POLAND, OH —
OSHA Inspection: S & W TOWER MAINTENANCE
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of S & W TOWER MAINTENANCE in 2635 WESTERN RESERVE RD., POLAND, OH 44501 (NAICS 000000). OSHA activity number 305325375.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- S & W TOWER MAINTENANCE
- Site address
- 2635 WESTERN RESERVE RD.
- City
- POLAND
- State
- OH
- ZIP
- 44501
- Mailing
- 2870 RHEINHARDT ST., EVANSVILLE, IN 47714
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1799
- Employees
- 5
- Ownership type
- A
Citations
3 citations on file for this inspection.
5(a)(1)
- Issued
- Aug 1, 2002
- Abate by
- Sep 3, 2002
- Penalty
- Initial $2,100 · Current $1,800 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to: Potential falls in excess of 200 feet at the WKBN tower erection site in Poland, OH: The employer was observed lowering a worker from the top of the tower under construction, a height of approximately 240 feet using a side mounted winch; the winch is not designed for personnel hoisting or lowering. Among other methods, feasible and acceptable methods to control the hazards are: 1. Ensure that the side mounted winch is never used for personnel hoisting or lowering; 2. In the event that workers are to be hoisted or lowered using powered hoisting system that the system meet all specifics required under the OSHA Compliance Directive CPL 2-1.29 Interim Inspection Procedures During Communication Tower Construction Activities. PLEASE NOTE: Abatement information needed for this item could include, but is not limited to: written company program demonstrating the proper hoisting/lowering methods per CPL2-1.29 on a certified personnel hoist system; no longer using the winch for personnel hoisting/lowering; and other pertinent information in proper personnel hoising/lowering.
Recent events (2)
- — F (S) $1800.00
- — Z (S) $2100.00
1926.21 B02
- Issued
- Aug 1, 2002
- Abate by
- Sep 3, 2002
- Penalty
- Initial $1,500
Recent events (2)
- — F (S)
- — Z (S) $1500.00
1926.150 A04
- Issued
- Aug 1, 2002
- Abate by
- Aug 6, 2002
Recent events (2)
- — F (O)
- — Z (O)
More inspections in this industry (NAICS 000000)
More inspections in OH
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 305325375.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.