EMPORIUM, PA —
OSHA Inspection: FANSTEEL AMERICAN SINTERED TECHNOLOGIES
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of FANSTEEL AMERICAN SINTERED TECHNOLOGIES in 513 EAST 2ND STREET, EMPORIUM, PA 15834 (NAICS 332117). OSHA activity number 306457037.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- FANSTEEL AMERICAN SINTERED TECHNOLOGIES
- Site address
- 513 EAST 2ND STREET
- City
- EMPORIUM
- State
- PA
- ZIP
- 15834
- Mailing
- P.O. BOX 149, EMPORIUM, PA 15834
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332117
- SIC code (legacy)
- 3499
- Employees
- 68
- Ownership type
- A
Citations
16 citations on file for this inspection.
5(a)(1)
- Issued
- May 11, 2005
- Abate by
- Sep 1, 2005
- Penalty
- Initial $3,150 · Current $1,750 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to crushing and amputation injuries during the operation of powdered metal (P/M) presses provided with inadequate barrier guards, improperly adjusted interlocks, and/or readily removable fasteners: a) Production Area - Gasbarre P/M molding press #S1, full revolution, serial #88297, 40 ton, interlocked barrier guard was not installed. The interlock safety device was bypassed in the setup mode. Access at the front of the press was measured at twelve inches (12") wide x twelve inches (12") height and within eight inches (8") of the point of operation. b) Production Area - Gasbarre P/M molding press #S2, full revolution, serial #91450, 60 ton, interlocked barrier guard was not installed. The interlock safety device was bypassed in the setup mode. Access at the front of the press was measured at twelve inches (12") wide x twelve inches (12") height and within eight inches (8") of the point of operation. c) Production Area - Gasbarre P/M molding press #S3, full revolution, serial #96754, 45 ton, interlocked barrier guard was not installed. The interlock safety device was bypassed in the setup mode. Access at the front of the press was measured at twelve inches (12") wide x twelve inches (12") height and within eight inches (8") of the point of operation. d) Production Area - Gasbarre P/M molding press #M1, part revolution, serial #88296, 45 ton, had no barrier guard to protect an front opening on the adjustable barrier guard two inches (2") wide x six inches (6") long and ten inches (10") from the point of operation. e) Production Area - Gasbarre P/M molding press #M11, part revolution, serial #93519, 30 ton, had an front opening on the adjustable barrier guard two inches (2") wide x five inches (5") long and ten inches (10") from the point of operation. f) Production Area - Gasbarre P/M molding press #M16, part revolution, serial #94589, 200 ton, had an front opening on the adjustable barrier guard three inches (3") wide x eight inches (8") long and thirteen inches (13") from the point of operation. g) Production Area - Gasbarre P/M molding press #M18, part revolution, serial #95659, 60 ton, had an front opening on the adjustable barrier guard two inches (2") wide x six inches (6") long and eleven inches (11") from the point of operation. h) Production Area - Gasbarre P/M molding press #M21, part revolution, serial #9889, 200 ton, had a front opening on the adjustable barrier guard fifteen inches (15") wide x thirty one inches (31") long and thirteen inches (13") from the point of operation. FEASIBLE ABATEMENT METHODS: 1. Utilize a fixed barrier guard to prevent entry of hands into the point of operation by reaching through, over, under, or around the guard and remove readily removable fasteners in accordance with ANSI B11.16-2003, section 8.4, Point of Operation Guards. 2. Secure and mount the barrier guard to minimize the possibility of misuse or unauthorized removal in accordance with ANSI B11.16-2003, section 8.3, Guards.
Recent events (2)
- — I (S) $1750.00
- — Z (S) $3150.00
1910.138 A
- Issued
- May 11, 2005
- Abate by
- Jun 1, 2005
- Penalty
- Initial $1,800 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1800.00
1910.335 A02 I
- Issued
- May 11, 2005
- Abate by
- Jun 1, 2005
1910.147 C04 II
- Issued
- May 11, 2005
- Abate by
- Jun 15, 2005
- Penalty
- Initial $3,150 · Current $1,750 Reduced
Recent events (2)
- — I (S) $1750.00
- — Z (S) $3150.00
1910.151 C
- Issued
- May 11, 2005
- Abate by
- Jun 15, 2005
- Penalty
- Initial $1,800 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1800.00
1910.184 E01
- Issued
- May 11, 2005
- Abate by
- May 16, 2005
- Penalty
- Initial $1,800 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1800.00
1910.184 D
- Issued
- May 11, 2005
- Abate by
- May 16, 2005
1910.184 E02 II
- Issued
- May 11, 2005
- Abate by
- May 16, 2005
1910.184 I09 III
- Issued
- May 11, 2005
- Abate by
- May 16, 2005
1910.212 A01
- Issued
- May 11, 2005
- Abate by
- Sep 1, 2005
- Penalty
- Initial $3,150 · Current $1,750 Reduced
Recent events (2)
- — I (S) $1750.00
- — Z (S) $3150.00
1910.219 D01
- Issued
- May 11, 2005
- Abate by
- May 16, 2005
1910.219 E01 I
- Issued
- May 11, 2005
- Abate by
- May 16, 2005
1910.253 B04 III
- Issued
- May 11, 2005
- Abate by
- May 16, 2005
- Penalty
- Initial $1,800 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1800.00
1910.252 B02 IIG
- Issued
- May 11, 2005
- Abate by
- Jun 1, 2005
1910.253 B02 II
- Issued
- May 11, 2005
- Abate by
- May 16, 2005
1910.303 B02
- Issued
- May 11, 2005
- Abate by
- Jun 1, 2005
- Penalty
- Initial $1,800 · Current $750 Reduced
Recent events (2)
- — I (S) $750.00
- — Z (S) $1800.00
More inspections in this industry (NAICS 332117)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 306457037.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.