Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: HILLS CONSTRUCTION, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of HILLS CONSTRUCTION, INC. in 25 MORTIMER ISLAND RD., WEISER, ID 83672 (NAICS 237990). OSHA activity number 308345347.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Hills Construction, INC. — free Get an email when a new federal OSHA severe-injury report for Hills Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
25 MORTIMER ISLAND RD.
City
WEISER
State
ID
ZIP
83672
Mailing
2225 SOUTH 500 EAST SUITE 200, SALT LAKE CITY, UT 84106
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
237990
SIC code (legacy)
1629
Employees
4
Ownership type
A

2 citations on file for this inspection.

5(a)(1)

Serious Gravity 01 1 instance 2 exposed
Issued
Mar 15, 2006
Abate by
Mar 27, 2006
Penalty
Initial $450 · Current $225 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which was free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that
employees were exposed to an impalement hazard:
(a) Waste water treatment plant jobsite:  On February 27, 2006
and times prior thereto, employees were exposed to  impalement
hazards from unprotected rebar, including but not limited to,
bracing stakes for form work.
Note 1) One feasible and acceptable abatement method to correct this
hazard is to install
protective shields on protruding rebar bracing stakes.
Note 2) Abatement certification is  required for this item.
Recent events (2)
  • — I (S) $225.00
  • — Z (S) $450.00

1926.601 B03

Serious Gravity 03 1 instance 2 exposed
Issued
Mar 15, 2006
Abate by
Mar 27, 2006
Penalty
Initial $750 · Current $375 Reduced
Recent events (2)
  • — I (S) $375.00
  • — Z (S) $750.00

View Hills Construction, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 308345347.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.