FALLON, NV —
OSHA Inspection: BRADY POWER PLANT
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of BRADY POWER PLANT in 10750 I-80 EAST EXIT 65, FALLON, NV 89406 (NAICS 221122). OSHA activity number 306329046.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- BRADY POWER PLANT
- Site address
- 10750 I-80 EAST EXIT 65
- City
- FALLON
- State
- NV
- ZIP
- 89406
- Mailing
- P.O. BOX 649, FERNLEY, NV 89408
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 221122
- SIC code (legacy)
- 4911
- Employees
- 13
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
16 citations on file for this inspection.
1910.132 D01
- Issued
- Apr 2, 2003
- Abate by
- Apr 25, 2003
- Penalty
- Initial $600 · Current $600
Recent events (2)
- — I (S) $600.00
- — Z (S) $600.00
1910.132 D02
- Issued
- Apr 2, 2003
- Abate by
- Apr 25, 2003
Recent events (2)
- — I (S)
- — Z (S)
1910.146 C01
- Issued
- Apr 2, 2003
- Abate by
- Apr 25, 2003
- Penalty
- Initial $1,500 · Current $1,500
Recent events (2)
- — I (S) $1500.00
- — Z (S) $1500.00
1910.146 D09
- Issued
- Apr 2, 2003
- Abate by
- Apr 25, 2003
Recent events (2)
- — I (S)
- — Z (S)
1910.146 D14
- Issued
- Apr 2, 2003
- Abate by
- Apr 25, 2003
Recent events (2)
- — I (S)
- — Z (S)
1910.147 C01
- Issued
- Apr 2, 2003
- Abate by
- Apr 25, 2003
- Penalty
- Initial $750 · Current $750
Recent events (2)
- — I (S) $750.00
- — Z (S) $750.00
1910.147 C06 I
- Issued
- Apr 2, 2003
- Abate by
- Apr 25, 2003
Recent events (2)
- — I (S)
- — Z (S)
1910.178 L01 I
- Issued
- Apr 2, 2003
- Abate by
- Apr 25, 2003
- Penalty
- Initial $750 · Current $750
Recent events (2)
- — I (S) $750.00
- — Z (S) $750.00
1910.178 L06
- Issued
- Apr 2, 2003
- Abate by
- Apr 25, 2003
Recent events (2)
- — I (S)
- — Z (S)
1910.179 J02
- Issued
- Apr 2, 2003
- Abate by
- Apr 25, 2003
- Penalty
- Initial $750 · Current $750
Recent events (2)
- — I (S) $750.00
- — Z (S) $750.00
1910.179 J03
- Issued
- Apr 2, 2003
- Abate by
- Apr 25, 2003
Recent events (2)
- — I (S)
- — Z (S)
618038301
- Issued
- Mar 26, 2003
- Abate by
- Apr 25, 2003
1910.22 A01
- Issued
- Mar 13, 2003
- Abate by
- Apr 14, 2003
1910.215 A04
- Issued
- Mar 13, 2003
- Abate by
- Mar 17, 2003
1910.305 B02
- Issued
- Mar 13, 2003
- Abate by
- Mar 21, 2003
1910.1200 H01
- Issued
- Mar 13, 2003
- Abate by
- Apr 14, 2003
More inspections at Brady Power Plant
View Brady Power Plant's full OSHA safety record →
More inspections in this industry (NAICS 221122)
More inspections in NV