OSHA Inspection: STATE ROAD CEMENT BLOCK COMPANY

Accident-driven inspection · Safety discipline

On , OSHA opened an accident-driven safety inspection of STATE ROAD CEMENT BLOCK COMPANY in 656 STATE ROAD, NORTH DARTMOUTH, MA 02747 (NAICS 423320). OSHA activity number 306808122.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch State Road Cement Block Company for free Get an email when a new federal OSHA severe-injury report for State Road Cement Block Company is published. One employer, no account, unsubscribe in one click.
Site address
656 STATE ROAD
City
NORTH DARTMOUTH
State
MA
ZIP
02747
Inspection type
Accident-driven (A)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Union (Y)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
423320
SIC code (legacy)
5032
Employees
10
Ownership type
Private (A)

24 citations on file for this inspection.

1910.23 C01

Deleted Serious Gravity 10 1 instance 4 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $1,500 · Current $1,500
Recent events (2)
  • · F (S) $1500.00
  • · Z (S) $1500.00

1910.23 C01

Deleted Serious Gravity 10 1 instance 4 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $1,500 · Current $1,500
Recent events (2)
  • · F (S) $1500.00
  • · Z (S) $1500.00

1910.23 C01

Deleted Serious Gravity 02 1 instance 4 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $600 · Current $600
Recent events (2)
  • · F (S) $600.00
  • · Z (S) $600.00

1910.23 D01 III

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $1,500 · Current $1,500
Recent events (2)
  • · F (S) $1500.00
  • · Z (S) $1500.00

1910.157 E03

Other-than-serious Gravity 03 1 instance 4 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $750
Recent events (2)
  • · F (O)
  • · Z (S) $750.00

1910.169 B03 I

Serious Gravity 10 1 instance 4 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $2,100 · Current $1,050 Reduced
Recent events (2)
  • · F (S) $1050.00
  • · Z (S) $2100.00

5(a)(1)

Serious Gravity 10 1 instance 2 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $2,100 · Current $2,100
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  On
10/16/03, a multi-piece rim wheel separated during inflation causing a
fatal
injury.
Abatement Method:  Among other methods, one feasible means of abatement is
to
provide employees with an air line assembly consisting of a clip-on chuck,
an
in-line valve with a pressure gauge or a presettable regulator and a
sufficient length of hose between the clip-on chuck and the in-line valve
to
allow the employees to stand outside the trajectory, as well as provide
employees with training in the hazards involved in inflating multi-piece
rim
wheel tires and the way to use the above-mentioned equipment while standing
outside the trajectory.
Recent events (2)
  • · F (S) $2100.00
  • · Z (S) $2100.00

1910.177 C02 VII

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $2,100 · Current $2,100
Recent events (2)
  • · F (S) $2100.00
  • · Z (S) $2100.00

1910.177 C03

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $2,100 · Current $2,100
Recent events (2)
  • · F (S) $2100.00
  • · Z (S) $2100.00

1910.177 D01

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $2,100 · Current $2,100
Recent events (2)
  • · F (S) $2100.00
  • · Z (S) $2100.00

1910.177 D04

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $2,100 · Current $2,100
Recent events (2)
  • · F (S) $2100.00
  • · Z (S) $2100.00

1910.177 D05

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $2,100 · Current $2,100
Recent events (2)
  • · F (S) $2100.00
  • · Z (S) $2100.00

1910.177 F05

Deleted Serious Gravity 10 1 instance 2 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $2,100 · Current $2,100
Recent events (2)
  • · F (S) $2100.00
  • · Z (S) $2100.00

1910.215 B09

Serious Gravity 03 1 instance 4 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • · F (S) $375.00
  • · Z (S) $750.00

1910.219 F03

Serious Gravity 10 1 instance 5 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $1,500 · Current $750 Reduced
Recent events (2)
  • · F (S) $750.00
  • · Z (S) $1500.00

1910.303 B02

Other-than-serious Gravity 10 1 instance 1 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $1,500 · Current $750 Reduced
Recent events (2)
  • · F (O) $750.00
  • · Z (S) $1500.00

1910.303 F

Serious Gravity 03 1 instance 5 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • · F (S) $375.00
  • · Z (S) $750.00

1910.305 B01

Serious Gravity 03 1 instance 4 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • · F (S) $375.00
  • · Z (S) $750.00

1910.305 B02

Serious Gravity 10 1 instance 4 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $1,500 · Current $750 Reduced
Recent events (2)
  • · F (S) $750.00
  • · Z (S) $1500.00

1910.305 G02 III

Serious Gravity 03 1 instance 2 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • · F (S) $375.00
  • · Z (S) $750.00

1910.334 A02 II

Serious Gravity 02 1 instance 3 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $600 · Current $300 Reduced
Recent events (2)
  • · F (S) $300.00
  • · Z (S) $600.00

1910.23 C01

Serious Gravity 10 1 instance 4 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $1,500 · Current $1,800
Recent events (2)
  • · F (S) $1800.00
  • · Z (S) $1500.00

1910.23 C01

Serious Gravity 10 1 instance 4 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $1,500
Recent events (2)
  • · F (S)
  • · Z (S) $1500.00

1910.23 C01

Serious Gravity 02 1 instance 4 exposed
Issued
Nov 25, 2003
Abate by
Dec 22, 2003
Penalty
Initial $600
Recent events (2)
  • · F (S)
  • · Z (S) $600.00

View State Road Cement Block Company's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 306808122.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.