Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,197,124Inspections Most recent open 2026-08-25 Last loaded 2026-08-28

OSHA Inspection: TACHY TRANSPORT CONTRACTOR

Programmed Related inspection · Safety discipline

On , OSHA opened a programmed Related safety inspection of TACHY TRANSPORT CONTRACTOR in CARRETERA 155 KM 59 - BO PUGNADO AFUERA, VEGA BAJA, PR 00693 (NAICS 238910). OSHA activity number 309850055.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Tachy Transport Contractor for free Get an email when a new federal OSHA severe-injury report for Tachy Transport Contractor is published. One employer, no account, unsubscribe in one click.
Site address
CARRETERA 155 KM 59 - BO PUGNADO AFUERA
City
VEGA BAJA
State
PR
ZIP
00693
Mailing
URB. CAMINO DEL SOL #706, VEGA BAJA, PR 00693
Inspection type
Programmed Related (I)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Non-union (N)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238910
SIC code (legacy)
1629
Employees
2
Ownership type
Private (A)
Industry flags
Construction safety.

2 citations on file for this inspection.

6A0001

Serious Gravity 01 1 instance 1 exposed
Issued
Aug 8, 2007
Abate by
Aug 20, 2007
Penalty
Initial $450 · Current $450
Section 6(a) of the Puerto Rico Occupational Safety and Health Act:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or physical harm to employees in
that employees were
exposed to struck by the equipment and eye strain
Seccion 6(a) de la Ley de Seguridad y Salud en el Trabajo de Puerto Rico:
El patrono no
the grid.
En el lado oeste del proyecto un empleado estaba utilizando una excavadora
Daewoo modelo
Solar 220LC - III. El patrono le instalo al equipo una rejilla
sustituyendo el cristal de la cabina.
La rejilla tenia agujeros de 1" x 3/4" y dificultaba la visibilidad. Un
metodo factible y aceptable
para corregir estos riesgos entre otros podria ser la instalacion del
cristal recomendado por el
manufacturero y removerle la rejilla.

1926.20 B01

Other-than-serious Gravity 01 1 instance 4 exposed
Issued
Aug 8, 2007
Abate by
Sep 4, 2007

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 309850055.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.