RED LION, PA —
OSHA Inspection: APEX URETHANE MILLWORK
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of APEX URETHANE MILLWORK in 27 GRAND STREET, RED LION, PA 17536 (NAICS 326199). OSHA activity number 308476993.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- APEX URETHANE MILLWORK
- Site address
- 27 GRAND STREET
- City
- RED LION
- State
- PA
- ZIP
- 17536
- Mailing
- P. O. BOX 527, BEL AIR, MD 21014
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326199
- SIC code (legacy)
- 3089
- Employees
- 95
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
15 citations on file for this inspection.
5(a)(1)
- Issued
- Jun 1, 2006
- Abate by
- Mar 1, 2007
- Penalty
- Initial $500 · Current $320 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employmnent and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to severe burn injuries from a potential dust explosion hazard that could have resulted from, or been exacerbated by the (a) failure to install appropriate dust collection system(s); b) failure to locate the Grizzly dust collector(s) that collects combustible/explosive dust outside of the building; c) failure to locate the Hammond dust collector that collects combustible/explosive dust outside the building; d) failure to install appropriate isolation devices between pieces of equipment connected by ductwork; (e) failure to install isolation devices from the dust collector upstream to the work area(s) and (f) failure to enclose interior stairs in a dusttight shaft with a self closing type or automatic closing type door: (a)Basement, Finishing Areas 1 and 2 - An appropriate type of dust collection system was not installed in the area to capture combustible dust generated from hand sanding operations, on or about March 9, 2006. (b)Basement, Grizzly Dust Collector/Sanding Area - The Grizzly Model G9980 dust collector used to collect combustible dust from the Grizzly fifty one (51) inch wide belt sander was not located outside, on or about March 9, 2006. (c)First Floor, Hammond Dust Collector - The Hammond Dust Collector, model DK 1255 used to collect combustible dust from equipment in the tooling department (including the double headed disc sander) was not located outside, on or about March 9, 2006. (d)First Floor, Hammond Dust Collector - The ductwork connecting the various pieces of woodworking and the double headed disc sander was not provided with appropriate isolation devices, such as chokes, rotary valves, fast acting valves, flame front diverters, or flame front extinguishing system(s), on or about March 9, 2006. (e)First Floor - Hammond Dust Collector - Isolation device(s) were not provided to prevent deflagration propagation from the dust collector upstream to the work area (tooling room), on or about March 9, 2006. (f)Interior Stairs - The rear set of stairs leading from the basement to the tooling room was not enclosed in a dust-tight shaft that was provided with a self closing type or automatic closing type of door, on or about March 9, 2006. ABATEMENT NOTE: Among other methods, one feasible and acceptable abatement method to correct these hazards (a) through (f) is to comply with National Fire Protection Association (NFPA) 654 "Standard for the Prevention of FIre and Dust Explosions from the Manufacturing, Processing, and Handling of Combustible Particulate Solids". This includes the following: (a)Install an appropriate type of dust collection system per Section 4.1 of the NFPA 654. (b)Relocate or install an appropriate type of dust collector outside of the building per Section 3.13.1.1 of NFPA 654. As an alternative to relocation of the collector comply with the exceptions listed in the NFPA 654. (c)Relocate or install an appropriate type of dust collector outside of the building per Section 3.13.1.1 of NFPA 654. As an alternative to relocation of the collector comply with the exceptions listed in the NFPA 654. (d)Install appropriate isolation devices per Section 3.1.3 of the NFPA 654. (e)Install appropriate isolation devices per Section 3.1.3.2 of the NFPA 654. (f)Install appropriate stairs and doors per Section 2.3.8 of the NFPA 654. VERIFICATION REQUIRED FOR THE ABOVE ITEMS
Recent events (3)
- — P (S) $320.00
- — I (S) $320.00
- — Z (S) $500.00
1910.22 A01
- Issued
- Jun 1, 2006
- Abate by
- Jul 4, 2006
- Penalty
- Initial $500 · Current $320 Reduced
Recent events (2)
- — I (S) $320.00
- — Z (S) $500.00
1910.106 E02 IVA
- Issued
- Jun 1, 2006
- Abate by
- Mar 8, 2006
- Penalty
- Initial $320 · Current $205 Reduced
Recent events (2)
- — I (S) $205.00
- — Z (S) $320.00
1910.132 F04
- Issued
- Jun 1, 2006
- Abate by
- Jun 27, 2006
- Penalty
- Initial $375 · Current $245 Reduced
Recent events (2)
- — I (S) $245.00
- — Z (S) $375.00
1910.133 A01
- Issued
- Jun 1, 2006
- Abate by
- Jun 27, 2006
1910.147 D03
- Issued
- Jun 1, 2006
- Abate by
- Jun 27, 2006
- Penalty
- Initial $375 · Current $245 Reduced
Recent events (2)
- — I (S) $245.00
- — Z (S) $375.00
1910.178 L01
- Issued
- Jun 1, 2006
- Abate by
- Jun 27, 2006
- Penalty
- Initial $375 · Current $245 Reduced
Recent events (2)
- — I (S) $245.00
- — Z (S) $375.00
1910.213 C01
- Issued
- Jun 1, 2006
- Abate by
- Jun 27, 2006
- Penalty
- Initial $500 · Current $325 Reduced
Recent events (2)
- — I (S) $325.00
- — Z (S) $500.00
1910.215 B09
- Issued
- Jun 1, 2006
- Abate by
- Mar 8, 2006
- Penalty
- Initial $320 · Current $210 Reduced
Recent events (2)
- — I (S) $210.00
- — Z (S) $320.00
1910.253 B02 II
- Issued
- Jun 1, 2006
- Abate by
- Mar 8, 2006
- Penalty
- Initial $320 · Current $210 Reduced
Recent events (2)
- — I (S) $210.00
- — Z (S) $320.00
1910.253 B04 III
- Issued
- Jun 1, 2006
- Abate by
- Mar 8, 2006
1910.303 B02
- Issued
- Jun 1, 2006
- Abate by
- Mar 8, 2006
- Penalty
- Initial $320 · Current $210 Reduced
Recent events (2)
- — I (S) $210.00
- — Z (S) $320.00
1910.305 J01 I
- Issued
- Jun 1, 2006
- Abate by
- Mar 8, 2006
- Penalty
- Initial $320 · Current $210 Reduced
Recent events (2)
- — I (S) $210.00
- — Z (S) $320.00
1910.307 B
- Issued
- Jun 1, 2006
- Abate by
- Mar 1, 2007
- Penalty
- Initial $500 · Current $325 Reduced
Recent events (3)
- — P (S) $325.00
- — I (S) $325.00
- — Z (S) $500.00
1910.147 C06 II
- Issued
- Jun 1, 2006
- Abate by
- Jun 27, 2006
More inspections at Apex Urethane Millwork
View Apex Urethane Millwork's full OSHA safety record →
More inspections in this industry (NAICS 326199)
More inspections in PA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 308476993.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.