RIB LAKE, WI ·
OSHA Inspection: GREAT NORTHERN CABINETRY, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of GREAT NORTHERN CABINETRY, INC. in 749 KENNEDY ST., RIB LAKE, WI 54470 (NAICS 337110). OSHA activity number 307046243.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- GREAT NORTHERN CABINETRY, INC.
- Site address
- 749 KENNEDY ST.
- City
- RIB LAKE
- State
- WI
- ZIP
- 54470
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 337110
- SIC code (legacy)
- 2434
- Employees
- 75
- Ownership type
- A
Citations
8 citations on file for this inspection.
5(a)(1)
- Issued
- Feb 17, 2009
- Abate by
- Nov 15, 2010
- Penalty
- Initial $875 · Current $525 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to serious burns from potential dust deflagration, explosion, or other fire hazards as the result of the improper design and maintenance of the dust collection systems: (a)Great Northern Cabinetry, Inc. in Rib Lake, WI: The following deficiencies were found with the large Torit and smaller Carter Day bag house dust collectors and associated systems used for wood dusts: (1)A means of tramp metal protection was not provided to keep any unwanted metal fragments out of the air-material separators associated with the wood dust conveying process. (2)A means of static charge dissipation, such as bonding or grounding, was not provided between the air-material separators and pieces of equipment which were connected by flexible non-metallic duct work on machinery such as, but not limited to, the DM1 door miter machine, DM5 CNC machine, DM6 door machine, SM7 shaper, GT7 profiler/sander, M3 shaper, M4 shaper, US1 profiler/sander, WW6 profiler/sander, T55 tilting arbor saw, TS3 table saw, CS4 table saw, DT45 dovetail router, OP6 wide belt sanding machine, EB9 edge bander, B8 band saw, M5 shaper, M6 shaper, frame sanding table, DS1 dado saw, TS1 table saw, TK2 miter machine, TS2 table saw, PS3 panel saw, CNC router 1, and CNC router 2. (3)Use of flexible non-metallic duct work exceeded the minimum required for machinery operation on equipment, such as but not limited to, the DM1 door miter machine, DM5 CNC machine, DM6 door machine, SM7 shaper, GT7 profiler/sander, M3 shaper, M4 shaper, US1 profiler/sander, WW6 profiler/sander, T55 tilting arbor saw, TS3 table saw, CS4 table saw, DT45 dovetail router, OP6 wide belt sanding machine, B8 band saw, M5 shaper, M6 shaper, frame sanding table, DS1 dado saw, TS1 table saw, TK2 miter machine, TS2 table saw, and PS3 panel saw. (4)A deflagration panel on the outdoor Carter Day bag house dust collector was blocked by the return air (outlet) duct work exiting the bag house. (5)A spark detection system with high speed-speed abort gate or extinguishment capability was not installed downstream of the last material entry points and upstream of the air-material separators on the Torit bag house dust collection system where machinery having a history of producing sparks, including large belt sanders/planers having automatic feed systems, were used. (6)Deflagration isolation or suppression systems were not provided for the inlet (dirty air) sides of the air-material separators. (7)A high-speed abort gate operating in conjunction with a spark detection system was not provided on the return air (outlet) sides of each air- material separator in order to intercept and divert any burning material to atmosphere before re-entering the facility. (8)Dynamic changes via the frequent use of dampers were made to the system without ensuring that the other remaining branches had sufficient capture and air conveying velocities. The employer had no method of determining that minimum duct velocities were being maintained in the system. (9)Multiple dampers, gates, and orifice plates provided for the purpose of attempting to balance airflow in the system were not fastened in place to prevent inadvertent movement. (10)A 'blow down' safety program was not implemented where compressed air was used to clean off elevated surfaces. (b)Great Northern Cabinetry, Inc. in Rib Lake, WI: The following deficiencies were found with the Reliant model 820 enclosureless dust collection system associated with the TS6 table saw and the Reliant model 270 enclosureless dust collection system associated with the TS4 table saw used for collection of wood dusts: (1)A means of static charge dissipation, such as bonding or grounding, was not provided between the air material separators and pieces of equipment which were connected by flexible non-metallic duct work. (2)Systems were located within 20 feet of means of egress and/or routinely occupied areas. AMONG OTHER METHODS, ONE FEASIBLE AND ACCEPTABLE MEANS OF ABATEMENT WOULD BE TO COMPLY WITH THE GUIDELINES OUTLINED IN NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) 664 "STANDARD FOR THE PREVENTION OF FIRES AND EXPLOSIONS IN WOOD PROCESSING AND WOODWORKING FACILITIES (2007) EDITION". Abatement certification and documentation are required for this item. Abatement Schedule STEP 1 -A combination of administrative controls shall be implemented as an interim protective measure until feasible engineering and administrative controls can be permanently implemented. STEP 2 -A written detailed plan of abatement shall be submitted to the Area Director outlining a schedule for the implementation of engineering and/or administrative measures to control employee exposures to the hazardous condition as referenced in this citation. This plan shall include, at a minimum, target dates for the following actions which must be consistent with the abatement dates required by this citation: (1)Evaluation of engineering/administrative control options; (2)Selection of optimum control methods and completion of design; (3)Procurement, installation and operation of selected control measures; (4)Testing and acceptance or modification/redesign of controls; All proposed control measures shall be approved for each particular use by a competent certified safety professional, professional engineer, or other technically qualified person. STEP 3 -Abatement shall have been completed by the implementation of feasible engineering and administrative controls upon verification of their effectiveness in achieving compliance. Date by Which Violation Must be Abated: STEP - 13/24/09 Date by Which Violation Must be Abated: STEP - 2 4/14/09 Date by Which Violation Must be Abated: STEP - 3 5/12/09
Recent events (3)
- · P (S) $525.00
- · R (S) $525.00
- · Z (S) $875.00
1910.212 A03 II
- Issued
- Feb 17, 2009
- Abate by
- Mar 13, 2009
- Penalty
- Initial $525 · Current $315 Reduced
Recent events (2)
- · I (S) $315.00
- · Z (S) $525.00
1910.332 B01
- Issued
- Feb 17, 2009
- Abate by
- Apr 3, 2009
- Penalty
- Initial $875 · Current $525 Reduced
Recent events (2)
- · I (S) $525.00
- · Z (S) $875.00
1910.333 B02 I
- Issued
- Feb 17, 2009
- Abate by
- Apr 3, 2009
Recent events (2)
- · I (S)
- · Z (S)
1910.335 A01 I
- Issued
- Feb 17, 2009
- Abate by
- Apr 3, 2009
Recent events (2)
- · I (S)
- · Z (S)
1910.22 D01
- Issued
- Feb 17, 2009
- Abate by
- Mar 13, 2009
Recent events (2)
- · I (O)
- · Z (O)
1910.213 P04
- Issued
- Feb 17, 2009
- Abate by
- Mar 13, 2009
Recent events (2)
- · I (O)
- · Z (O)
1910.1020 G01 I
- Issued
- Feb 17, 2009
- Abate by
- Mar 20, 2009
Recent events (2)
- · I (O)
- · Z (O)
More inspections at Great Northern Cabinetry, INC.
View Great Northern Cabinetry, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 337110)
More inspections in WI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 307046243.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.