SEAGRAVES, TX —
OSHA Inspection: FIVE POINTS GIN INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of FIVE POINTS GIN INC. in 1204 US HWY 385 NORTH, SEAGRAVES, TX 79359 (NAICS 115111). OSHA activity number 307010173.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- FIVE POINTS GIN INC.
- Site address
- 1204 US HWY 385 NORTH
- City
- SEAGRAVES
- State
- TX
- ZIP
- 79359
- Mailing
- PO BOX 576, SEAGRAVES, TX 79359
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 115111
- SIC code (legacy)
- 0724
- Employees
- 32
- Ownership type
- A
Citations
4 citations on file for this inspection.
5(a)(1)
- Issued
- Jan 11, 2006
- Abate by
- Feb 7, 2006
- Penalty
- Initial $525 · Current $315 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the condition(s) listed below: Five Points Gin, Inc., 1204 US 385 North, Seagraves, TX. For the period of time up to and including 12/09/05, employees were not protected from electrical hazards due to the following condition: Conduit was not complete / continuous, thereby allowing the conductors to be unprotected. Under the National Electric Code (NEC 2005), Article 547.5(D) states "All electrical wiring and equipment subject to physical damage shall be protected." Under the National Electric Code (NEC 2005), Article 547.5(C)(1) states "Equipment enclosures, boxes, conduit bodies, and fittings installed in areas of buildings where excessive dust may be present shall be designed to minimize the entrance of dust and shall have not openings (such as holes for attachment screws) through which dust could enter the enclosure. One feasible and acceptable abatement method would be to ensure all electrical equipment is installed / maintained in accordance with Article 547 of the National Electric Code. "Pursuant to 29 CFR 1903.19(d), the employer must provide documentation that this violation has been abated within 10 calendar days after the abatement date."ent
Recent events (2)
- — I (S) $315.00
- — Z (S) $525.00
5(a)(1)
- Issued
- Jan 11, 2006
- Abate by
- Apr 12, 2006
- Penalty
- Initial $525 · Current $315 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the condition(s) listed below: Five Points Gin, Inc., 1204 US 385 North, Seagraves, TX. For the period of time up to and including 12/09/05, employees were not protected from fall hazards due to the following conditions: a) A 54-inch area along the catwalk at the upper lint cleaner did not have a rail in place. b) A mid-rail was missing along the catwalk at the motes cleaner area. Under the American National Standard A12.1 1973, paragraph 5.1 states "Every open-sided floor or platform 4 feet or more above adjacent floor or ground level shall be guarded by a railing (or the equivalent as specified in 7.3) on all open sides, except where excluded as specified in 1.2 and where there is entrance to a ramp, stairway or fixed ladder. Under the American National Standard A12.1 1973, paragraph 7.1 states "A guard railing shall consist of top rail, intermediate rail or equivalent protection, and posts, and shall have a vertical height within the range of 36 inches to 42 inches nominal from upper surface of top rail to floor, platform, runway, or ramp level. One feasible and acceptable abatement method would be to ensure all walking / working surfaces are installed / maintained in accordance with A12.1 of the American National Standards. "Pursuant to 29 CFR 1903.19(d), the employer must provide documentation that this violation has been abated within 10 calendar days after the abatement date."ent
Recent events (2)
- — I (S) $315.00
- — Z (S) $525.00
1928.57 D01 IV
- Issued
- Jan 11, 2006
- Abate by
- Apr 12, 2006
- Penalty
- Initial $525 · Current $315 Reduced
Recent events (2)
- — I (S) $315.00
- — Z (S) $525.00
1928.57 D01 VII
- Issued
- Jan 11, 2006
- Abate by
- Apr 12, 2006
More inspections in this industry (NAICS 115111)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 307010173.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.