HESSMER, LA —
OSHA Inspection: ALLEN CANNING COMPANY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ALLEN CANNING COMPANY in 1581 HWY 114, HESSMER, LA 71341 (NAICS 311421). OSHA activity number 305957995.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ALLEN CANNING COMPANY
- Site address
- 1581 HWY 114
- City
- HESSMER
- State
- LA
- ZIP
- 71341
- Mailing
- 1581 HWY. 114, HESSMER, LA 71341
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 311421
- SIC code (legacy)
- 2033
- Employees
- 350
- Ownership type
- A
Citations
53 citations on file for this inspection.
5(a)(1)
- Issued
- Sep 5, 2003
- Abate by
- Sep 15, 2003
- Penalty
- Initial $2,250 · Current $1,575 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer does not furnish employment and a place of employment which are free from recognized hazards that are causing or likely to cause death or serious physical harm to employees exposed to hazards of operating powered industrial trucks. The employer violated this section of the Act on or about March 13, 2003, at various locations; in the dry bean area, a powered industrial truck operator was allowed to operate a propane fueled Nissan industrial truck (ID#130) without utilizing its seatbelt. This condition exposed the operator to crushing injuries in the event the truck would tip over during operation; In warehouse number 2, a powered industrial truck operator was allowed to operate a propane fueled Nissan industrial truck (ID#97) without utilizing its seatbelt. This condition exposed the operator to crushing injuries in the event the truck would tip over during operation. Among other methods, one feasible and acceptable abatement method to correct this hazard is to ensure that operators of powered industrial trucks utilize the seatbelt provided by the manufacturer. DISCLAIMERS: 1) You are not limited to the abatement methods suggested above. 2) The methods explained are general and may not be effective in all cases. 3) The employer is responsible for selecting and carrying out an appropriate method. "Pursuant to 29 CFR 1903.19(d), the employer must provide documentation that this violation has been abated within 10 calendar days after the abatement date."
Recent events (2)
- — I (S) $1575.00
- — Z (S) $2250.00
5(a)(1)
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $1,350 · Current $945 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer does not furnish employment and a place of employment which are free from recognized hazards that are causing or likely to cause death or serious physical harm to employees in that employees are exposed to the recognized hazard of being struck by falling portions of the hoisted load(s) on overhead hoists. The employer violated this section of the Act on or about March 13, 2003, at various locations: The Dayton 2 ton electric overhead hoist located along the north side of warehouse #2, had a in-operable latch on its load hook, and the hoist was not inspected daily to ensure all safety devices were functioning appropriately. This hoist was utilized to lift and maneuver batteries for powered industrial trucks. Among other methods, one feasible and acceptable abatement method to correct this hazard is to provide a load hook with an operable latch, in accordance with Paragraph 16-2.1.2.10(d) of the American National Standards Institute (ANSI) B30.16-1973, Overhead Hoists. Among other methods, one feasible and acceptable abatement method to correct this hazard is to determine the load rating capacity of the overhead structure on which the hoist is mounted, in accordance with Paragraph 16-2.1.3.6 of the American National Standards Institute (ANSI) B30.16-1973, Overhead Hoists. Among other methods, one feasible and acceptable abatement method to correct this hazard is to perform frequent inspections (daily) of all safety devices to determine malfunctions, in accordance with Paragraph 16-2.2.1.2(b) of the American National Standards Institute (ANSI) B30.16-1973, Overhead Hoists. b)The P & H 250 pound capacity, electric overhead hoist located in the maintenance shop did not have inspections conducted to ensure safe operating conditions. This hoist was utilized for material handling. Among other methods, one feasible and acceptable abatement method to correct this hazard is to determine the load rating capacity of the overhead structure on which the hoist is mounted, in accordance with Paragraph 16-2.1.3.6 of the American National Standards Institute (ANSI) B30.16-1973, Overhead Hoists. DISCLAIMERS: 1. You are not limited to the abatement methods suggested above. 2. The methods explained are general and may not be effective in all cases. 3. The employer is responsible for selecting and carrying out an appropriate method. "Pursuant to 29 CFR 1903.19(d), the employer must provide documentation that this violation has been abated within 10 calendar days after the abatement date."
Recent events (2)
- — I (S) $945.00
- — Z (S) $1350.00
1910.22 A01
- Issued
- Sep 5, 2003
- Abate by
- Oct 1, 2003
- Penalty
- Initial $1,350 · Current $945 Reduced
Recent events (2)
- — I (S) $945.00
- — Z (S) $1350.00
1910.22 A02
- Issued
- Sep 5, 2003
- Abate by
- Sep 24, 2003
- Penalty
- Initial $3,150 · Current $2,205 Reduced
Recent events (2)
- — I (S) $2205.00
- — Z (S) $3150.00
1910.22 C
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $3,150 · Current $2,205 Reduced
Recent events (2)
- — I (S) $2205.00
- — Z (S) $3150.00
1910.23 A02
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $4,500 · Current $3,150 Reduced
Recent events (2)
- — I (S) $3150.00
- — Z (S) $4500.00
1910.23 A08
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $1,350 · Current $945 Reduced
Recent events (2)
- — I (S) $945.00
- — Z (S) $1350.00
1910.23 C01
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $4,500 · Current $3,150 Reduced
Recent events (2)
- — I (S) $3150.00
- — Z (S) $4500.00
1910.23 D01 IV
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $2,250 · Current $1,575 Reduced
Recent events (2)
- — I (S) $1575.00
- — Z (S) $2250.00
1910.23 D01 III
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
Recent events (2)
- — I (S)
- — Z (S)
1910.23 E01
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $1,350 · Current $945 Reduced
Recent events (2)
- — I (S) $945.00
- — Z (S) $1350.00
1910.27 D03
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $1,350 · Current $945 Reduced
Recent events (2)
- — I (S) $945.00
- — Z (S) $1350.00
1910.28 A12
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $4,500 · Current $3,150 Reduced
Recent events (2)
- — I (S) $3150.00
- — Z (S) $4500.00
1910.28 A13
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $4,500 · Current $3,150 Reduced
Recent events (2)
- — I (S) $3150.00
- — Z (S) $4500.00
1910.28 D07
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $4,500 · Current $3,150 Reduced
Recent events (2)
- — I (S) $3150.00
- — Z (S) $4500.00
1910.37 A03
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $4,500 · Current $3,150 Reduced
Recent events (2)
- — I (S) $3150.00
- — Z (S) $4500.00
1910.37 B02
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $1,350 · Current $945 Reduced
Recent events (2)
- — I (S) $945.00
- — Z (S) $1350.00
1910.37 B05
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
Recent events (2)
- — I (S)
- — Z (S)
1910.37 B04
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $1,800 · Current $1,260 Reduced
Recent events (2)
- — I (S) $1260.00
- — Z (S) $1800.00
1910.37 B06
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
Recent events (2)
- — I (S)
- — Z (S)
1910.132 A
- Issued
- Sep 5, 2003
- Abate by
- Sep 11, 2003
- Penalty
- Initial $1,800 · Current $1,260 Reduced
Recent events (2)
- — I (S) $1260.00
- — Z (S) $1800.00
1910.133 A01
- Issued
- Sep 5, 2003
- Abate by
- Sep 11, 2003
Recent events (2)
- — I (S)
- — Z (S)
1910.138 A
- Issued
- Sep 5, 2003
- Abate by
- Sep 11, 2003
Recent events (2)
- — I (S)
- — Z (S)
1910.147 C04 II
- Issued
- Sep 5, 2003
- Abate by
- Oct 1, 2003
- Penalty
- Initial $4,500 · Current $3,150 Reduced
Recent events (2)
- — I (S) $3150.00
- — Z (S) $4500.00
1910.147 C07 IB
- Issued
- Sep 5, 2003
- Abate by
- Sep 24, 2003
- Penalty
- Initial $2,250 · Current $1,575 Reduced
Recent events (2)
- — I (S) $1575.00
- — Z (S) $2250.00
1910.157 C04
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $2,250 · Current $1,575 Reduced
Recent events (2)
- — I (S) $1575.00
- — Z (S) $2250.00
1910.178 L02 II
- Issued
- Sep 5, 2003
- Abate by
- Oct 1, 2003
- Penalty
- Initial $1,800 · Current $1,260 Reduced
Recent events (2)
- — I (S) $1260.00
- — Z (S) $1800.00
1910.178 M05 III
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $1,800 · Current $1,260 Reduced
Recent events (2)
- — I (S) $1260.00
- — Z (S) $1800.00
1910.212 A01
- Issued
- Sep 5, 2003
- Abate by
- Oct 1, 2003
- Penalty
- Initial $1,800 · Current $1,260 Reduced
Recent events (2)
- — I (S) $1260.00
- — Z (S) $1800.00
1910.212 A05
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $1,350 · Current $945 Reduced
Recent events (2)
- — I (S) $945.00
- — Z (S) $1350.00
1910.215 A04
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $1,800 · Current $1,260 Reduced
Recent events (2)
- — I (S) $1260.00
- — Z (S) $1800.00
1910.215 B09
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
Recent events (2)
- — I (S)
- — Z (S)
1910.215 D03
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $1,800 · Current $1,260 Reduced
Recent events (2)
- — I (S) $1260.00
- — Z (S) $1800.00
1910.219 E03 I
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $4,500 · Current $3,150 Reduced
Recent events (2)
- — I (S) $3150.00
- — Z (S) $4500.00
1910.219 F03
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
Recent events (2)
- — I (S)
- — Z (S)
1910.253 B02 IV
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $3,150 · Current $2,205 Reduced
Recent events (2)
- — I (S) $2205.00
- — Z (S) $3150.00
1910.253 B04 III
- Issued
- Sep 5, 2003
- Abate by
- Sep 11, 2003
Recent events (2)
- — I (S)
- — Z (S)
1910.254 D09 III
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $1,350 · Current $945 Reduced
Recent events (2)
- — I (S) $945.00
- — Z (S) $1350.00
1910.303 B01
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $1,800 · Current $1,260 Reduced
Recent events (2)
- — I (S) $1260.00
- — Z (S) $1800.00
1910.303 B01 II
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
Recent events (2)
- — I (S)
- — Z (S)
1910.305 J01 I
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
Recent events (2)
- — I (S)
- — Z (S)
1910.303 B02
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $2,250 · Current $1,575 Reduced
Recent events (2)
- — I (S) $1575.00
- — Z (S) $2250.00
1910.303 F
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $3,150 · Current $2,205 Reduced
Recent events (2)
- — I (S) $2205.00
- — Z (S) $3150.00
1910.303 G01
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $3,150 · Current $2,205 Reduced
Recent events (2)
- — I (S) $2205.00
- — Z (S) $3150.00
1910.303 G01 IV
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $1,350 · Current $945 Reduced
Recent events (2)
- — I (S) $945.00
- — Z (S) $1350.00
1910.304 F04
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $2,250 · Current $1,575 Reduced
Recent events (2)
- — I (S) $1575.00
- — Z (S) $2250.00
1910.305 A02 IIIG
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $1,350 · Current $945 Reduced
Recent events (2)
- — I (S) $945.00
- — Z (S) $1350.00
1910.305 B01
- Issued
- Sep 5, 2003
- Abate by
- Sep 11, 2003
- Penalty
- Initial $2,250 · Current $1,575 Reduced
Recent events (2)
- — I (S) $1575.00
- — Z (S) $2250.00
1910.305 B02
- Issued
- Sep 5, 2003
- Abate by
- Sep 17, 2003
- Penalty
- Initial $4,500 · Current $3,150 Reduced
Recent events (2)
- — I (S) $3150.00
- — Z (S) $4500.00
1910.305 E01
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $4,500 · Current $3,150 Reduced
Recent events (2)
- — I (S) $3150.00
- — Z (S) $4500.00
1910.305 G01 III
- Issued
- Sep 5, 2003
- Abate by
- Sep 10, 2003
- Penalty
- Initial $1,800 · Current $1,260 Reduced
Recent events (2)
- — I (S) $1260.00
- — Z (S) $1800.00
1910.305 G02 III
- Issued
- Sep 5, 2003
- Abate by
- Sep 12, 2003
- Penalty
- Initial $1,350 · Current $945 Reduced
Recent events (2)
- — I (S) $945.00
- — Z (S) $1350.00
1910.334 A02 I
- Issued
- Sep 5, 2003
- Abate by
- Oct 1, 2003
- Penalty
- Initial $3,150 · Current $2,205 Reduced
Recent events (2)
- — I (S) $2205.00
- — Z (S) $3150.00
More inspections at Allen Canning Company
View Allen Canning Company's full OSHA safety record →
More inspections in this industry (NAICS 311421)
More inspections in LA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 305957995.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.