WESTMINSTER, CO —
OSHA Inspection: ACCENT WINDOW PRODUCTS, INC.
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of ACCENT WINDOW PRODUCTS, INC. in 12300 PECOS STREET, WESTMINSTER, CO 80234 (NAICS 321911). OSHA activity number 307520940.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- ACCENT WINDOW PRODUCTS, INC.
- Site address
- 12300 PECOS STREET
- City
- WESTMINSTER
- State
- CO
- ZIP
- 80234
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 321911
- SIC code (legacy)
- 2431
- Employees
- 100
- Ownership type
- A
Citations
14 citations on file for this inspection.
5(a)(1)
- Issued
- Jul 13, 2004
- Abate by
- Oct 14, 2004
- Penalty
- Initial $2,450 · Current $1,225 Reduced
R250
General-duty citation text
For purposes of settlement with the employer in the Informal Conference stage, the following Section 5(a)(1) violation will be deleted and replaced with 29 CFR 1910.134(d)(1)(iii). See modifications at the end of this 5(a)(1) item: Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish to each of his employees employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed the solvent methyl ethyl ketoxime while spray painting window frames. The recommended exposure limit for this substance ranges from 0.5 ppm to 10 ppm. MEKO is known to cause degenerative effects on the olfactory epithelium of the nasal passages. (a) Accent Windows, Inc., 12300 Pecos Street, Westminster, CO 80234: Feasible administrative or engineering controls were not determined and implemented to maintain the spray painter's exposure to methyl ethyl ketoxime below the manufacturer's recommended exposure limit of 3 ppm. On April 21, 2004, the spray painter was monitored to determine their exposure to methyl ethyl ketoxime while painting window frames. The painter was exposed to an 8-hour Time Weighted Average of methyl ethyl ketoxime of 11 ppm. The manufacturer's reaccommodate exposure limit is 3 ppm for an 8-hour Time Weighted Average. The exhaust fan for the spray paint booth was undersized and could not produce enough airflow through the paint booth to maintain the spray painter's exposure below the manufacture's recommended exposure limit. The employee was not wearing the appropriate respiratory protection at the time that the survey was conducted. Feasible Abatement: The installation of a larger capacity exhaust fan will increase the airflow through the paint booth resulting in lowering the painter's exposure to MEKO. STEP 1:Effective respiratory protection shall be provided and used by exposed employees as an interim protective measure until feasible engineering and/or administrative controls can be implemented or whenever such controls fail to reduce employee exposure to within exposure limits. STEP 1 ABATEMENT DATE (15 DAYS): July 31, 2004 STEP 2:Submit to the Area Director a written detailed plan of abatement outlining a schedule for the implementation of engineering and/or administrative measures to control employee exposures to the hazardous substance referenced in this citation. The plan shall include, at a minimum, target dates for the following actionswhich should be consistent with the dates required by this citation: (a) Evaluation of the extent and location of the hazard source (b) Evaluation of control measure options (c) Selection of optimum control measures (d) Determination of control measure design (e) Ordering and delivery of equipment (f) Installation of control measures (g) Training of employees in proper operation and maintenance of newly implemented control measures (h) Assurance of the effective performance of control measures All proposed control measures shall be evaluated for each particular use by a competent Industrial Hygienist or other technically qualified person. Thirty (30) day progress reports are required during the abatement period. The progress report must identify the action taken to achieve abatement and the date the action was taken. STEP 2 ABATEMENT DATE (30 DAYS): August 15, 2004 STEP 3:Abatement will be completed by the implementation of feasible engineering and/or administrative controls and upon verification of their effectiveness in achieving compliance. STEP 3 ABATEMENT DATE (90 DAYS): October 14, 2004 Abatement Note: Abatement Certification and documentation are required for this item (see enclosed "Sample Abatement-Certification Letter"). personal, full-shift personal The following citation language will replace the Section 5(a)(1) violation that was originally cited and issued on 07/13/2004: 29 CFR 1910.134(d)(1)(iii): The respiratory hazard(s) in the workplace were not identified and evaluated; to include a reasonable estimate of employee exposure to respiratory hazard(s) and an identification of the contaminant's chemical state and form: (a) Accent Windows, Inc., 12300 Pecos Street, Westminster, CO 80234: An employee, Spray Painter, who was spraying Benjamin Moore & Co. "Ironclad Alkyd Low Lustre Metal & Wood Enamel" paint, Product No. 163, n163, was exposed to an airborne concentration of at least 10.8 ppm of Methyl Ethyl Ketoxime, during the employee's work shift on April 21, 2004, and the employer had not evaluated this respiratory hazard through the use of personal air monitoring. Additionally, feasible administrative or engineering controls were not determined and implemented to maintain the spray painter's exposure to methyl ethyl ketoxime below the manufacturer's recommended exposure limit of 3 ppm. On April 21, 2004, the spray painter was monitored by OSHA to determine the employee's exposure to methyl ethyl ketoxime while painting window frames. The painter was exposed to an 8-hour Time Weighted Average of methyl ethyl ketoxime of at least 10.8 ppm. The manufacturer's recommended exposure limit was 3 ppm for an 8-hour Time Weighted Average. The exhaust fan for the spray paint booth was undersized and could not produce enough airflow through the paint booth to maintain the spray painter's exposure below the manufacture's recommended exposure limit. The employee was not wearing the appropriate respiratory protection at the time that the survey was conducted. Feasible Abatement: The installation of a larger capacity exhaust fan will increase the airflow through the paint booth resulting in lowering the painter's exposure to MEKO. STEP 1:Effective respiratory protection shall be provided and used by exposed employees as an interim protective measure until feasible engineering and/or administrative controls can be implemented or whenever such controls fail to reduce employee exposure to within exposure limits. STEP 1 ABATEMENT DATE (15 DAYS): July 31, 2004 STEP 2:Submit to the Area Director a written detailed plan of abatement outlining a schedule for the implementation of engineering and/or administrative measures to control employee exposures to the hazardous substance referenced in this citation. The plan shall include, at a minimum, target dates for the following actionswhich should be consistent with the dates required by this citation: (a) Evaluation of the extent and location of the hazard source (b) Evaluation of control measure options (c) Selection of optimum control measures (d) Determination of control measure design (e) Ordering and delivery of equipment (f) Installation of control measures (g) Training of employees in proper operation and maintenance of newly implemented control measures (h) Assurance of the effective performance of control measures All proposed control measures shall be evaluated for each particular use by a competent Industrial Hygienist or other technically qualified person. Thirty (30) day progress reports are required during the abatement period. The progress report must identify the action taken to achieve abatement and the date the action was taken. STEP 2 ABATEMENT DATE (30 DAYS): August 15, 2004 STEP 3:Abatement will be completed by the implementation of feasible engineering and/or administrative controls and upon verification of their effectiveness in achieving compliance. STEP 3 ABATEMENT DATE (90 DAYS): October 14, 2004 Abatement Note: Abatement Certification and documentation are required for this item (see enclosed "Sample Abatement-Certification Letter").-Certification
Recent events (2)
- — I (S) $1225.00
- — Z (S) $2450.00
1910.107 B05 I
- Issued
- Jul 13, 2004
- Abate by
- Aug 15, 2004
- Penalty
- Initial $1,400 · Current $500 Reduced
Recent events (2)
- — I (S) $500.00
- — Z (S) $1400.00
1910.107 G02
- Issued
- Jul 13, 2004
- Abate by
- Jul 26, 2004
Recent events (2)
- — I (S)
- — Z (S)
1910.107 E06 IV
- Issued
- Jul 13, 2004
- Abate by
- Jul 31, 2004
- Penalty
- Initial $1,400 · Current $1,050 Reduced
Recent events (2)
- — I (S) $1050.00
- — Z (S) $1400.00
1910.132 D01
- Issued
- Jul 13, 2004
- Abate by
- Jul 31, 2004
- Penalty
- Initial $2,450 · Current $810 Reduced
Recent events (2)
- — I (S) $810.00
- — Z (S) $2450.00
1910.132 A
- Issued
- Jul 13, 2004
- Abate by
- Jul 26, 2004
Recent events (2)
- — I (S)
- — Z (S)
1910.138 A
- Issued
- Jul 13, 2004
- Abate by
- Jul 26, 2004
Recent events (2)
- — I (S)
- — Z (S)
1910.134 C01
- Issued
- Jul 13, 2004
- Abate by
- Jul 31, 2004
- Penalty
- Initial $2,450 · Current $825 Reduced
R250
Recent events (2)
- — I (S) $825.00
- — Z (S) $2450.00
1910.134 D01 I
- Issued
- Jul 13, 2004
- Abate by
- Jul 31, 2004
R250
Recent events (2)
- — I (S)
- — Z (S)
1910.134 K01 I
- Issued
- Jul 13, 2004
- Abate by
- Jul 31, 2004
R250
Recent events (2)
- — I (S)
- — Z (S)
1910.1200 E01 I
- Issued
- Jul 13, 2004
- Abate by
- Jul 26, 2004
- Penalty
- Initial $1,750 · Current $1,750
Recent events (2)
- — I (O) $1750.00
- — Z (S) $1750.00
1910.1200 F05 II
- Issued
- Jul 13, 2004
- Abate by
- Jul 26, 2004
Recent events (2)
- — I (O)
- — Z (S)
1910.1200 G01
- Issued
- Jul 13, 2004
- Abate by
- Jul 16, 2004
Recent events (2)
- — I (O)
- — Z (S)
1910.1200 H01
- Issued
- Jul 13, 2004
- Abate by
- Jul 26, 2004
Recent events (2)
- — I (O)
- — Z (S)
More inspections at Accent Window Products, INC.
View Accent Window Products, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 321911)
More inspections in CO
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 307520940.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.