Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: D & M BUILDERS, LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of D & M BUILDERS, LLC in 5435 ORCHARD HILL DRIVE, ROANOKE, VA 24019 (NAICS 000000). OSHA activity number 304536717.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch D & M Builders, LLC — free Get an email when a new federal OSHA severe-injury report for D & M Builders, LLC is published. One employer, no account, unsubscribe in one click.
Establishment
D & M BUILDERS, LLC
Site address
5435 ORCHARD HILL DRIVE
City
ROANOKE
State
VA
ZIP
24019
Mailing
2401 PENNY ROAD, SUITE 107, HIGH POINT, NC 27265
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Data loaded
NAICS code
000000
SIC code (legacy)
1522
Employees
14
Ownership type
A
Industry flags
Construction safety.

19 citations on file for this inspection.

1926.501 B13

Serious Gravity 10 5 instances 10 exposed
Issued
Jun 14, 2001
Abate by
Jun 20, 2001
Penalty
Initial $1,500 · Current $1,500

1926.501 B14

Serious Gravity 10 5 instances 10 exposed
Issued
Jun 14, 2001
Abate by
Jun 20, 2001

1926.1053 A03 I

Serious Gravity 03 1 instance 1 exposed
Issued
Jun 14, 2001
Abate by
Jun 20, 2001
Penalty
Initial $375 · Current $375

1926.1053 A04 II

Serious Gravity 03 1 instance 1 exposed
Issued
Jun 14, 2001
Abate by
Jun 20, 2001

1926.1053 A09

Serious Gravity 03 1 instance 1 exposed
Issued
Jun 14, 2001
Abate by
Jun 20, 2001

1926.1053 A11

Serious Gravity 03 1 instance 1 exposed
Issued
Jun 14, 2001
Abate by
Jun 20, 2001

1926.28 A

Serious 2 instances 2 exposed
Issued
May 22, 2001
Abate by
May 29, 2001
Penalty
Initial $375 · Current $375

1926.501 B11

Serious 1 instance 4 exposed
Issued
May 22, 2001
Abate by
May 29, 2001
Penalty
Initial $1,500 · Current $1,500

1926.501 B13

Deleted Serious 5 instances 10 exposed
Issued
May 22, 2001
Abate by
May 29, 2001
Penalty
Initial $1,500 · Current $1,500
Recent events (2)
  • — I (S) $1500.00
  • — Z (S) $1500.00

1926.501 B14

Deleted Serious 5 instances 10 exposed
Issued
May 22, 2001
Abate by
May 29, 2001
Penalty
Initial $1,500 · Current $1,500
Recent events (2)
  • — I (S) $1500.00
  • — Z (S) $1500.00

1926.502 B06

Serious 1 instance 10 exposed
Issued
May 22, 2001
Abate by
May 29, 2001
Penalty
Initial $300 · Current $300

1926.502 B13

Serious 1 instance 10 exposed
Issued
May 22, 2001
Abate by
May 29, 2001
Penalty
Initial $375 · Current $375

1926.1052 C01

Serious 3 instances 10 exposed
Issued
May 22, 2001
Abate by
May 29, 2001
Penalty
Initial $1,500 · Current $750 Reduced
Recent events (2)
  • — I (S) $750.00
  • — Z (S) $1500.00

1926.1053 A03 I

Deleted Serious 1 instance 1 exposed
Issued
May 22, 2001
Abate by
May 29, 2001
Penalty
Initial $375 · Current $375
Recent events (2)
  • — I (S) $375.00
  • — Z (S) $375.00

1926.1053 A04 II

Deleted Serious 1 instance 1 exposed
Issued
May 22, 2001
Abate by
May 29, 2001
Penalty
Initial $375 · Current $375
Recent events (2)
  • — I (S) $375.00
  • — Z (S) $375.00

1926.1053 A09

Deleted Serious 1 instance 1 exposed
Issued
May 22, 2001
Abate by
May 29, 2001
Penalty
Initial $375 · Current $375
Recent events (2)
  • — I (S) $375.00
  • — Z (S) $375.00

1926.1053 A11

Deleted Serious 2 instances 1 exposed
Issued
May 22, 2001
Abate by
May 29, 2001
Penalty
Initial $375 · Current $375
Recent events (2)
  • — I (S) $375.00
  • — Z (S) $375.00

1926.1053 B08

Serious 1 instance 5 exposed
Issued
May 22, 2001
Abate by
May 29, 2001
Penalty
Initial $375 · Current $375

1926.1053 B15

Serious 3 instances 5 exposed
Issued
May 22, 2001
Abate by
May 29, 2001
Penalty
Initial $1,500 · Current $750 Reduced
Recent events (2)
  • — I (S) $750.00
  • — Z (S) $1500.00

View D & M Builders, LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 304536717.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.