Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: NABORS DRILLING USA, INC.

Complaint inspection · Safety discipline

On , OSHA opened a complaint safety inspection of NABORS DRILLING USA, INC. in RIG # 319, PARACHUTE, CO 81625 (NAICS 213111). OSHA activity number 309005759.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Nabors Drilling USA, INC. — free Get an email when a new federal OSHA severe-injury report for Nabors Drilling USA, INC. is published. One employer, no account, unsubscribe in one click.
Site address
RIG # 319
City
PARACHUTE
State
CO
ZIP
81625
Mailing
1145 16 RD, FRUITA, CO 81503
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
213111
SIC code (legacy)
1381
Employees
20
Ownership type
A

4 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 7 exposed
Issued
Oct 13, 2006
Abate by
Oct 18, 2006
Penalty
Initial $5,000 · Current $3,500 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to the hazard of "struck by" due to faulty equipment:
a)  Nabors Drilling USA, Inc., Rig #319, Parachute, CO:  On and prior to
August 4th, 2006, the air tugger (model K6UL) used to raise and lower
drill
pipe
and other drilling rig components, was operating with a faulty main
control lever.
The main control lever was not capable of returning to the center or
neutral
position upon being released by the operator resulting in continuation of
winch
line movement.
Among other methods, one feasible and acceptable abatement method to
correct
this hazard is to follow the manufacturers operating practices as found in
publication form P5869, Edition 8, dated February, 1981. These operating
practices include checking winches at the beginning of each shift to
ensure that
controls function properly and return to neutral when released.
Abatement Note:  Abatement certification is not required for this item.
Recent events (2)
  • — F (S) $3500.00
  • — Z (S) $5000.00

5(a)(1)

Serious Gravity 10 2 instances 7 exposed
Issued
Oct 13, 2006
Abate by
Jan 3, 2007
Penalty
Initial $5,000 · Current $3,500 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to the hazard of struck by hazards due to operating a faulty
hoist:
a)  Nabors Drilling USA, Inc., Rig #319, Parachute, CO: On and prior to
8/4/2006, the main control lever on the air tugger (model H6UL) was fitted
with
improvised springs. These springs were not capable of returning the
control lever
back to the center or neutral position after physically releasing the
control lever.
b)  On and prior to 8/4/2006, the main control lever on the air tugger
(model
H6HL) was fitted with an improvised throttle lever pin. A common nut and
bolt
were used to secure the main control lever to the base unit. This
condition did not
permit the main control lever to "seat" in the center or neutral position.
Among other methods, one feasible and acceptable abatement method to
correct
this hazard is to adopt and follow the preventive maintenance program
contained
in the American Society of Mechanical Engineers (ASME B30.7-2001)
publication.  Section 7-2.3.1 titled Preventive Maintenance states in
paragraph (b)
"Replacement parts shall be at least equal to the original parts."
Abatement Note:  Abatement certification is required for this item (See
enclosed "Sample
Abatement-Certification Letter").-Certification
Recent events (2)
  • — F (S) $3500.00
  • — Z (S) $5000.00

1910.23 C01

Serious Gravity 02 1 instance 12 exposed
Issued
Oct 13, 2006
Abate by
Jan 3, 2007
Penalty
Initial $1,700 · Current $1,190 Reduced
Recent events (2)
  • — F (S) $1190.00
  • — Z (S) $1700.00

1910.212 A01

Serious Gravity 10 2 instances 7 exposed
Issued
Oct 13, 2006
Abate by
Jan 3, 2007
Penalty
Initial $5,000 · Current $3,500 Reduced
Recent events (2)
  • — F (S) $3500.00
  • — Z (S) $5000.00

View Nabors Drilling USA, INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 309005759.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.