MELROSE PARK, IL —
OSHA Inspection: ALLOY WELDING CORP.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of ALLOY WELDING CORP. in 2033 JANICE AVENUE, MELROSE PARK, IL 60160 (NAICS 332321). OSHA activity number 307224030.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ALLOY WELDING CORP.
- Site address
- 2033 JANICE AVENUE
- City
- MELROSE PARK
- State
- IL
- ZIP
- 60160
- Mailing
- 2033 N. JANICE AVENUE, MELROSE PARK, IL 60160
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Partial (B)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332321
- SIC code (legacy)
- 3444
- Employees
- 22
- Ownership type
- A
Citations
7 citations on file for this inspection.
5(a)(1)
- Issued
- Jan 30, 2004
- Abate by
- Feb 26, 2004
- Penalty
- Initial $300 · Current $210 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the rotating blade: a) Tool Room - The Grob #24 vertical band saw #7486, Type #NS18, was not equipped with a magnetic restarter or similar device, as prescribed by the American National Standards, ANSI B11.10-1990, Section 5.2.3.4, that in the event of an interruption in the electrical supply would prevent the saw from restarting automatically when power is restored. A feasible means of abatement would be to provide a magnetic restarter or similar device as required by ANSI B11.10-1990. In accordance with 29 CFR 1903.19(c), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET).
Recent events (2)
- — I (S) $210.00
- — Z (S) $300.00
1910.147 C01
- Issued
- Jan 30, 2004
- Abate by
- Feb 26, 2004
- Penalty
- Initial $300 · Current $210 Reduced
Recent events (2)
- — I (S) $210.00
- — Z (S) $300.00
1910.178 L01
- Issued
- Jan 30, 2004
- Abate by
- Feb 26, 2004
- Penalty
- Initial $300 · Current $210 Reduced
Recent events (2)
- — I (S) $210.00
- — Z (S) $300.00
1910.212 A01
- Issued
- Jan 30, 2004
- Abate by
- Feb 26, 2004
- Penalty
- Initial $300 · Current $210 Reduced
Recent events (2)
- — I (S) $210.00
- — Z (S) $300.00
1910.219 D01
- Issued
- Jan 30, 2004
- Abate by
- Feb 26, 2004
- Penalty
- Initial $300 · Current $210 Reduced
Recent events (2)
- — I (S) $210.00
- — Z (S) $300.00
1910.219 E03 I
- Issued
- Jan 30, 2004
- Abate by
- Feb 26, 2004
1910.22 D01
- Issued
- Jan 30, 2004
- Abate by
- Feb 26, 2004
More inspections at Alloy Welding Corp.
View Alloy Welding Corp.'s full OSHA safety record →
More inspections in this industry (NAICS 332321)
More inspections in IL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 307224030.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.