EAGLE, ID —
OSHA Inspection: M & J ENTERPRISE INC.
Referral inspection · Safety discipline
At a glance
On , OSHA opened a referral safety inspection of M & J ENTERPRISE INC. in 3701 HIGHWAY 16, EAGLE, ID 83616 (NAICS 000000). OSHA activity number 305515041.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- M & J ENTERPRISE INC.
- Site address
- 3701 HIGHWAY 16
- City
- EAGLE
- State
- ID
- ZIP
- 83616
What kind of inspection was it?
- Inspection type
- Referral (C)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 000000
- SIC code (legacy)
- 1751
- Employees
- 4
- Ownership type
- A
Citations
4 citations on file for this inspection.
5(a)(1)
- Issued
- Jan 24, 2003
- Abate by
- Jan 30, 2003
- Penalty
- Initial $1,500 · Current $750 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish to each of his employees employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of structural collapse: (a)The Winery at Eagle Knoll construction site, Eagle, Idaho - On December 24, 2002, employees were exposed to the hazard of structural collapse of the truss system, since ground bracing, as a minimum, was not installed for the stability of the first truss. AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THE HAZARD IS TO FOLLOW THE GUIDANCE PROVIDED BY THE TRUSS PLATE INSTITUTE (HIB-91) SUMMARY SHEET FRAME 2 WHICH INSTRUCTS THAT GROUND BRACING IS REQUIRED FOR ALL INSTALLATIONS. (b)The Winery at Eagle Knoll construction site, Eagle, Idaho - On December 24, 2002, employees were exposed to the potential hazard of a collapse of the truss system, since continuous top chord temporary lateral bracing was not installed over the bearing points of any trusses greater than 10 inches in depth at the bearing points. AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THE HAZARD IS TO FOLLOW THE GUIDANCE PROVIDED BY THE TRUSS PLATE INSTITUTE (HIB-91) SUMMARY SHEET FRAME 3 WHICH INSTRUCTS THAT A CONTINUOUS TOP CHORD LATERAL BRACE BE INSTALLED OVER THE BEARING POINTS OF ALL TRUSSES GREATER THAN 10 INCHES IN DEPTH AT THE BEARING POINTS. (c)The Winery at Eagle Knoll construction site, Eagle, Idaho - On December 24,2002, employees were exposed to the potential hazard of a collapse of the truss system, since the employer failed to install lateral braces that would prevent structural collapse of the truss system. The braces installed only spanned between two trusses and not 6 trusses as required by the truss manufacturer. In addition, the braces did not overlapp at least 2 trusses per brace. The employer also failed to install two lateral braces at the apex of the truss placing one on each side of the apex. AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THE HAZARD IS TO FOLLOW THE GUIDANCE PROVIDED BY THE TRUSS PLATE INSTITUTE (HIB-91) SUMMARY SHEET FRAME 3 WHICH INSTRUCTS THAT A TOTAL OF SIX LATERAL BRACES WHICH SPAN SIX TRUSSES PER BRACE AND OVERLAPPED BY TWO TRUSSES FOR ADDITIONAL LENGTH OF THE LATERAL BRACE. LATERAL BRACES ARE INSTALLED IN THIS MANNERTO PREVENT STRUCTURAL COLLAPSE. (d)The Winery at Eagle Knoll construction site, Eagle, Idaho - On December 24, 2002 employees were exposed to the potential hazard of a collapse of the truss system, since there was no top chord temporary diagonal bracing installed to prevent laterally braced top cords from buckling and collapsing. AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THE HAZARD IS TO FOLLOW THE GUIDANCE PROVIDED BY THE TRUSS PLATE INSTITUTE (HIB-91) SUMMARY SHEET FRAME 3 WHICH INSTRUCTS THAT TOP CHORD DIAGONAL BRACING BE INSTALLED TO PREVENT TRUSSES THAT ARE ONLY LATERALLY BRACED FROM BUCKLING AND COLLAPSING. (e)The Winery at Eagle Knoll construction site, Eagle, Idaho - On December 24, 2002, employees were exposed to the hazard of structural collapse of the truss system, since bottom chord temporary (or permanent) lateral and diagonal bracing was not installed. AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THE HAZARD IS TO FOLLOW THE GUIDANCE PROVIDED BY THE TRUSS PLATE INSTITUTE (HIB- 91) SUMMARY SHEET FRAME 4 (BOTTOM CHORD PLANE) WHICH INSTRUCTS THAT LATERAL AND DIAGONAL TEMPORARY BRACING BE INSTALLED TO PREVENT STRUCTURAL COLLAPSE. (f)The Winery at Eagle Knoll construction site, Eagle, Idaho - On December 24, 2002, employees were exposed to the potential hazard of a collapse of the truss system, since the employer failed to install a pair of temporary cross bracing within the trusses at the end of the building and repeated at 20 ft. intervals. AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE ABATEMENT METHOD TO CORRECT THE HAZARD IS TO FOLLOW THE GUIDANCE PROVIDED BY THE TRUSS PLATE INSTITUTE (HIB-91) SUMMARY SHEET FRAME 4 (WEB MEMBER PLANE) WHICH INSTRUCTS THAT TEMPORARY CROSS BRACING BE INSTALLED AT EACH END OF THE BUILDING AND REPEATED AT 20 FT. INTERVALS TO PREVENT STRUCTURAL COLLAPSE OF THE TRUSSES. (g)The Winery at Eagle Knoll construction site, Eagle, Idaho - On December 24, 2002, employees were exposed to the hazard of structural collapse of the truss system, since the trusses were installed without the use of a stringline, plumb bob, level or transit. AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLEABATEMENT METHOD TO CORRECT THIS HAZARD IS TO FOLLOW THE GUIDANCE PROVIDED BY THE TRUSS PLATE INSTITUTE (HIB-91) SUMMMARY SHEET (INSTALLATION TOLERANCES) FRAME 6 WHICH INSTRUCTS THAT OUT-OF-PLANE AND OUT-OF PLUMB INSTALLATION BE AVOIDED. Note: Abatement certification required for this item.
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1926.20 B01
- Issued
- Jan 24, 2003
- Abate by
- Jan 30, 2003
- Penalty
- Initial $1,500 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1500.00
1926.20 B02
- Issued
- Jan 24, 2003
- Abate by
- Jan 30, 2003
Recent events (2)
- — I (S)
- — Z (S)
1926.21 B02
- Issued
- Jan 24, 2003
- Abate by
- Jan 30, 2003
Recent events (2)
- — I (S)
- — Z (S)
More inspections in this industry (NAICS 000000)
More inspections in ID
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 305515041.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.