PITTSBURGH, PA —
OSHA Inspection: MCCONWAY & TORLEY CORPORATION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MCCONWAY & TORLEY CORPORATION in 109 FORTY EIGHTH STREET, PITTSBURGH, PA 15201 (NAICS 000000). OSHA activity number 305102592.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MCCONWAY & TORLEY CORPORATION
- Site address
- 109 FORTY EIGHTH STREET
- City
- PITTSBURGH
- State
- PA
- ZIP
- 15201
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 3325
- Employees
- 160
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
6 citations on file for this inspection.
5(a)(1)
- Issued
- Sep 12, 2002
- Abate by
- Oct 15, 2002
- Penalty
- Initial $2,125
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to nip point of belt and pulley: (a) Pittsburgh, Pa., 109 48th Street, Foundry, Tail pulley of muller pan speed return; tail pulley located 3 feet from the floor surface had a 15 inch opening on a inadequate expanded metal guard. Among others, one abatement method which is acceptable to correct the hazard is as follows: Tail pulley is to be fully guarded. Often protective plates and adjustable end guards are required to cover nip-points between the belt and the end pulley.
Recent events (2)
- — J (S)
- — Z (S) $2125.00
1910.179 E06 I
- Issued
- Sep 12, 2002
- Abate by
- Sep 20, 2002
- Penalty
- Initial $1,700
Recent events (2)
- — J (S)
- — Z (S) $1700.00
1910.179 G02 I
- Issued
- Sep 12, 2002
- Abate by
- Sep 20, 2002
- Penalty
- Initial $1,700 · Current $875 Reduced
Recent events (2)
- — J (O) $875.00
- — Z (S) $1700.00
1910.179 G06
- Issued
- Sep 12, 2002
- Abate by
- Oct 15, 2002
- Penalty
- Initial $2,125 · Current $2,125
Recent events (2)
- — J (S) $2125.00
- — Z (S) $2125.00
1910.179 L02 II
- Issued
- Sep 12, 2002
- Abate by
- Sep 16, 2002
- Penalty
- Initial $1,700
Recent events (2)
- — J (O)
- — Z (S) $1700.00
1910.179 L03 III
- Issued
- Sep 12, 2002
- Abate by
- Oct 15, 2002
- Penalty
- Initial $2,125
Recent events (2)
- — J (S)
- — Z (S) $2125.00
More inspections at Mcconway & Torley Corporation
View Mcconway & Torley Corporation's full OSHA safety record →
More inspections in this industry (NAICS 000000)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 305102592.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.