DETROIT, MI —
OSHA Inspection: TRILOGY FINISHING
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of TRILOGY FINISHING in 1213 BELLEVUE, DETROIT, MI 48207 (NAICS 332813). OSHA activity number 308877737.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- TRILOGY FINISHING
- Site address
- 1213 BELLEVUE
- City
- DETROIT
- State
- MI
- ZIP
- 48207
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 332813
- SIC code (legacy)
- 3471
- Employees
- 3
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
15 citations on file for this inspection.
1910.147 C04 I
- Issued
- Apr 14, 2008
- Abate by
- May 19, 2008
- Penalty
- Initial $100 · Current $100
4081400402
- Issued
- Apr 14, 2008
- Abate by
- May 19, 2008
Recent events (2)
- — A (S)
- — Z (S)
1910.147 C07 IA
- Issued
- Apr 14, 2008
- Abate by
- May 19, 2008
- Penalty
- Initial $100 · Current $100
Recent events (2)
- — A (S) $100.00
- — Z (S) $100.00
1910.147 C07 IB
- Issued
- Apr 14, 2008
- Abate by
- May 19, 2008
Recent events (2)
- — A (S)
- — Z (S)
4081111501
- Issued
- Apr 14, 2008
- Abate by
- Jun 10, 2008
- Penalty
- Initial $200 · Current $200
Recent events (2)
- — A (R) $200.00
- — Z (R) $200.00
4081111504
- Issued
- Apr 14, 2008
- Abate by
- Jun 10, 2008
- Penalty
- Initial $150 · Current $150
Recent events (2)
- — A (R) $150.00
- — Z (R) $150.00
4082212904
- Issued
- Apr 14, 2008
- Abate by
- Jun 10, 2008
Recent events (2)
- — A (O)
- — Z (O)
4082213001
- Issued
- Apr 14, 2008
- Abate by
- Jun 10, 2008
Recent events (2)
- — A (O)
- — Z (O)
4081215203 B
- Issued
- Apr 14, 2008
- Abate by
- Apr 14, 2008
Recent events (2)
- — A (O)
- — Z (O)
40812138 C
- Issued
- Apr 14, 2008
- Abate by
- Apr 14, 2008
Recent events (2)
- — A (O)
- — Z (O)
4081330802
- Issued
- Apr 14, 2008
- Abate by
- May 19, 2008
Recent events (2)
- — A (O)
- — Z (O)
1910.305 B01 II
- Issued
- Apr 14, 2008
- Abate by
- May 19, 2008
Recent events (2)
- — A (O)
- — Z (O)
4081400707
- Issued
- Apr 14, 2008
- Abate by
- Apr 14, 2008
Recent events (2)
- — A (O)
- — Z (O)
1910.147 C06 I
- Issued
- Apr 14, 2008
- Abate by
- May 19, 2008
Recent events (2)
- — A (O)
- — Z (O)
1910.1200 E01
- Issued
- Apr 14, 2008
- Abate by
- Jun 10, 2008
Recent events (2)
- — A (O)
- — Z (O)
More inspections at Trilogy Finishing
View Trilogy Finishing's full OSHA safety record →
More inspections in this industry (NAICS 332813)
More inspections in MI
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 308877737.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.