Safety Incidents OSHA Severe Injury Reports · 2015–2025
4,113,118Inspections Most recent open 2026-07-13 Last loaded 2026-07-17

OSHA Inspection: KING YOUNG DEVELOPMENT INC DBA KING YOUNG CONSTRUC

Unprogrammed Other inspection · Safety discipline

On , OSHA opened an unprogrammed Other safety inspection of KING YOUNG DEVELOPMENT INC DBA KING YOUNG CONSTRUC in 18508 GALE AVE, INDUSTRY, CA 91748 (NAICS 236220). OSHA activity number 307188441.

Watch King Young Development INC DBA King Young Construc — free Get an email when a new federal OSHA severe-injury report for King Young Development INC DBA King Young Construc is published. One employer, no account, unsubscribe in one click.
Site address
18508 GALE AVE
City
INDUSTRY
State
CA
ZIP
91748
Mailing
9176 LAS TUNAS DRIVE, TEMPLE CITY, CA 91780
Inspection type
Unprogrammed Other (I)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
SIC code (legacy)
1542
Employees
5
Ownership type
A
Industry flags
Construction safety.

10 citations on file for this inspection.

341 C01 A

Other-than-serious 1 instance
Issued
Abate by
Penalty
Initial $1250.00 · Current $1250.00
Recent events (2)
  • — F (O) $1250.00
  • — Z (O) $1250.00

1509 C

Other-than-serious 1 instance
Issued
Abate by
Penalty
Initial $215.00
Recent events (2)
  • — F (O)
  • — Z (O) $215.00

1509 D

Other-than-serious 1 instance
Issued
Abate by
Penalty
Initial $175.00 · Current $100.00 Reduced
Recent events (2)
  • — F (O) $100.00
  • — Z (O) $175.00

1512 B

Other-than-serious 1 instance
Issued
Abate by
Penalty
Initial $435.00 · Current $250.00 Reduced
Recent events (2)
  • — F (O) $250.00
  • — Z (O) $435.00

1629 B01 A

Other-than-serious 1 instance
Issued
Abate by
Penalty
Initial $435.00 · Current $250.00 Reduced
Recent events (2)
  • — F (O) $250.00
  • — Z (O) $435.00

1644 A06

Other-than-serious 1 instance
Issued
Abate by
Penalty
Initial $195.00 · Current $110.00 Reduced
Recent events (2)
  • — F (O) $110.00
  • — Z (O) $195.00

1646 E

Other-than-serious 1 instance
Issued
Abate by
Penalty
Initial $195.00 · Current $110.00 Reduced
Recent events (2)
  • — F (O) $110.00
  • — Z (O) $195.00

1620 A

Serious 1 instance
Issued
Abate by
Penalty
Initial $3935.00 · Current $225.00 Reduced
Recent events (2)
  • — F (S) $225.00
  • — Z (S) $3935.00

1621 A

Serious 1 instance
Issued
Abate by
Penalty
Initial $3150.00 · Current $180.00 Reduced
Recent events (2)
  • — F (S) $180.00
  • — Z (S) $3150.00

1669 A

Serious 1 instance
Issued
Abate by
Penalty
Initial $3935.00 · Current $2250.00 Reduced
Recent events (2)
  • — F (S) $2250.00
  • — Z (S) $3935.00

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 307188441.