JAMESTOWN, PA ·
OSHA Inspection: D & L ENERGY, INC
Accident-driven inspection · Safety discipline
At a glance
On , OSHA opened an accident-driven safety inspection of D & L ENERGY, INC in RT. 58 N, JEFFERY MEALY, WELL#2, JAMESTOWN, PA 16134 (NAICS 213111). OSHA activity number 306454117.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- D & L ENERGY, INC
- Site address
- RT. 58 N, JEFFERY MEALY, WELL#2
- City
- JAMESTOWN
- State
- PA
- ZIP
- 16134
- Mailing
- 2761 SALT SPRINGS RD., YOUNGSTOWN, OH 44509
What kind of inspection was it?
- Inspection type
- Accident-driven (A)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (N)
When did the case open and close?
- Opened
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 213111
- SIC code (legacy)
- 1381
- Employees
- 1
- Ownership type
- Private (A)
Citations
1 citation on file for this inspection.
5(a)(1)
- Issued
- Nov 15, 2004
- Abate by
- Dec 10, 2004
- Penalty
- Initial $1,500 · Current $1,500
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to being struck by a high pressure flowline due to failure to adequately secure the flowline: a) Jeffery Mealy Well#2, Green Township, Mercer County,Jamestown, Pa. The flowback line had not been secured at the wellhead, at the 90 degree turn where the 2 inch line was connected, and at the discharge into the flowback tank. Among other feasible and acceptable methods to correct this hazard are to: 1. Secure the wellhead piping to prevent rotation in the event of pipe failure. ( Ref: American Petroleum Institute Recommended Practice 54, Para 12.4.3) 2. Secure the discharge piping at the 90 degree turn where the 2 inch line was connected. (Ref:American Petroleum Institute Recommended Practice 54, Para 9.13.3, Para 12.4.3) 3. Secure or anchor the flow line at the discharge end of the flow line/flowback tank and at intermediate intervals along the line of each 15 to 20 feet. ( Ref: American Petroleum Institute Recommended Practice 54, Para 12.4.3)
More inspections in this industry (NAICS 213111)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 306454117.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.