Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: UNZEN MOTORS, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of UNZEN MOTORS, INC. in HIGHWAY 15 SOUTH, MILBANK, SD 57252 (NAICS 441110). OSHA activity number 309687895.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Unzen Motors, INC. — free Get an email when a new federal OSHA severe-injury report for Unzen Motors, INC. is published. One employer, no account, unsubscribe in one click.
Establishment
UNZEN MOTORS, INC.
Site address
HIGHWAY 15 SOUTH
City
MILBANK
State
SD
ZIP
57252
Mailing
P.O. BOX 431, MILBANK, SD 57252
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
441110
SIC code (legacy)
5511
Employees
16
Ownership type
A

1 citation on file for this inspection.

5(a)(1)

Serious Gravity 03 1 instance 3 exposed
Issued
Mar 14, 2006
Abate by
Apr 17, 2006
Penalty
Initial $750
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to potential crushing hazards from falling loads and/or lift
parts:
(a) Service bay area, for employees utilizing the Weaver 5500 (and
related) vehicle lift
to elevate vehicles for general maintenance and service where the lift was
not properly
secured to the service bay floor.
Abatement Note:
Among other methods, one feasible and acceptable method of abatement would
be to
follow the requirements of ANSI/ALI ALOIM and/or ANSI B153.1 which include,
specifications.
2.Provide training to employees on proper use and care of the lifts.
3.Ensure all lifts are rated and marked with their load capacity.
4.Schedule and complete all periodic and annual inspections.
Abatement Note:  Abatement certification is required for this item (see
enclosed "Sample
Abatement Certification Letter").tion
Recent events (2)
  • — I (S)
  • — Z (S) $750.00

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 309687895.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.