SPRINGFIELD, MA —
OSHA Inspection: CHARLES C. LEWIS CO.
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of CHARLES C. LEWIS CO. in 209 PAGE BLVD., SPRINGFIELD, MA 01101 (NAICS 332999). OSHA activity number 306272204.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- CHARLES C. LEWIS CO.
- Site address
- 209 PAGE BLVD.
- City
- SPRINGFIELD
- State
- MA
- ZIP
- 01101
- Mailing
- P.O. BOX 1810, SPRINGFIELD, MA 01101
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332999
- SIC code (legacy)
- 3499
- Employees
- 40
- Ownership type
- A
Citations
1 citation on file for this inspection.
5(a)(1)
- Issued
- Apr 28, 2004
- Abate by
- May 3, 2004
- Penalty
- Initial $3,000 · Current $2,500 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to being struck by the hoist of an underslung crane when it fell from the bridge of the crane to the floor below. One feasible and acceptable method to correct this hazard is to develop a frequent inspection program meeting the guidelines listed by the manufacturer of the crane. A) LOCATION: OUTSIDE WAREHOUSE OFFICE THE AMERICAN MONORAIL CRANE, USED IN CONJUNCTION WITH A YALE ELECTRIC HOIST, WAS NOT PROPERLY INSPECTED ON A FREQUENT AND REGULAR BASIS TO ENSURE THAT DEFECTS THAT COULD AND DID OCCUR ON THE CRANE BETWEEN THE YEARLY INSPECTION OF THE CRANE, WERE IDENTIFIED AND CORRECTED PRIOR TO LIFTS BEING MADE. A "DUTCHMEN" SAFETY PIN WAS MISSING ON A SWIVEL NUT USED FOR ATTACHMENT TO THE LOAD BAR ON THE TROLLEY. WITHOUT THE SAFETY PIN IN PLACE, THE SWIVEL NUT OVER TIME WAS ALLOWED TO UNSCREW ITSELF FROM THE LOAD AND ULTIMATELY CAUSE THE ENTIRE HOIST TO BREAK LOOSE FROM THE TROLLEY AND FALL TO THE GROUND BELOW. THE MANUFACTURES INSPECTION AND MAINTENANCE SCHEDULE REQUIRES THAT TROLLEYS BE INSPECTED EVERY MONTH AND TROLLEY WHEEL BEARINGS BE GREASED EVERY 3 MONTHS.
Recent events (2)
- — I (S) $2500.00
- — Z (S) $3000.00
More inspections at Charles C. Lewis CO.
View Charles C. Lewis CO.'s full OSHA safety record →
More inspections in this industry (NAICS 332999)
More inspections in MA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 306272204.