WEST MIDDLESEX, PA —
OSHA Inspection: REGENEX CORPORATION
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of REGENEX CORPORATION in ONE NEW STREET, WEST MIDDLESEX, PA 16159 (NAICS 326199). OSHA activity number 306459983.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- REGENEX CORPORATION
- Site address
- ONE NEW STREET
- City
- WEST MIDDLESEX
- State
- PA
- ZIP
- 16159
- Mailing
- P.O. BOX 608, WEST MIDDLESEX, PA 16159
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326199
- SIC code (legacy)
- 3089
- Employees
- 70
- Ownership type
- A
Citations
16 citations on file for this inspection.
5(a)(1)
- Issued
- May 4, 2006
- Abate by
- Nov 1, 2006
- Penalty
- Initial $875 · Current $438 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employmnent and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that: A.) REGENEX Corporation/Resale Process Systems & In House Process Systems: Employees were potentially exposed to dust explosion hazards and related burn injuries because an evaluation was not conducted to determine whether hazards necessitated the installation of approved devices to prevent, mitigate, and/or control hazards associated with the propagation of dust explosions, deflagrations, and flame fronts through plant equipment, machinery, air systems, and related duct work: (1) In Both the Resale and In House Departments, a Process Hazard Analysis (PHA) and Process Risk Assessment were not conducted to determine whether process hazards necessitated the installation of approved devices such as explosion protection systems, interlocked rotary valves,deflagration vents, automatic fast acting valve systems, flame front diverters, and chemical isolation systems to prevent, mitigate, and/or control dust explosion hazards and the hazards associated with propagation of deflagrations, explosions, and flame fronts through equipment, machinery, air systems, and conveying systems. The equipment, machinery, and systems included but were not limited to the grinders, Cumberland grinder, RETEC, cyclones, dust collection system & bag units, duct work associated with the dust collection systems and air systems, air movement devices (e.g. fans/blowers), and the sorter. NFPA 654 - Standard for the Prevention of Fire and Dust Explosions from the Manufacturing, Processing, and Handling of Combustible Particulate Solids- Sections 4.2.1 through 4.2.3 and 7.1 through 7.1.1 states the following: 4.2.1 - The design of explosion safety provisions shall be based on a process hazard analysis of the facility, the process, and associated fire or explosion hazards. 4.2.2 - The results of the Process Hazard Analysis will be documented and maintained for the life of the process. 4.2.3 - The process hazard analysis shall be reviewed and updated at least every 5 years. 7.1 - Methods of explosion protection for specific equipment. 7.1.1 - A documented risk evaluation acceptable to the authority having jurisdiction shall be permitted to be conducted to determine the level of protection to be provided. B.) REGENEX Corporation/Resale Process Systems & In House Process Systems: Employees were potentially exposed to dust explosion hazards and related burn injuries because approved devices were not installed to prevent, mitigate, and/or control the hazards associated with the propagation of dust explosions, deflagrations, and flame fronts through plant equipment, machinery, air systems, and related duct work. In both the Resale and In-house Departments: (1) Air material separators (e.g. dust collection systems & bag units/cyclones) were located inside the building and were not protected by explosion protection systems and isolation devices. NFPA 654 - Standard for the Prevention of Fire and Dust Explosions from the Manufacturing, Processing, and Handling of Combustible Particulate Solids- Section 7.13.1.1.1 states where an explosion hazard exists air material separators shall be located outside of buildings (Exception: Section 7.13.1.1.2(1) Unless the air material separator is protected by an explosion protection system) Section 7.13.1.5 & 7.1.4 - Where an explosion hazard exists, isolation devices shall be provided for air material separators. (2) Deflagration isolation devices were not installed between interconnected pieces of equipment NFPA 654 - Standard for the Prevention of Fire and Dust Explosions from the Manufacturing, Processing, and Handling of Combustible Particulate Solids: Section 7.1.4.1 states where an explosion hazard exists, isolation devices shall be provided to prevent deflagration propagation between pieces of equipment connected by duct work. (3) Grinders in the In-house Department and the Cumberland Grinder and RETEC in the Resale Department were not equipped with an explosion protection system. NFPA 654 - Standard for the Prevention of Fire and Dust Explosions from the Manufacturing, Processing, and Handling of Combustible Particulate Solids: Section A7.15 - Size reduction machinery includes equipment such as mills, grinders, and pulverizers. Section 7.15.2 & 7.1.2 states where an explosion hazard exists, an explosion protection system shall be provided on size reduction machinery ABATEMENT NOTE: Among other methods, feasible and acceptable means to correct the conditions noted in Instances A and B above include: (1) Instance A = Complying with the applicable requirements noted in NFPA 654 - Standard for the Prevent of Fire and Dust Explosions from the Manufacturing, Processing, and Handling of Combustible Particulate Solids- by conducting a PHA &Process Risk Assessment. The PHA/Process Risk Assessment must be documented and kept on file. (2) Instance B/Air-Material Separators = Relocate the air material separators (e.g. cyclones, dust collection systems & bag units to the exterior of the building. And/or, install approved deflagration devices, isolation devices, and explosion protection systems in in accordance with the PHA/Risk Assessment and the requirements noted in NFPA 654. (3) Instance B/Deflagration Isolation Devices, Grinders, and RETEC = Install approved deflagration devices, isolation devices, and explosion protection systems in accordance with the PHA/Risk Assessment and the requirements noted in NFPA 654. C.) REGENEX Corporation/Resale Department/West Wall By Exit Door/Gas Fired Heater Suspended Above the Floor: Employees were potentially exposed to dust explosion hazards and related burn injuries from potential ignition sources which included but were not limited to gas fired heaters that were located in a process area/environment that generated and transported explosive plastic dust. In the Resale Department, the gas fired heater was located in the same area as the Resale process line and its related equipment which generated/transported explosive plastic dust. NFPA 654 - Standard for the Prevent of Fire and Dust Explosions from the Manufacturing, Processing, and Handling of Combustible Particulate Solids- Sections 9.6.1 through 9.6.3 states the following: 9.6.1 In areas processing combustible dusts, process and comfort heat shall be provided by indirect means. 9.6.2 Fired equipment shall be located outdoors on in a separate dust-free room or building 9.6.3 Air for combustion shall be taken from a clean outside source 9.6.4 Comfort air systems for processing areas contain combustible dusts shall not be recirculated. ABATEMENT NOTE: Among other methods, feasible and acceptable means to correct the conditions noted with the gas fired heater include: (1) Complying with the applicable requirements noted in NFPA 654 - Standard for the Prevent of Fire and Dust Explosions from the Manufacturing, Processing, and Handling of Combustible Particulate Solids- Sections 9.6.1 through 9.6.6 (2) Relocate the gas fired heater to a separate dust free room, area, or building and transfer the heat via indirect means through the duct work.
Recent events (2)
- — I (S) $438.00
- — Z (S) $875.00
1910.22 A01
- Issued
- May 4, 2006
- Abate by
- Nov 1, 2006
- Penalty
- Initial $875 · Current $437 Reduced
Recent events (2)
- — I (S) $437.00
- — Z (S) $875.00
1910.1200 H02 II
- Issued
- May 4, 2006
- Abate by
- Nov 1, 2006
Recent events (2)
- — I (S)
- — Z (S)
1910.23 C01
- Issued
- May 4, 2006
- Abate by
- Jul 13, 2006
- Penalty
- Initial $700 · Current $300 Reduced
Recent events (2)
- — I (S) $300.00
- — Z (S) $700.00
1910.23 A08
- Issued
- May 4, 2006
- Abate by
- Jul 13, 2006
1910.176 B
- Issued
- May 4, 2006
- Abate by
- Jul 13, 2006
- Penalty
- Initial $700 · Current $300 Reduced
Recent events (2)
- — I (S) $300.00
- — Z (S) $700.00
1910.176 A
- Issued
- May 4, 2006
- Abate by
- Jul 13, 2006
1910.212 A01
- Issued
- May 4, 2006
- Abate by
- Jul 13, 2006
- Penalty
- Initial $700 · Current $300 Reduced
Recent events (2)
- — I (S) $300.00
- — Z (S) $700.00
1910.219 C02 I
- Issued
- May 4, 2006
- Abate by
- Jul 13, 2006
1910.215 A04
- Issued
- May 4, 2006
- Abate by
- May 9, 2006
- Penalty
- Initial $446 · Current $223 Reduced
Recent events (2)
- — I (S) $223.00
- — Z (S) $446.00
1910.215 B09
- Issued
- May 4, 2006
- Abate by
- May 9, 2006
1910.253 B04 III
- Issued
- May 4, 2006
- Abate by
- May 9, 2006
- Penalty
- Initial $446 · Current $223 Reduced
Recent events (2)
- — I (S) $223.00
- — Z (S) $446.00
1910.303 B01 II
- Issued
- May 4, 2006
- Abate by
- Jul 13, 2006
- Penalty
- Initial $525 · Current $413 Reduced
Recent events (2)
- — I (S) $413.00
- — Z (S) $525.00
1910.305 B01
- Issued
- May 4, 2006
- Abate by
- Jul 13, 2006
1910.303 G02 I
- Issued
- May 4, 2006
- Abate by
- Jul 13, 2006
- Penalty
- Initial $875 · Current $437 Reduced
Recent events (2)
- — I (S) $437.00
- — Z (S) $875.00
1910.333 C02
- Issued
- May 4, 2006
- Abate by
- Jul 6, 2006
More inspections at Regenex Corporation
View Regenex Corporation's full OSHA safety record →
More inspections in this industry (NAICS 326199)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 306459983.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.