LINCOLNWOOD, IL —
OSHA Inspection: SCURTO CEMENT CONSTRUCTION LIMITED
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of SCURTO CEMENT CONSTRUCTION LIMITED in 3950 W. DEVON, LINCOLNWOOD, IL 60123 (NAICS 000000). OSHA activity number 305019655.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SCURTO CEMENT CONSTRUCTION LIMITED
- Site address
- 3950 W. DEVON
- City
- LINCOLNWOOD
- State
- IL
- ZIP
- 60123
- Mailing
- 1675 TODD FARM DRIVE, ELGIN, IL 60123
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1799
- Employees
- 2
- Ownership type
- A
Citations
1 citation on file for this inspection.
5(a)(1)
- Issued
- Jan 24, 2002
- Abate by
- Jan 29, 2002
- Penalty
- Initial $3,500 · Current $3,500
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a masonry wall collapse: 3950 W. Devon, Lincolnwood, Illinois - On October 25, 2001, two employees were tieing rebar at the base of a masonry wall. The wind speed on this day exceeded 38 mph. The wall, which measured 90 feet long X 21 feet 8 inches high, collapsed on the employees. One feasible means of abatement is to remove employees from the masonry wall restricted zone when the wind speed exceeds 35 mph. This requirement can be found in the Council for Masonry Construction's Standard Practice for Bracing Masonry walls During Construction, Section 1.2.1.2. No abatement certification or documentation is required for this item.
Recent events (2)
- — I (S) $3500.00
- — Z (S) $3500.00
More inspections in this industry (NAICS 000000)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 305019655.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.