OSHA Inspection: ALLEN CANNING COMPANY

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ALLEN CANNING COMPANY in 1581 HWY 114, HESSMER, LA 71341 (NAICS 311421). OSHA activity number 305957995.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Allen Canning Company — free Get an email when a new federal OSHA severe-injury report for Allen Canning Company is published. One employer, no account, unsubscribe in one click.
Site address
1581 HWY 114
City
HESSMER
State
LA
ZIP
71341
Mailing
1581 HWY. 114, HESSMER, LA 71341
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
311421
SIC code (legacy)
2033
Employees
350
Ownership type
A

53 citations on file for this inspection.

5(a)(1)

Serious Gravity 03 2 instances 10 exposed
Issued
Sep 5, 2003
Abate by
Sep 15, 2003
Penalty
Initial $2,250 · Current $1,575 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer does not
furnish employment and a place of employment which are free from
recognized hazards that are
causing or likely to cause death or serious physical harm to employees
exposed to hazards of
operating powered industrial trucks.  The employer violated this section
of the Act on or about
March 13, 2003, at various locations; in the dry bean area, a powered
industrial truck operator
was allowed to operate a propane fueled Nissan industrial truck (ID#130)
without utilizing its
seatbelt.  This condition exposed the operator to crushing injuries in the
event the truck would
tip over during operation; In warehouse number 2, a powered industrial
truck operator was
allowed to operate a propane fueled Nissan industrial truck (ID#97)
without utilizing its seatbelt.
This condition exposed the operator to crushing injuries in the event the
truck would tip over
during operation.
Among other methods, one feasible and acceptable abatement method to
correct this
hazard is to ensure that operators of powered industrial trucks utilize
the seatbelt
provided by the manufacturer.
DISCLAIMERS:
1)  You are not limited to the abatement methods suggested above.
2)  The methods explained are general and may not be effective in all
cases.
3)  The employer is responsible for selecting and carrying out an
appropriate
method.
"Pursuant to 29 CFR 1903.19(d), the employer must provide documentation
that this
violation has been abated within 10 calendar days after the abatement
date."
Recent events (2)
  • — I (S) $1575.00
  • — Z (S) $2250.00

5(a)(1)

Serious Gravity 01 2 instances 4 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $1,350 · Current $945 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer does not
furnish employment and a place of employment which are free from
recognized hazards that are
causing or likely to cause death or serious physical harm to employees in
that employees are
exposed to the recognized hazard of being struck by falling portions of
the hoisted load(s) on
overhead hoists.  The employer violated this section of the Act on or
about March 13, 2003, at
various locations: The Dayton 2 ton electric overhead hoist located along
the north side of
warehouse #2, had a in-operable latch on its load hook, and the hoist was
not inspected daily
to ensure all safety devices were functioning appropriately.  This hoist
was
utilized to lift and
maneuver batteries for powered industrial trucks.
Among other methods, one feasible and acceptable abatement method to
correct this
hazard is to provide a load hook with an operable latch, in accordance
with Paragraph
16-2.1.2.10(d) of the American National Standards Institute (ANSI)
B30.16-1973,
Overhead Hoists.
Among other methods, one feasible and acceptable abatement method to
correct this
hazard is to determine the load rating capacity of the overhead structure
on which the
hoist is mounted, in accordance with Paragraph 16-2.1.3.6 of the American
National
Standards Institute (ANSI) B30.16-1973, Overhead Hoists.
Among other methods, one feasible and acceptable abatement method to
correct this
hazard is to perform frequent inspections (daily) of all safety devices to
determine
malfunctions, in accordance with Paragraph 16-2.2.1.2(b) of the American
National
Standards Institute (ANSI) B30.16-1973, Overhead Hoists.
b)The P & H 250 pound capacity, electric overhead hoist located in the
maintenance shop did not have inspections conducted to ensure safe
operating
conditions.  This hoist was utilized for material handling.
Among other methods, one feasible and acceptable abatement method to
correct this
hazard is to determine the load rating capacity of the overhead structure
on which the
hoist is mounted, in accordance with Paragraph 16-2.1.3.6 of the American
National
Standards Institute (ANSI) B30.16-1973, Overhead Hoists.
DISCLAIMERS:
1.  You are not limited to the abatement methods suggested above.
2.  The methods explained are general and may not be effective in all
cases.
3.  The employer is responsible for selecting and carrying out an
appropriate method.
"Pursuant to 29 CFR 1903.19(d), the employer must provide documentation
that this
violation has been abated within 10 calendar days after the abatement
date."
Recent events (2)
  • — I (S) $945.00
  • — Z (S) $1350.00

1910.22 A01

Serious Gravity 01 4 instances 20 exposed
Issued
Sep 5, 2003
Abate by
Oct 1, 2003
Penalty
Initial $1,350 · Current $945 Reduced
Recent events (2)
  • — I (S) $945.00
  • — Z (S) $1350.00

1910.22 A02

Serious Gravity 05 2 instances 20 exposed
Issued
Sep 5, 2003
Abate by
Sep 24, 2003
Penalty
Initial $3,150 · Current $2,205 Reduced
Recent events (2)
  • — I (S) $2205.00
  • — Z (S) $3150.00

1910.22 C

Serious Gravity 05 2 instances 4 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $3,150 · Current $2,205 Reduced
Recent events (2)
  • — I (S) $2205.00
  • — Z (S) $3150.00

1910.23 A02

Serious Gravity 10 3 instances 4 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $4,500 · Current $3,150 Reduced
Recent events (2)
  • — I (S) $3150.00
  • — Z (S) $4500.00

1910.23 A08

Serious Gravity 01 4 instances 5 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $1,350 · Current $945 Reduced
Recent events (2)
  • — I (S) $945.00
  • — Z (S) $1350.00

1910.23 C01

Serious Gravity 10 5 instances 7 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $4,500 · Current $3,150 Reduced
Recent events (2)
  • — I (S) $3150.00
  • — Z (S) $4500.00

1910.23 D01 IV

Serious Gravity 04 2 instances 40 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $2,250 · Current $1,575 Reduced
Recent events (2)
  • — I (S) $1575.00
  • — Z (S) $2250.00

1910.23 D01 III

Serious Gravity 04 1 instance 3 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.23 E01

Serious Gravity 01 2 instances 2 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $1,350 · Current $945 Reduced
Recent events (2)
  • — I (S) $945.00
  • — Z (S) $1350.00

1910.27 D03

Serious Gravity 01 2 instances 4 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $1,350 · Current $945 Reduced
Recent events (2)
  • — I (S) $945.00
  • — Z (S) $1350.00

1910.28 A12

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $4,500 · Current $3,150 Reduced
Recent events (2)
  • — I (S) $3150.00
  • — Z (S) $4500.00

1910.28 A13

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $4,500 · Current $3,150 Reduced
Recent events (2)
  • — I (S) $3150.00
  • — Z (S) $4500.00

1910.28 D07

Serious Gravity 10 1 instance 2 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $4,500 · Current $3,150 Reduced
Recent events (2)
  • — I (S) $3150.00
  • — Z (S) $4500.00

1910.37 A03

Serious Gravity 10 2 instances 12 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $4,500 · Current $3,150 Reduced
Recent events (2)
  • — I (S) $3150.00
  • — Z (S) $4500.00

1910.37 B02

Serious Gravity 01 6 instances 20 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $1,350 · Current $945 Reduced
Recent events (2)
  • — I (S) $945.00
  • — Z (S) $1350.00

1910.37 B05

Serious Gravity 01 2 instances 12 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.37 B04

Serious Gravity 02 2 instances 5 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $1,800 · Current $1,260 Reduced
Recent events (2)
  • — I (S) $1260.00
  • — Z (S) $1800.00

1910.37 B06

Serious Gravity 02 3 instances 20 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.132 A

Serious Gravity 02 1 instance 1 exposed
Issued
Sep 5, 2003
Abate by
Sep 11, 2003
Penalty
Initial $1,800 · Current $1,260 Reduced
Recent events (2)
  • — I (S) $1260.00
  • — Z (S) $1800.00

1910.133 A01

Serious Gravity 02 1 instance 1 exposed
Issued
Sep 5, 2003
Abate by
Sep 11, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.138 A

Serious Gravity 02 1 instance 1 exposed
Issued
Sep 5, 2003
Abate by
Sep 11, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.147 C04 II

Serious Gravity 10 1 instance 5 exposed
Issued
Sep 5, 2003
Abate by
Oct 1, 2003
Penalty
Initial $4,500 · Current $3,150 Reduced
Recent events (2)
  • — I (S) $3150.00
  • — Z (S) $4500.00

1910.147 C07 IB

Serious Gravity 03 1 instance 300 exposed
Issued
Sep 5, 2003
Abate by
Sep 24, 2003
Penalty
Initial $2,250 · Current $1,575 Reduced
Recent events (2)
  • — I (S) $1575.00
  • — Z (S) $2250.00

1910.157 C04

Serious Gravity 04 4 instances 3 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $2,250 · Current $1,575 Reduced
Recent events (2)
  • — I (S) $1575.00
  • — Z (S) $2250.00

1910.178 L02 II

Serious Gravity 02 1 instance 43 exposed
Issued
Sep 5, 2003
Abate by
Oct 1, 2003
Penalty
Initial $1,800 · Current $1,260 Reduced
Recent events (2)
  • — I (S) $1260.00
  • — Z (S) $1800.00

1910.178 M05 III

Serious Gravity 02 1 instance 1 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $1,800 · Current $1,260 Reduced
Recent events (2)
  • — I (S) $1260.00
  • — Z (S) $1800.00

1910.212 A01

Serious Gravity 02 5 instances 12 exposed
Issued
Sep 5, 2003
Abate by
Oct 1, 2003
Penalty
Initial $1,800 · Current $1,260 Reduced
Recent events (2)
  • — I (S) $1260.00
  • — Z (S) $1800.00

1910.212 A05

Serious Gravity 01 1 instance 3 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $1,350 · Current $945 Reduced
Recent events (2)
  • — I (S) $945.00
  • — Z (S) $1350.00

1910.215 A04

Serious Gravity 02 4 instances 7 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $1,800 · Current $1,260 Reduced
Recent events (2)
  • — I (S) $1260.00
  • — Z (S) $1800.00

1910.215 B09

Serious Gravity 01 1 instance 5 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.215 D03

Serious Gravity 02 2 instances 5 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $1,800 · Current $1,260 Reduced
Recent events (2)
  • — I (S) $1260.00
  • — Z (S) $1800.00

1910.219 E03 I

Serious Gravity 10 3 instances 3 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $4,500 · Current $3,150 Reduced
Recent events (2)
  • — I (S) $3150.00
  • — Z (S) $4500.00

1910.219 F03

Serious Gravity 03 5 instances 6 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.253 B02 IV

Serious Gravity 05 2 instances 7 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $3,150 · Current $2,205 Reduced
Recent events (2)
  • — I (S) $2205.00
  • — Z (S) $3150.00

1910.253 B04 III

Serious Gravity 05 2 instances 7 exposed
Issued
Sep 5, 2003
Abate by
Sep 11, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.254 D09 III

Serious Gravity 01 2 instances 7 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $1,350 · Current $945 Reduced
Recent events (2)
  • — I (S) $945.00
  • — Z (S) $1350.00

1910.303 B01

Serious Gravity 02 3 instances 4 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $1,800 · Current $1,260 Reduced
Recent events (2)
  • — I (S) $1260.00
  • — Z (S) $1800.00

1910.303 B01 II

Serious Gravity 01 1 instance 3 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.305 J01 I

Serious Gravity 02 2 instances 10 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Recent events (2)
  • — I (S)
  • — Z (S)

1910.303 B02

Serious Gravity 03 3 instances 2 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $2,250 · Current $1,575 Reduced
Recent events (2)
  • — I (S) $1575.00
  • — Z (S) $2250.00

1910.303 F

Serious Gravity 05 8 instances 5 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $3,150 · Current $2,205 Reduced
Recent events (2)
  • — I (S) $2205.00
  • — Z (S) $3150.00

1910.303 G01

Serious Gravity 05 3 instances 4 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $3,150 · Current $2,205 Reduced
Recent events (2)
  • — I (S) $2205.00
  • — Z (S) $3150.00

1910.303 G01 IV

Serious Gravity 01 1 instance 5 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $1,350 · Current $945 Reduced
Recent events (2)
  • — I (S) $945.00
  • — Z (S) $1350.00

1910.304 F04

Serious Gravity 03 2 instances 6 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $2,250 · Current $1,575 Reduced
Recent events (2)
  • — I (S) $1575.00
  • — Z (S) $2250.00

1910.305 A02 IIIG

Serious Gravity 01 4 instances 10 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $1,350 · Current $945 Reduced
Recent events (2)
  • — I (S) $945.00
  • — Z (S) $1350.00

1910.305 B01

Serious Gravity 03 9 instances 12 exposed
Issued
Sep 5, 2003
Abate by
Sep 11, 2003
Penalty
Initial $2,250 · Current $1,575 Reduced
Recent events (2)
  • — I (S) $1575.00
  • — Z (S) $2250.00

1910.305 B02

Serious Gravity 10 6 instances 7 exposed
Issued
Sep 5, 2003
Abate by
Sep 17, 2003
Penalty
Initial $4,500 · Current $3,150 Reduced
Recent events (2)
  • — I (S) $3150.00
  • — Z (S) $4500.00

1910.305 E01

Serious Gravity 10 1 instance 5 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $4,500 · Current $3,150 Reduced
Recent events (2)
  • — I (S) $3150.00
  • — Z (S) $4500.00

1910.305 G01 III

Serious Gravity 02 4 instances 10 exposed
Issued
Sep 5, 2003
Abate by
Sep 10, 2003
Penalty
Initial $1,800 · Current $1,260 Reduced
Recent events (2)
  • — I (S) $1260.00
  • — Z (S) $1800.00

1910.305 G02 III

Serious Gravity 01 2 instances 5 exposed
Issued
Sep 5, 2003
Abate by
Sep 12, 2003
Penalty
Initial $1,350 · Current $945 Reduced
Recent events (2)
  • — I (S) $945.00
  • — Z (S) $1350.00

1910.334 A02 I

Serious Gravity 05 9 instances 11 exposed
Issued
Sep 5, 2003
Abate by
Oct 1, 2003
Penalty
Initial $3,150 · Current $2,205 Reduced
Recent events (2)
  • — I (S) $2205.00
  • — Z (S) $3150.00

View Allen Canning Company's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 305957995.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.