PENN YAN, NY ·
OSHA Inspection: THE BIRKETT MILLS
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of THE BIRKETT MILLS in 163 MAIN STREET, PENN YAN, NY 14527 (NAICS 311211). OSHA activity number 306312695.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- THE BIRKETT MILLS
- Site address
- 163 MAIN STREET
- City
- PENN YAN
- State
- NY
- ZIP
- 14527
- Mailing
- PO BOX 440, PENN YAN, NY 14527
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (N)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 311211
- SIC code (legacy)
- 2041
- Employees
- 15
- Ownership type
- Private (A)
Citations
3 citations on file for this inspection.
5(a)(1)
- Issued
- Nov 13, 2003
- Abate by
- Dec 16, 2003
- Penalty
- Initial $375 · Current $375
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to THE HAZARD OF BEING STRUCK-BY THE LOAD/EQUIPMENT: a)Throughout the facility, on or about 10/30/03: The support structures for the following hoists had unknown load capacity ratings: 1)Main Floor Grinding, 1-Ton CM Hoist. 2)Groat Room, 1-Ton CM Hoist. 3)Groat Room, 1-Ton CM Hoist. Among other methods, one feasible method of abatement is to inspect the support structures for the hoists as per ASME B30.16-1993, to ensure the structure is designed to withstand the loads and forces imposed by the hoist for the rated load. b)Throughout the facility, on or about 10/30/03: The following below-the-hook lifting devices had unknown load capacity ratings. 1)Main Floor Grinding, 1-Ton CM Hoist, below-the-hook lifting device. 2)Groat Room, 1-Ton CM Hoist, below-the-hook lifting device. 3)Groat Room, 1-Ton CM Hoist, below-the-hook lifting device. Among other methods, one feasible method of abatement is to conduct frequent and periodic inspections of the lifting device and mark the lifting device with the rated load capacity as per ASME B30.20-1993. Abatement certification must be submitted for these items.
1910.219 D01
- Issued
- Nov 13, 2003
- Abate by
- Dec 1, 2003
- Penalty
- Initial $300 · Current $300
1910.219 E03 I
- Issued
- Nov 13, 2003
- Abate by
- Dec 1, 2003
More inspections at The Birkett Mills
View The Birkett Mills's full OSHA safety record →
More inspections in this industry (NAICS 311211)
More inspections in NY
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 306312695.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.