OSHA Inspection: ADVANCED POLYMER TECHNOLOGY

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of ADVANCED POLYMER TECHNOLOGY in 109 CONICA LANE, HARMONY, PA 16037 (NAICS 325510). OSHA activity number 308012095.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Advanced Polymer Technology — free Get an email when a new federal OSHA severe-injury report for Advanced Polymer Technology is published. One employer, no account, unsubscribe in one click.
Site address
109 CONICA LANE
City
HARMONY
State
PA
ZIP
16037
Mailing
PO BOX 160, HARMONY, PA 16037
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325510
SIC code (legacy)
2899
Employees
40
Ownership type
A

8 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 2 exposed
Issued
Mar 22, 2005
Abate by
Apr 25, 2005
Penalty
Initial $4,900 · Current $4,900
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed severe lacerations:
(a) Outside Lab Area:  On or about February 8, 2005, an emergency stop
button was not located
at the operator's station on the Pendraulik mixer.
(b) Outside Lab Area:  On or about February 8, 2005, the on/off switch for
the Pendraulik
mixer was not so located that the operator could cut off power to the
machine without leaving
his/her position at the point of operation.
(c) Outside Lab Area:  On or about February 8, 2005, employees were not
trained to safely
operate the Pendraulik mixer in accordance with the manufacturer's
instructions.
Among other methods one feasible and acceptable means to correct the
hazard is to install an
emergency stop push button and the on/off switch to this mixer that is
within the reach of the
operator while stationed at the point of operation.  Also, to train the
employees in the safe
operation of the mixer in accordance with the machine's owners/operators
manual.

1910.132 A

Serious Gravity 10 1 instance 1 exposed
Issued
Mar 22, 2005
Abate by
Apr 11, 2005
Penalty
Initial $3,500 · Current $3,500

1910.132 D01

Serious Gravity 10 1 instance 6 exposed
Issued
Mar 22, 2005
Abate by
Mar 30, 2005

1910.178 A06

Serious Gravity 01 1 instance 2 exposed
Issued
Mar 22, 2005
Abate by
Apr 11, 2005
Penalty
Initial $1,050 · Current $1,050

1910.178 L04 IIA

Serious Gravity 02 1 instance 1 exposed
Issued
Mar 22, 2005
Abate by
Apr 11, 2005
Penalty
Initial $1,400 · Current $1,400

1910.212 A01

Serious Gravity 10 1 instance 1 exposed
Issued
Mar 22, 2005
Abate by
Mar 25, 2005
Penalty
Initial $4,900 · Current $4,900

1910.212 B

Serious Gravity 02 1 instance 2 exposed
Issued
Mar 22, 2005
Abate by
Mar 30, 2005
Penalty
Initial $1,400 · Current $1,400

1910.305 G01 IIID

Other-than-serious Gravity 01 1 instance 2 exposed
Issued
Mar 22, 2005
Abate by
Mar 28, 2005

View Advanced Polymer Technology's full OSHA safety record →