S)
  • — Z (S)

1910.119 O01

Serious 1 instance 453 exposed
Issued
May 29, 2001
Abate by
Jun 15, 2001
Recent events (2)
  • — F (S)
  • — Z (S)

1910.36 B05

Other-than-serious 1 instance 30 exposed
Issued
May 29, 2001
Abate by
Jun 4, 2001
Recent events (2)
  • — F (O)
  • — Z (O)

1910.103 B01 IVD

Other-than-serious 1 instance 5 exposed
Issued
May 29, 2001
Abate by
Jun 15, 2001
Penalty
Initial $250 · Current $250
Recent events (2)
  • — F (O) $250.00
  • — Z (O) $250.00

1910.106 G03 III

Other-than-serious 1 instance 40 exposed
Issued
May 29, 2001
Abate by
Jun 15, 2001
Penalty
Initial $250 · Current $250
Recent events (2)
  • — F (O) $250.00
  • — Z (O) $250.00

1910.107 C02

Other-than-serious 1 instance 5 exposed
Issued
May 29, 2001
Abate by
Jun 4, 2001
Recent events (2)
  • — F (O)
  • — Z (O)

1910.107 E09

Other-than-serious 1 instance 5 exposed
Issued
May 29, 2001
Abate by
Jun 4, 2001
Recent events (2)
  • — F (O)
  • — Z (O)

1910.111 B09 I

Other-than-serious 1 instance 457 exposed
Issued
May 29, 2001
Abate by
Jun 15, 2001
Penalty
Initial $250 · Current $250
Recent events (2)
  • — F (O) $250.00
  • — Z (O) $250.00

1910.179 E02 I

Deleted Other-than-serious 1 instance 100 exposed
Issued
May 29, 2001
Abate by
Jun 15, 2001
Penalty
Initial $250 · Current $250
Recent events (2)
  • — F (O) $250.00
  • — Z (O) $250.00

1910.179 E04

Deleted Other-than-serious 1 instance 100 exposed
Issued
May 29, 2001
Abate by
Jun 15, 2001
Penalty
Initial $250 · Current $250
Recent events (2)
  • — F (O) $250.00
  • — Z (O) $250.00

1910.1450 E04

Other-than-serious 1 instance 10 exposed
Issued
May 29, 2001
Abate by
Jun 15, 2001
Penalty
Initial $250 · Current $250
Recent events (2)
  • — F (O) $250.00
  • — Z (O) $250.00

View Intermountain Power Service Corp's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 304407604.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.