Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,197,124Inspections Most recent open 2026-08-25 Last loaded 2026-08-28

OSHA Inspection: THE DYNAMIC TRIO, LLC DBA MR. MARBLE

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of THE DYNAMIC TRIO, LLC DBA MR. MARBLE in 188 INDUSTRIAL PARK CIRCLE, LAWRENCEVILLE, GA 30045 (NAICS 327991). OSHA activity number 306218918.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch The Dynamic Trio, LLC DBA MR. Marble for free Get an email when a new federal OSHA severe-injury report for The Dynamic Trio, LLC DBA MR. Marble is published. One employer, no account, unsubscribe in one click.
Site address
188 INDUSTRIAL PARK CIRCLE
City
LAWRENCEVILLE
State
GA
ZIP
30045
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (N)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
327991
SIC code (legacy)
3281
Employees
15
Ownership type
Private (A)

5 citations on file for this inspection.

5(a)(1)

Serious Gravity 03 1 instance 3 exposed
Issued
Apr 5, 2004
Abate by
May 30, 2004
Penalty
Initial $750 · Current $500 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed being struck-by projectiles in the event of a PVC pipe
explosion.
a.On or about 03/09/04, in the shop area, PVC pipe was used to transport
compressed air
at 110 psi into area where needed.
Among other methods, one feasible and acceptable abatement to correct this
hazard is to
replaced the PVC pipes with an impact resistant
Acrylonitrile-Butadiene-Styrene (ABS) pipe.
This is recommended by the plastic pipe institute for this purpose.
Recent events (2)
  • · I (S) $500.00
  • · Z (S) $750.00

1910.37 A03

Serious Gravity 02 1 instance 10 exposed
Issued
Apr 5, 2004
Abate by
Apr 29, 2004
Penalty
Initial $600 · Current $500 Reduced
Recent events (2)
  • · I (S) $500.00
  • · Z (S) $600.00

1910.212 A01

Serious Gravity 03 1 instance 2 exposed
Issued
Apr 5, 2004
Abate by
Apr 8, 2004
Penalty
Initial $750 · Current $500 Reduced
Recent events (2)
  • · I (S) $500.00
  • · Z (S) $750.00

1910.303 F

Serious Gravity 01 1 instance 3 exposed
Issued
Apr 5, 2004
Abate by
May 15, 2004
Penalty
Initial $450 · Current $300 Reduced
Recent events (2)
  • · I (S) $300.00
  • · Z (S) $450.00

1910.303 G02 I

Serious Gravity 03 1 instance 10 exposed
Issued
Apr 5, 2004
Abate by
Apr 29, 2004
Penalty
Initial $750 · Current $500 Reduced
Recent events (2)
  • · I (S) $500.00
  • · Z (S) $750.00

View The Dynamic Trio, LLC DBA MR. Marble's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 306218918.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.