OSHA Inspection: REACO BATTERY SERVICE CORPORATION

Complaint inspection · Health discipline

On , OSHA opened a complaint health inspection of REACO BATTERY SERVICE CORPORATION in 17217 RT. 37, JOHNSTON CITY, IL 62951 (NAICS 335911). OSHA activity number 309285153.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Reaco Battery Service Corporation — free Get an email when a new federal OSHA severe-injury report for Reaco Battery Service Corporation is published. One employer, no account, unsubscribe in one click.
Site address
17217 RT. 37
City
JOHNSTON CITY
State
IL
ZIP
62951
Mailing
SERVICE CENTER ONE, 17217 HIGHWAY 37, JOHNSTON CITY, IL 62951
Inspection type
Complaint (B)
Scope
Partial (B)
Discipline
Health
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
335911
SIC code (legacy)
3691
Employees
14
Ownership type
A

15 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 2 instances 5 exposed
Issued
Oct 24, 2006
Abate by
Oct 27, 2006
Penalty
Initial $1,275 · Current $625 Reduced
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were not protected from automatic restart of metal-cutting saws.
The following saws did not have magnetic restart capability:
a) Hobart Vertical Bandsaw in mine battery room, ser #5216D, model
#11-1F4-147, and
b) Craftsman 10" Table Saw, ser #0424, mod #152-221140.  ANSI B11.10
(1990), Section
4.2.3.4 states that "in the event of an interruption in the electrical
power supply, the machine
shall not restart automatically when power is restored".  A feasible means
of abatement would
be to install a motor control device or magnetic restart to prevent
automatic restart after an
interruption in the power supply, as required by ANSI B11.10 (1974).
Abatement documentation is required for this item in accordance with the
requirements of 29
CFR 1903.19(d).  Abatement complete.
Recent events (2)
  • — I (S) $625.00
  • — Z (S) $1275.00

1910.94 A04 I

Serious Gravity 02 1 instance 5 exposed
Issued
Oct 24, 2006
Abate by
Dec 12, 2006
Penalty
Initial $300 · Current $150 Reduced
Recent events (2)
  • — I (S) $150.00
  • — Z (S) $300.00

1910.107 H12

Serious Gravity 10 1 instance 5 exposed
Issued
Oct 24, 2006
Abate by
May 12, 2007
Penalty
Initial $1,500 · Current $750 Reduced
Recent events (3)
  • — P (S) $750.00
  • — I (S) $750.00
  • — Z (S) $1500.00

1910.133 A01

Serious Gravity 01 1 instance 5 exposed
Issued
Oct 24, 2006
Abate by
Dec 12, 2006
Penalty
Initial $225 · Current $110 Reduced
Recent events (3)
  • — I (S) $110.00
  • — A (S) $225.00
  • — Z (S) $225.00

1910.133 A02

Serious Gravity 01 2 instances 5 exposed
Issued
Oct 24, 2006
Abate by
Dec 12, 2006

1910.158 E02 III

Other-than-serious Gravity 02 1 instance 14 exposed
Issued
Oct 24, 2006
Abate by
Oct 27, 2006
Penalty
Initial $600
Recent events (2)
  • — I (O)
  • — Z (S) $600.00

1910.213 C01

Serious Gravity 01 1 instance 5 exposed
Issued
Oct 24, 2006
Abate by
Nov 20, 2006
Penalty
Initial $450 · Current $225 Reduced
Recent events (2)
  • — I (S) $225.00
  • — Z (S) $450.00

1910.213 C03

Serious Gravity 01 1 instance 5 exposed
Issued
Oct 24, 2006
Abate by
Nov 20, 2006

1910.215 A04

Serious Gravity 05 1 instance 5 exposed
Issued
Oct 24, 2006
Abate by
Oct 27, 2006
Penalty
Initial $525 · Current $265 Reduced
Recent events (2)
  • — I (S) $265.00
  • — Z (S) $525.00

1910.215 B09

Serious Gravity 05 1 instance 5 exposed
Issued
Oct 24, 2006
Abate by
Oct 27, 2006

1910.253 B04 III

Serious Gravity 02 1 instance 14 exposed
Issued
Oct 24, 2006
Abate by
Oct 27, 2006
Penalty
Initial $300 · Current $150 Reduced
Recent events (2)
  • — I (S) $150.00
  • — Z (S) $300.00

1910.303 G01 II

Serious Gravity 10 1 instance 14 exposed
Issued
Oct 24, 2006
Abate by
Oct 27, 2006
Penalty
Initial $1,500 · Current $750 Reduced
Recent events (2)
  • — I (S) $750.00
  • — Z (S) $1500.00

1910.303 G02 I

Serious Gravity 10 2 instances 14 exposed
Issued
Oct 24, 2006
Abate by
Oct 27, 2006

1910.134 G01 IA

Other-than-serious Gravity 01 2 instances 5 exposed
Issued
Oct 24, 2006
Abate by
Dec 12, 2006

1910.1200 F05 I

Other-than-serious Gravity 01 1 instance 14 exposed
Issued
Oct 24, 2006
Abate by
Oct 27, 2006

View Reaco Battery Service Corporation's full OSHA safety record →