OSHA Inspection: JC CONSTRUCTION LLC

Referral inspection · Safety discipline

On , OSHA opened a referral safety inspection of JC CONSTRUCTION LLC in 51D SPARROW WAY, BREINIGSVILLE, PA 18031 (NAICS 238130). OSHA activity number 309862621.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch JC Construction LLC — free Get an email when a new federal OSHA severe-injury report for JC Construction LLC is published. One employer, no account, unsubscribe in one click.
Establishment
JC CONSTRUCTION LLC
Site address
51D SPARROW WAY
City
BREINIGSVILLE
State
PA
ZIP
18031
Mailing
300 WHITTAKER STREET, RIVERSIDE, NJ 08075
Inspection type
Referral (C)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
SIC code (legacy)
1751
Employees
7
Ownership type
A

1 citation on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 7 exposed
Issued
Dec 21, 2006
Abate by
Dec 21, 2006
Penalty
Initial $1,500 · Current $1,500
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees in that employees
were exposed to the hazard of being struck by collapsing building
components due to inadequate
bracing:
a) Worksite - On or about November 10, 2006 the wall sections for two
stories, a floor
section and roof of a townhome under construction collapsed as the
temporary wall
bracing needed to support the structure was not installed on one front
wall section.
Among other methods, one feasible and accepted method of abatement is to
install and
maintain temporary wall bracing as detailed on sheet SP-1 entitled Safety
Procedures
contained in the building plans prepared by the developer, NVR Inc. Ryan
Homes, and
further described on page 5 of the Performance Specification Phase 110 -
Framing Labor
which requires one brace be installed every ten feet along the wall
section.
No abatement certification or documentation required.tion

View JC Construction LLC's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 309862621.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.