Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: CRONE CONSTRUCTION CORP.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of CRONE CONSTRUCTION CORP. in LOT #8, INTERSECTION OF NEVIS DR. & NEVIS COURT, CHESTERFIELD, VA 23832 (NAICS 000000). OSHA activity number 304531908.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Crone Construction Corp. — free Get an email when a new federal OSHA severe-injury report for Crone Construction Corp. is published. One employer, no account, unsubscribe in one click.
Site address
LOT #8, INTERSECTION OF NEVIS DR. & NEVIS COURT
City
CHESTERFIELD
State
VA
ZIP
23832
Mailing
11037 RESEARCH COURT, RICHMOND, VA 23236
Inspection type
Complaint (B)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1751
Employees
5
Ownership type
A

18 citations on file for this inspection.

1926.50 C

Serious 1 instance 5 exposed
Issued
Oct 12, 2001
Abate by
Nov 30, 2001
Penalty
Initial $300 · Current $180 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $300.00

1926.100 A

Serious 5 instances 5 exposed
Issued
Oct 12, 2001
Abate by
Oct 18, 2001
Penalty
Initial $525 · Current $315 Reduced
Recent events (2)
  • — I (S) $315.00
  • — Z (S) $525.00

1926.451 A01

Serious 1 instance 2 exposed
Issued
Oct 12, 2001
Abate by
Oct 18, 2001
Penalty
Initial $300 · Current $180 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $300.00

1926.451 B02 I

Serious 1 instance 2 exposed
Issued
Oct 12, 2001
Abate by
Oct 18, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.451 B03

Serious 1 instance 2 exposed
Issued
Oct 12, 2001
Abate by
Oct 18, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.451 B05 II

Serious 2 instances 2 exposed
Issued
Oct 12, 2001
Abate by
Oct 18, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.451 F07

Serious 1 instance 2 exposed
Issued
Oct 12, 2001
Abate by
Oct 22, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.452 J02

Serious 2 instances 2 exposed
Issued
Oct 12, 2001
Abate by
Oct 18, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.451 G01 I

Serious 2 instances 2 exposed
Issued
Oct 12, 2001
Abate by
Oct 18, 2001
Penalty
Initial $300 · Current $180 Reduced
Recent events (2)
  • — I (S) $180.00
  • — Z (S) $300.00

1926.451 G01 VII

Serious 3 instances 2 exposed
Issued
Oct 12, 2001
Abate by
Oct 18, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.454 A

Serious 1 instance 2 exposed
Issued
Oct 12, 2001
Abate by
Oct 24, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.454 B

Serious 2 instances 2 exposed
Issued
Oct 12, 2001
Abate by
Oct 24, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1926.501 B01

Serious 1 instance 3 exposed
Issued
Oct 12, 2001
Abate by
Oct 18, 2001
Penalty
Initial $375 · Current $225 Reduced
Recent events (2)
  • — I (S) $225.00
  • — Z (S) $375.00

1926.501 B13

Serious 3 instances 3 exposed
Issued
Oct 12, 2001
Abate by
Oct 17, 2001
Recent events (2)
  • — I (S)
  • — Z (S)

1910.1200 E01

Other-than-serious 1 instance 5 exposed
Issued
Oct 12, 2001
Abate by
Oct 24, 2001
Recent events (2)
  • — I (O)
  • — Z (O)

1910.1200 G01

Other-than-serious 2 instances 5 exposed
Issued
Oct 12, 2001
Abate by
Oct 24, 2001
Recent events (2)
  • — I (O)
  • — Z (O)

1910.1200 H01

Other-than-serious 5 instances 5 exposed
Issued
Oct 12, 2001
Abate by
Oct 24, 2001
Recent events (2)
  • — I (O)
  • — Z (O)

1926.51 C01

Other-than-serious 1 instance 5 exposed
Issued
Oct 12, 2001
Abate by
Oct 18, 2001
Penalty
Initial $150 · Current $90 Reduced
Recent events (2)
  • — I (O) $90.00
  • — Z (O) $150.00

View Crone Construction Corp.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 304531908.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.