OSHA Inspection: PLAQUEMINE POINT SHIPYARD

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of PLAQUEMINE POINT SHIPYARD in 1070 RIVER ROAD, SUNSHINE, LA 70780 (NAICS 336611). OSHA activity number 305961070.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Plaquemine Point Shipyard — free Get an email when a new federal OSHA severe-injury report for Plaquemine Point Shipyard is published. One employer, no account, unsubscribe in one click.
Site address
1070 RIVER ROAD
City
SUNSHINE
State
LA
ZIP
70780
Inspection type
Complaint (B)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
336611
SIC code (legacy)
3731
Employees
30
Ownership type
A

38 citations on file for this inspection.

5(a)(1)

Serious Gravity 02 8 instances 8 exposed
Issued
Oct 23, 2003
Abate by
Oct 23, 2003
Penalty
Initial $1,000 · Current $198 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish to each of his employees a place of employment which was free from
recognized hazards
that were causing or likely to cause death or serious physical harm to
employees in that
employees were exposed to the hazard of being struck by unsecured air hose
connections.
a)  On the port midships of the SBI 551 barge, where eight air hose
connections were
not secured together with retainer clips or lanyards.  These hoses were
used to provide
air to air horns for ventilating cargo tanks during painting operations.
Employees were
exposed to a struck-by hazard.
Among other methods, one feasible and acceptable method for abatement is
to properly
secure the hose couplings with safety clips, retainers or other positive
means to prevent
the couplings from becoming disconnected in accordance with manufacturer
recommendations.
Disclaimers:
1.  You are not limited to the abatement methods suggested above.
2.  The methods explained are general and may not be effective in all
cases.
3.  The employer is responsible for selecting and carrying out an
appropriate method of
abatement.
Recent events (2)
  • — F (S) $198.00
  • — Z (S) $1000.00

5(a)(1)

Serious Gravity 03 1 instance 12 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,250 · Current $235 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish to each of his employees a place of employment which was free from
recognized hazards
that were causing or likely to cause death or serious physical harm to
employees in that
employees were exposed to the hazard of being struck by falling portions
of the hoisted load or
the hoist of the Load Lifter underhung crane located in the Machine Shop.
a)  Among other methods, one feasible and acceptable method to correct
this hazard is
to perform "frequent" inspections in accordance with American National
Standard
Institute (ANSI) B30.11-1998, 11-2.1.2 and "periodic" inspections in
accordance with
ANSI B30.11-1998, 11-2.1.3, Monorail Systems and Underhung Cranes. This
condition
exposed employees to a struck-by hazard.
Disclaimers:
1. You are not limited to the abatement methods suggested above.
2. The methods explained are general and may not be effective in all cases.
3. The employer is responsible for selecting and carrying out an
appropriate method of
abatement.e
Recent events (2)
  • — F (S) $235.00
  • — Z (S) $1250.00

5(a)(1)

Serious Gravity 03 1 instance 12 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,250 · Current $235 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish to each of his employees a place of employment which was free from
recognized hazards
that were causing or likely to cause death or serious physical harm to
employees in that
employees were exposed to the hazard of being struck by falling portions
of the hoisted load or
the hoist of the Pettibone Mobile Hydraulic Crane.
a)  Among other methods, one feasible and acceptable method to correct
this
hazard is
to install a Two-Block Damage Preventive device in accordance with the
American
National Standard Institute (ANSI) B30.15-1973, 15-1.3.2.d. This condition
exposed
employees to a struck-by hazard.
Disclaimers:
1. You are not limited to the abatement methods suggested above.
2. The methods explained are general and may not be effective in all cases.
3. The employer is responsible for selecting and carrying out an
appropriate method of
abatement.e
Recent events (2)
  • — F (S) $235.00
  • — Z (S) $1250.00

1910.27 C04

Serious Gravity 03 1 instance 2 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,250 · Current $235 Reduced
Recent events (2)
  • — F (S) $235.00
  • — Z (S) $1250.00

1910.106 D03 II

Serious Gravity 01 1 instance 8 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $750 · Current $141 Reduced
Recent events (2)
  • — F (S) $141.00
  • — Z (S) $750.00

1910.107 E02

Serious Gravity 03 1 instance 1 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,250 · Current $235 Reduced
Recent events (2)
  • — F (S) $235.00
  • — Z (S) $1250.00

1910.134 I07

Serious Gravity 03 1 instance 4 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,250 · Current $235 Reduced
Recent events (2)
  • — F (S) $235.00
  • — Z (S) $1250.00

1910.151 C

Serious Gravity 05 1 instance 4 exposed
Issued
Oct 23, 2003
Abate by
Oct 23, 2003
Penalty
Initial $1,750 · Current $329 Reduced
Recent events (2)
  • — F (S) $329.00
  • — Z (S) $1750.00

1910.215 A04

Serious Gravity 01 1 instance 10 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $750 · Current $141 Reduced
Recent events (2)
  • — F (S) $141.00
  • — Z (S) $750.00

1910.215 B09

Serious Gravity 01 1 instance 10 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $750 · Current $141 Reduced
Recent events (2)
  • — F (S) $141.00
  • — Z (S) $750.00

1910.219 F01

Serious Gravity 05 4 instances 2 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,750 · Current $329 Reduced
Recent events (2)
  • — F (S) $329.00
  • — Z (S) $1750.00

1910.303 G01 I

Serious Gravity 01 1 instance 1 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $750 · Current $141 Reduced
Recent events (2)
  • — F (S) $141.00
  • — Z (S) $750.00

1910.305 B01

Serious Gravity 03 8 instances 5 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,250 · Current $235 Reduced
Recent events (2)
  • — F (S) $235.00
  • — Z (S) $1250.00

1910.305 G02 III

Serious Gravity 01 1 instance 6 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $750 · Current $141 Reduced
Recent events (2)
  • — F (S) $141.00
  • — Z (S) $750.00

1910.334 A02 I

Serious Gravity 03 1 instance 6 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,250 · Current $235 Reduced
Recent events (2)
  • — F (S) $235.00
  • — Z (S) $1250.00

1910.1200 F05 I

Serious Gravity 01 1 instance 1 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $750 · Current $141 Reduced
Recent events (2)
  • — F (S) $141.00
  • — Z (S) $750.00

1910.1200 H03 IV

Serious Gravity 03 1 instance 27 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Recent events (2)
  • — F (S)
  • — Z (S)

1915.7 C04

Serious Gravity 10 2 instances 16 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $2,500 · Current $470 Reduced
Recent events (2)
  • — F (S) $470.00
  • — Z (S) $2500.00

1915.7 D02

Serious Gravity 03 4 instances 13 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,250 · Current $235 Reduced
Recent events (2)
  • — F (S) $235.00
  • — Z (S) $1250.00

1915.12 D02 II

Serious Gravity 03 3 instances 14 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,250 · Current $235 Reduced
Recent events (2)
  • — F (S) $235.00
  • — Z (S) $1250.00

1915.12 E01 III

Serious Gravity 03 1 instance 26 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,250 · Current $235 Reduced
Recent events (2)
  • — F (S) $235.00
  • — Z (S) $1250.00

1915.34 C01 IV

Serious Gravity 02 1 instance 6 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,000 · Current $188 Reduced
Recent events (2)
  • — F (S) $188.00
  • — Z (S) $1000.00

1915.34 C03 V

Serious Gravity 10 1 instance 5 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $2,500 · Current $470 Reduced
Recent events (2)
  • — F (S) $470.00
  • — Z (S) $2500.00

1915.35 A04

Serious Gravity 03 1 instance 8 exposed
Issued
Oct 23, 2003
Abate by
Oct 31, 2003
Recent events (2)
  • — F (S)
  • — Z (S)

1915.51 C03

Serious Gravity 10 1 instance 2 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $2,500 · Current $470 Reduced
Recent events (2)
  • — F (S) $470.00
  • — Z (S) $2500.00

1915.55 A01

Serious Gravity 02 1 instance 4 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,000 · Current $188 Reduced
Recent events (2)
  • — F (S) $188.00
  • — Z (S) $1000.00

1915.73 C

Serious Gravity 10 2 instances 12 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $2,500 · Current $470 Reduced
Recent events (2)
  • — F (S) $470.00
  • — Z (S) $2500.00

1915.73 D

Serious Gravity 10 1 instance 4 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $2,500 · Current $470 Reduced
Recent events (2)
  • — F (S) $470.00
  • — Z (S) $2500.00

1915.74 C02

Serious Gravity 02 4 instances 12 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,000 · Current $188 Reduced
Recent events (2)
  • — F (S) $188.00
  • — Z (S) $1000.00

1915.91 A

Serious Gravity 10 1 instance 6 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $2,500 · Current $470 Reduced
Recent events (2)
  • — F (S) $470.00
  • — Z (S) $2500.00

1915.115 A01

Serious Gravity 03 4 instances 1 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,250 · Current $235 Reduced
Recent events (2)
  • — F (S) $235.00
  • — Z (S) $1250.00

1915.158 A02

Serious Gravity 01 2 instances 27 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $750 · Current $141 Reduced
Recent events (2)
  • — F (S) $141.00
  • — Z (S) $750.00

1915.158 B02

Serious Gravity 02 2 instances 10 exposed
Issued
Oct 23, 2003
Abate by
Oct 30, 2003
Penalty
Initial $1,000 · Current $188 Reduced
Recent events (2)
  • — F (S) $188.00
  • — Z (S) $1000.00

1910.134 C01

Other-than-serious Gravity 01 1 instance 22 exposed
Issued
Oct 23, 2003
Abate by
Oct 31, 2003
Recent events (2)
  • — F (O)
  • — Z (O)

1910.134 F01

Other-than-serious Gravity 01 1 instance 22 exposed
Issued
Oct 23, 2003
Abate by
Oct 31, 2003
Recent events (2)
  • — F (O)
  • — Z (O)

1910.134 G01 IA

Other-than-serious Gravity 01 1 instance 1 exposed
Issued
Oct 23, 2003
Abate by
Oct 31, 2003
Recent events (2)
  • — F (O)
  • — Z (O)

1915.55 E01

Other-than-serious Gravity 01 6 instances 9 exposed
Issued
Oct 23, 2003
Abate by
Oct 28, 2003
Recent events (2)
  • — F (O)
  • — Z (O)

1915.98 A

Other-than-serious Gravity 01 2 instances 25 exposed
Issued
Oct 23, 2003
Abate by
Oct 31, 2003
Recent events (2)
  • — F (O)
  • — Z (O)

View Plaquemine Point Shipyard's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 305961070.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.