THOMASTON, TX ·
OSHA Inspection: SCORPION EXPLORATION & PRODUCTION INC #1
Complaint inspection · Safety discipline
At a glance
On , OSHA opened a complaint safety inspection of SCORPION EXPLORATION & PRODUCTION INC #1 in HWY 87 S, NORTH OF, THOMASTON, TX 77989 (NAICS 213111). OSHA activity number 308469303.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- SCORPION EXPLORATION & PRODUCTION INC #1
- Site address
- HWY 87 S, NORTH OF
- City
- THOMASTON
- State
- TX
- ZIP
- 77989
- Mailing
- PO BOX 643, BENAVIDES, TX 78341
What kind of inspection was it?
- Inspection type
- Complaint (B)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 213111
- SIC code (legacy)
- 1381
- Employees
- 13
- Ownership type
- A
Citations
20 citations on file for this inspection.
5(a)(1)
- Issued
- May 20, 2005
- Abate by
- Jun 6, 2005
- Penalty
- Initial $875 · Current $613 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a fall or burn hazard associated with an improperly installed auxiliary escape system: On February 23, 2005 and at other times previously thereto, the auxiliary escape line was installed in an unsafe manner and included the following visible deficiencies: a.The Crosby clips used to create an eye were installed incorrectly by placing the saddle on the dead end of the wire rope; b.The Crosby clips used were not evenly spaced with an adequate length of dead-end wire rope. Only two Crosby clips were used instead of the recommended minimum of three and these clips were badly corroded; c.The ground anchor for the auxiliary escape line was incorrectly installed. The employer permitted the use of a hammered metal stake as the ground anchor. The stake was hammered into the ground without a buried counter weight, nor was it augured in with a twist anchor as recommended by the manufacturer. Among other methods, one feasible and acceptable abatement method involves the employer ensuring the emergency escape line system is installed in accordance with Section 6.10 of the American Petroleum Institute's Recommended Practice 54 (3rd Edition; 1999), as well as Crosby clip and Geronimo company manufacturer guidelines.
Recent events (2)
- · I (S) $612.50
- · Z (S) $875.00
5(a)(1)
- Issued
- May 20, 2005
- Abate by
- Jun 16, 2005
- Penalty
- Initial $875 · Current $613 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to struck-by hazards associated with sudden pressure release: On February 23, 2005, and at other times prior thereto, employees were exposed to struck-by hazards involved with sudden pressure release in that the employer did not: a.ensure the installation of safety-catch chains for union joint connections of high pressure mud hoses and staked out lines; b.regularly conduct and document the inspection of critical mechanical parts (threaded and otherwise) including but not limited to the mud pump pressure relief valve. Among other methods, one feasible and acceptable abatement method to correct the hazard is to initiate and maintain an inspection program for the high pressure equipment associated with the mud pumps. Equipment must be installed and maintained in good operating condition in accordance with of the American Petroleum Institute's Recommended Practice 54 (Third Edition, August 1999).
Recent events (2)
- · I (S) $612.50
- · Z (S) $875.00
5(a)(1)
- Issued
- May 20, 2005
- Abate by
- Jun 2, 2005
- Penalty
- Initial $875 · Current $525 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by falling equipment or debris in the event of a rig collapse: On February 23, 2004, and at other times prior thereto, at this well site, the employer failed to follow good engineering practices in the guying and anchoring of the drilling rig derrick structure prior to commencing operations: a.Open hooks of undetermined capacity on chain termination points were used to wrap around and secure the guy lines to steel base plates; b.The base plates onto which the hooks were connected was kept in place by two hammered-in stakes with mushroomed heads; c.There were no records maintained on the anchorage system verifying the anchorage system had been tested within the previous two (2) years. Among other methods, one feasible and acceptable abatement method to correct the hazard is to follow guidelines described in the American Petroleum Institute's (API) Recommended Practice 54 (August, 1999) and API 4-G (First Edition, January 1992).
Recent events (2)
- · I (S) $525.00
- · Z (S) $875.00
1910.22 A03
- Issued
- May 20, 2005
- Abate by
- Jun 6, 2005
- Penalty
- Initial $525 · Current $368 Reduced
Recent events (2)
- · I (S) $367.50
- · Z (S) $525.00
1910.22 B01
- Issued
- May 20, 2005
- Abate by
- Jun 6, 2005
- Penalty
- Initial $525
Recent events (2)
- · I (O)
- · Z (S) $525.00
1910.23 C01
- Issued
- May 20, 2005
- Abate by
- Jun 6, 2005
- Penalty
- Initial $875 · Current $613 Reduced
Recent events (2)
- · I (S) $612.50
- · Z (S) $875.00
1910.24 C
- Issued
- May 20, 2005
- Abate by
- Jun 6, 2005
- Penalty
- Initial $525
Recent events (2)
- · I (O)
- · Z (S) $525.00
1910.132 D01 I
- Issued
- May 20, 2005
- Abate by
- May 26, 2005
- Penalty
- Initial $525 · Current $525
Recent events (2)
- · I (S) $525.00
- · Z (S) $525.00
1910.141 B01 I
- Issued
- May 20, 2005
- Abate by
- Jun 6, 2005
- Penalty
- Initial $525 · Current $525
Recent events (2)
- · I (S) $525.00
- · Z (S) $525.00
1910.141 C01 III
- Issued
- May 20, 2005
- Abate by
- Jun 6, 2005
- Penalty
- Initial $525
Recent events (2)
- · I (S)
- · Z (S) $525.00
1910.151 B
- Issued
- May 20, 2005
- Abate by
- Jun 24, 2005
- Penalty
- Initial $525
Recent events (2)
- · I (O)
- · Z (S) $525.00
1910.151 C
- Issued
- May 20, 2005
- Abate by
- Jun 6, 2005
- Penalty
- Initial $875 · Current $875
Recent events (2)
- · I (S) $875.00
- · Z (S) $875.00
1910.212 A01
- Issued
- May 20, 2005
- Abate by
- Jun 6, 2005
- Penalty
- Initial $875 · Current $613 Reduced
Recent events (2)
- · I (S) $612.50
- · Z (S) $875.00
1910.242 A
- Issued
- May 20, 2005
- Abate by
- May 31, 2005
- Penalty
- Initial $525 · Current $368 Reduced
Recent events (2)
- · I (S) $367.50
- · Z (S) $525.00
1910.303 B01 VII
- Issued
- May 20, 2005
- Abate by
- Jun 6, 2005
- Penalty
- Initial $875 · Current $875
Recent events (2)
- · I (S) $875.00
- · Z (S) $875.00
1910.303 G02 II
- Issued
- May 20, 2005
- Abate by
- May 26, 2005
- Penalty
- Initial $700
Recent events (2)
- · I (S)
- · Z (S) $700.00
1910.304 F02
- Issued
- May 20, 2005
- Abate by
- Jun 6, 2005
- Penalty
- Initial $875 · Current $613 Reduced
Recent events (2)
- · I (S) $612.50
- · Z (S) $875.00
1910.305 B01
- Issued
- May 20, 2005
- Abate by
- Jun 2, 2005
- Penalty
- Initial $875 · Current $875
Recent events (2)
- · I (S) $875.00
- · Z (S) $875.00
1910.305 G02 II
- Issued
- May 20, 2005
- Abate by
- May 31, 2005
- Penalty
- Initial $875
Recent events (2)
- · I (S)
- · Z (S) $875.00
1910.145 C02 I
- Issued
- May 20, 2005
- Abate by
- Jun 6, 2005
Recent events (2)
- · I (O)
- · Z (O)
More inspections in this industry (NAICS 213111)
More inspections in TX
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 308469303.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.