On , OSHA opened a complaint health inspection of BROWN PRINTING COMPANY in 668 GRAVEL PIKE, EAST GREENVILLE, PA 18041 (NAICS 323110). OSHA activity number 305016115.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Brown Printing Company — free Get an email when a new federal OSHA severe-injury report for Brown Printing Company is published. One employer, no account, unsubscribe in one click.
Site address
668 GRAVEL PIKE
City
EAST GREENVILLE
State
PA
ZIP
18041
Inspection type
Complaint (B)
Scope
Complete (A)
Discipline
Health
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
323110
SIC code (legacy)
2752
Employees
649
Ownership type
A

13 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 56 exposed
Issued
May 27, 2003
Abate by
Nov 9, 2004
Penalty
Initial $4,500 · Current $2,500 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards
that were likely to cause serious physical harm to employees, in that
employees were
required to perform tasks resulting in stressors that were causing, or
were likely to cause
musculoskeletal disorders (MSDs):
a)  On or about and continuing from January 30, 2003, sorters/sackers
reach, grasp
and lift stacks of magazines weighing up to 56 pounds. Employees bend and
reach in
order to place stacks of magazines onto pallets, which creates ergonomic
stressors
causing serious injuries to employees' backs and upper extremities.
Among other methods, feasible and acceptable abatement methods include the
following:
Engineering controls, including, but are not limited to, the following:
i.Place pallets to be loaded on scissor-lift tables which are accessible
to pallet
jacks. The use of lift tables will eliminate the need to bend over to place
bundles on the bottom levels of the pallet.
ii.Equip the lift tables with a turntable mechanism on top of the table so
that the
need for reaching can be significantly reduced.
iii.Remove backboards from any lines which utilize them. This will enable
employees to access all sides of the pallet and reduce the need for
reaching
and stretching.
Administrative controls, include, but are not limited to the following:
i. Implementation of a job rotation program in which employees would rotate
from sorter/sacker to a non-material handling position during their 12 hour
shift, if any are available.
ii.  Development of proper lifting techniques for employees to use when
lifting
and carrying materials to be stacked on a pallet. Train employees to take
smaller stacks.
iii. New employee work hardening policies which slowly work new employees
up
to a full 12 hour shift.
iv.Development of a monitoring program to ensure that all employees
continue to
use proper work practices.
Abatement should also include, the implementation of an ergonomics
management program
consisting of the following four elements:
1. Worksite analysis to recognize and identify existing cumulative trauma
disorders in the
workplace. This analysis should include development and use of an
ergonomic checklist and
employee questionnaire. Periodic surveys of the worksite shall be
conducted at least annually
to evaluate work practices and engineering controls. Employee
participation in the
ergonomics program should be encouraged.
2. Medical management which includes accurate recordkeeping of work-related
musculoskeletal disorders (WMSDs). The program should address early
recognition,
evaluation, and referral of WMSD cases, and should include conservative
treatment and
conservative return to work. Systematic worksite review by the medical
team should also be
included in the program.
3. Training and education of exposed employees, including methods to
evaluate the
effectiveness of the training. Re-training should be done annually, or as
operations change.
Training should address hazards associated with the job, the risks of
developing WMSDs,
symptoms of exposure, and how to prevent the occurrence of a WMSDs. A
supervisors'
training program should also be implemented to allow recognition of the
signs of WMSDs
and to reinforce the employer's ergonomic program.
4. Hazard prevention and control which includes engineering, work
practice,
and
administrative controls, and personal protective equipment where relevant.
a)  Engineering controls are designed by a qualified ergonomist and may
include work
station redesign, tool and handle redesign, and change of work methods.
The goal of
this program should be to make the job fit the person.
b)  Work practice controls are implemented which include proper work
techniques,
new employee conditioning, and monitoring and modifications as necessary to
minimize ergonomic stressors.
c)  Administrative controls are implemented which reduce the duration,
frequency,
and severity of exposure to ergonomic stress. These controls may include,
but are not
limited to, job rotation, reduction of repetitions, and preventative
maintenance of
related equipment. Personal protective equipment shall be evaluated to
determine any
contribution to ergonomic stress.
STEP 1: Submit to the Area Director a written plan to develop and
implement an ergonomic
management program and a detailed plan of abatement within 60 days
outlining a schedule
for the implementation of engineering and/or administrative measures to
control employee
exposure to stressors that were causing or likely to cause MSD's. This
plan shall include, at
a minimum, target dates for the following actions which must be consistent
with the
abatement dates required by this citation:
1. Evaluation of engineering/administrative control options;
2. Selection of optimum control methods and completion of design;3.
Procurement, installation, and operation of selected control measures; and
4. Testing and acceptance or modification/redesign of controls.
Progress reports shall be submitted every 45 days thereafter.
STEP 2: Abatement shall have been completed by the implementation of
feasible
engineering
and/or administrative controls upon verification of their effectiveness in
achieving
compliance.
Abatement certification and documentation required within 10 days after
abatement date.
The certification shall include a statement that abatement is complete,
the date and method of
abatement, and state that employees and their representatives were
informed of this
abatement.  Abatement documentation shall include documents demonstrating
that abatement
is complete, such as evidence of the purchase or repair of equipment,
photographic or video
evidence of abatement or other written records.
Recent events (2)
  • — F (S) $2500.00
  • — Z (S) $4500.00

1910.132 D01

Serious Gravity 02 1 instance 600 exposed
Issued
May 7, 2003
Abate by
Jun 9, 2003
Penalty
Initial $1,800 · Current $5,880
Recent events (2)
  • — I (S) $5880.00
  • — Z (S) $1800.00

1910.132 D02

Serious Gravity 01 1 instance 600 exposed
Issued
May 7, 2003
Abate by
Jun 9, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.132 F01

Serious Gravity 02 1 instance 600 exposed
Issued
May 7, 2003
Abate by
Jun 9, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.132 F04

Serious Gravity 01 1 instance 600 exposed
Issued
May 7, 2003
Abate by
Jun 9, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.133 A01

Serious Gravity 01 1 instance 80 exposed
Issued
May 7, 2003
Abate by
May 9, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.136 A

Serious Gravity 10 1 instance 80 exposed
Issued
May 7, 2003
Abate by
May 9, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.135 A01

Other-than-serious Gravity 05 1 instance 80 exposed
Issued
May 7, 2003
Abate by
May 9, 2003
Penalty
Initial $3,150
Recent events (2)
  • — I (O)
  • — Z (S) $3150.00

1910.178 L01

Serious Gravity 10 1 instance 30 exposed
Issued
May 7, 2003
Abate by
May 9, 2003
Penalty
Initial $4,500 · Current $1,800 Reduced
Recent events (2)
  • — I (S) $1800.00
  • — Z (S) $4500.00

1910.303 G01 II

Serious Gravity 01 1 instance 30 exposed
Issued
May 7, 2003
Abate by
May 12, 2003
Penalty
Initial $1,350 · Current $720 Reduced
Recent events (2)
  • — I (S) $720.00
  • — Z (S) $1350.00

1910.1200 H

Other-than-serious Gravity 01 1 instance 80 exposed
Issued
May 7, 2003
Abate by
May 9, 2003
Penalty
Initial $1,350 · Current $720 Reduced
Recent events (2)
  • — I (O) $720.00
  • — Z (S) $1350.00

1904.29 B01

Other-than-serious Gravity 00 1 instance 649 exposed
Issued
May 7, 2003
Abate by
May 9, 2003
Penalty
Initial $1,000 · Current $1,000
Recent events (2)
  • — I (O) $1000.00
  • — Z (O) $1000.00

1910.1200 F05 II

Other-than-serious Gravity 01 2 instances 80 exposed
Issued
May 7, 2003
Abate by
May 12, 2003
Recent events (2)
  • — I (O)
  • — Z (O)

View Brown Printing Company's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 305016115.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.