GREENVILLE, SC ·
OSHA Inspection: SOUTH AM, INC.
Unprogrammed Other inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Other safety inspection of SOUTH AM, INC. in 102 OAKHURST AVE., GREENVILLE, SC 29615 (NAICS 238130). OSHA activity number 306836024.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SOUTH AM, INC.
- Site address
- 102 OAKHURST AVE.
- City
- GREENVILLE
- State
- SC
- ZIP
- 29615
- Mailing
- 305 SEABURY DRIVE, GREENVILLE, SC 29615
What kind of inspection was it?
- Inspection type
- Unprogrammed Other (I)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Data loaded
Establishment context
- NAICS code
- 238130
- SIC code (legacy)
- 1751
- Employees
- 10
- Ownership type
- A
- Industry flags
- Construction safety.
Citations
1 citation on file for this inspection.
10012 A
- Issued
- Jan 7, 2004
- Abate by
- Jan 13, 2004
- Penalty
- Initial $2,000 · Current $2,000
General-duty citation text
SCRR 71-112A: Failed to furnish a place of employment which is free of recognized hazards which may cause death or serious physical harm to his employees and comply with this regulation and other occupational safety and health rules and regulations promulgated under Chapter 15 of Title 41, Code of Laws, State of South Carolina, 1976, as amended, as follows: A. Employer knew or should have known that 2 employees working on Building Number 102 next to bare 7200 volt energized power line were exposed to the hazard of electrocution while handling and installing trusses and sheeting at the Oakhurst site on or about 2 weeks prior to November 4, 2003. A feasible and useful method to correct this hazard, among other methods, was to deenergized power line or shield power line to prevent contact with energized power line.
More inspections in this industry (NAICS 238130)
More inspections in SC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 306836024.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.