OSHA Inspection: SITE BLAUVELT ENGINEERS

Unprogrammed Related inspection · Safety discipline

On , OSHA opened an unprogrammed Related safety inspection of SITE BLAUVELT ENGINEERS in BRIGHTON & PACIFIC AVES., ATLANTIC CITY, NJ 08401 (NAICS 541330). OSHA activity number 306733965.

Watch Site Blauvelt Engineers — free Get an email when a new federal OSHA severe-injury report for Site Blauvelt Engineers is published. One employer, no account, unsubscribe in one click.
Site address
BRIGHTON & PACIFIC AVES.
City
ATLANTIC CITY
State
NJ
ZIP
08401
Mailing
16000 COMMERCE PARKWAY, STE B, MOUNT LAUREL, NJ 08054
Inspection type
Unprogrammed Related (G)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
541330
SIC code (legacy)
8711
Employees
6
Ownership type
A

1 citation on file for this inspection.

5(a)(1)

Serious Gravity 10 2 instances 3 exposed
Issued
Abate by
Penalty
Initial $7000.00 · Current $7000.00
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to a collapse:
Tropicana Garage: Site Blauvelt inspectors did not perform all work in a
manner
consistent with standards of their profession;
a)Employer did not provide employees with the education and training to
properly
perform the inspections appropriate for the work being performed, on or
about
10/30/03.
b)Approval of rebar placement was given even though the welded wire fabric
"mesh" was not embedded into the columns and shear wall along column line
1,
to develop its full strength and to reinforce the exterior beam to column
and shear
wall connections, welded wire fabric "mesh" was not properly placed into
the
shear wall at a uniform depth to develop its full flexural strength,and
one or more
top longitudinal reinforcing bars of the exterior beam along column line 1
were
not placed through the column to reinforce the beam connection, on or about
10/30/03.
ABATEMENT NOTE: Feasible and acceptable methods for abating this hazard
are:
1)Refer to ACI 318-95  Building Code Requirements for Concrete and
Commentary
requirements.
2)Refer to ACI Detailing Manual - Recommended Practices for Location of
Bars
Designated Only By Size/Spacing which describes the standard spacing for
reinforcing bars when the spacing is not provided on the detailed drawing.
3)Follow the BOCA National Building Code/1996
4)Follow shop drawings and/or structural drawings and refer any
discrepancies to
the Construction Manager.
5)Follow CRSI publication #49 and Manual for Placing Reinforcing Bars.
6)Follow ASTM E329
NOTE:  IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS
REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM, FAILURE
TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1,000.00 AS PER 29
CFR 1903.19.
Recent events (2)
  • — J (S) $7000.00
  • — Z (S) $7000.00

View SITE BLAUVELT ENGINEERS's full OSHA safety record →