NORTH ADAMS, MA —
OSHA Inspection: MODERN ALUMINUM ANODIZING CORP.
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of MODERN ALUMINUM ANODIZING CORP. in 510 STATE RD., NORTH ADAMS, MA 01247 (NAICS 332813). OSHA activity number 306269069.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MODERN ALUMINUM ANODIZING CORP.
- Site address
- 510 STATE RD.
- City
- NORTH ADAMS
- State
- MA
- ZIP
- 01247
- Mailing
- PO BOX 408, NORTH ADAMS, MA 01247
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332813
- SIC code (legacy)
- 3471
- Employees
- 90
- Ownership type
- A
- Industry flags
- Manufacturing health.
Citations
25 citations on file for this inspection.
5(a)(1)
- Issued
- Jul 1, 2003
- Abate by
- Dec 2, 2003
- Penalty
- Initial $1,225 · Current $613 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm in that employees engaged in "Aluminum Brushing" Operation and the "Flat Stock Grinding" Operation were exposed to fire and explosion hazards posed by the generation of fine aluminum dust particles. Specifically, employees were exposed to the following fire and explosion hazards: a). Fabrication Dept.: The Torit Model 19 Dust Collector for the "Aluminum Brushing" Operation was a dry type collection system, outfitted with a fabric filter. The Collector was not located outside the building. (4/22/03). b). Fabrication Dept.: In the Torit Model 19 Dust Collector for the "Aluminum Brushing" Operation, the blower was installed upstream of the cyclone and fabric filter - on the contaminated air side of the collection system. (4/22/03). c). Fabrication Dept.: The Torit Model 19 Dust Collector for the "Aluminum Brushing" Operation did not have the aluminum dust cleaned out after each days use. (4/22/03). d). Fabrication Dept.: The flexible ducts connecting the Aluminum Brushing machine to the Torit Dust Collector were not fabricated of conductive material. The Aluminum Brushing machine and the Dust Collector were not bonded together to minimize the accumulation of static charges. (4/22/03). e). Fabrication Dept.: The hood/enclosure on the Aluminum Brushing machine was not designed so that the fine particles generated either fall or are projected into the direction of the exhaust air flow. (4/22/03). f). Fabrication Dept.: The Torit Model 219 Dust Collector for the "Flat Stock" Grinder was a dry type collector, outfitted with a fabric filter. The Dust Collector was not located on the outside of the building. (5/7/03). g). Fabrication Dept.: In the Torit Model 219 Dust Collector for the "Flat Stock" Grinding Operation, the blower was installed upstream of the cyclone and fabric filter - on the contaminated air side of the collection system. (5/7/03). h). Fabrication Dept.: The flexible ducts connecting the "Flat Stock" Grinding Operation to the Torit Dust Collector were not fabricated of conductive material. The Flat Stock Grinder and the Dust Collector were not bonded together to minimize the accumulation of static charges. (5/7/03). i). Fabrication Dept.: The Torit Model 219 Dust Collector for the "Aluminum Brushing" Operation did not have the aluminum dust cleaned out after each days use. (4/22/03). Among other methods, one feasible and acceptable abatement method to correct these hazards is to install, use, and maintain aluminum dust collection systems and exhaust hoods in a safe manner. The National Fire Protection Association (NFPA) Standard #65, "Standard for theProcessing and Finishing of Aluminum" may be used for guidance.
Recent events (2)
- — I (S) $612.50
- — Z (S) $1225.00
1910.22 A01
- Issued
- Jul 1, 2003
- Abate by
- Jul 6, 2003
- Penalty
- Initial $1,225 · Current $613 Reduced
Recent events (2)
- — I (S) $612.50
- — Z (S) $1225.00
1910.95 G08 IIB
- Issued
- Jul 1, 2003
- Abate by
- Jul 11, 2003
- Penalty
- Initial $1,225 · Current $613 Reduced
Recent events (2)
- — I (S) $612.50
- — Z (S) $1225.00
1910.95 I05
- Issued
- Jul 1, 2003
- Abate by
- Jul 11, 2003
1910.95 D03
- Issued
- Jul 1, 2003
- Abate by
- Jul 7, 2003
- Penalty
- Initial $525 · Current $263 Reduced
Recent events (2)
- — I (S) $262.50
- — Z (S) $525.00
1910.120 Q08 I
- Issued
- Jul 1, 2003
- Abate by
- Aug 3, 2003
- Penalty
- Initial $525 · Current $263 Reduced
Recent events (2)
- — I (S) $262.50
- — Z (S) $525.00
1910.146 C07 III
- Issued
- Jul 1, 2003
- Abate by
- Aug 3, 2003
- Penalty
- Initial $700 · Current $350 Reduced
Recent events (2)
- — I (S) $350.00
- — Z (S) $700.00
1910.146 K02 IV
- Issued
- Jul 1, 2003
- Abate by
- Oct 2, 2003
- Penalty
- Initial $525 · Current $263 Reduced
Recent events (2)
- — I (S) $262.50
- — Z (S) $525.00
1910.157 D01
- Issued
- Jul 1, 2003
- Abate by
- Jul 7, 2003
- Penalty
- Initial $700 · Current $350 Reduced
Recent events (2)
- — I (S) $350.00
- — Z (S) $700.00
1910.178 P01
- Issued
- Jul 1, 2003
- Abate by
- Jul 11, 2003
- Penalty
- Initial $525 · Current $263 Reduced
Recent events (2)
- — I (S) $262.50
- — Z (S) $525.00
1910.212 A03 II
- Issued
- Jul 1, 2003
- Abate by
- Sep 2, 2003
- Penalty
- Initial $700 · Current $350 Reduced
Recent events (2)
- — A (S) $350.00
- — Z (S) $700.00
1910.303 G02 I
- Issued
- Jul 1, 2003
- Abate by
- Jul 7, 2003
- Penalty
- Initial $1,250 · Current $625 Reduced
Recent events (2)
- — I (S) $625.00
- — Z (S) $1250.00
1910.304 A02
- Issued
- Jul 1, 2003
- Abate by
- Jul 7, 2003
- Penalty
- Initial $700 · Current $350 Reduced
Recent events (2)
- — I (S) $350.00
- — Z (S) $700.00
1910.304 F04
- Issued
- Jul 1, 2003
- Abate by
- Aug 3, 2003
- Penalty
- Initial $875 · Current $438 Reduced
Recent events (2)
- — I (S) $437.50
- — Z (S) $875.00
1910.305 B01
- Issued
- Jul 1, 2003
- Abate by
- Jul 7, 2003
- Penalty
- Initial $700 · Current $350 Reduced
Recent events (2)
- — I (S) $350.00
- — Z (S) $700.00
1910.306 B02
- Issued
- Jul 1, 2003
- Abate by
- Sep 2, 2003
- Penalty
- Initial $700 · Current $350 Reduced
Recent events (2)
- — I (S) $350.00
- — Z (S) $700.00
1910.307 B
- Issued
- Jul 1, 2003
- Abate by
- Dec 2, 2003
- Penalty
- Initial $875 · Current $438 Reduced
Recent events (2)
- — I (S) $437.50
- — Z (S) $875.00
1910.334 A03 II
- Issued
- Jul 1, 2003
- Abate by
- Jul 7, 2003
- Penalty
- Initial $525 · Current $263 Reduced
Recent events (2)
- — I (S) $262.50
- — Z (S) $525.00
1910.23 C01
- Issued
- Jul 1, 2003
- Abate by
- Aug 3, 2003
1910.146 D09
- Issued
- Jul 1, 2003
- Abate by
- Aug 3, 2003
1910.151 C
- Issued
- Jul 1, 2003
- Abate by
- Jul 7, 2003
1910.303 B02
- Issued
- Jul 1, 2003
- Abate by
- Jul 11, 2003
1910.305 A02 IIIG
- Issued
- Jul 1, 2003
- Abate by
- Jul 7, 2003
1910.305 B01
- Issued
- Jul 1, 2003
- Abate by
- Jul 7, 2003
1910.305 B02
- Issued
- Jul 1, 2003
- Abate by
- Jul 7, 2003
More inspections at Modern Aluminum Anodizing Corp.
View Modern Aluminum Anodizing Corp.'s full OSHA safety record →
More inspections in this industry (NAICS 332813)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 306269069.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.