Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,189,992Inspections Most recent open 2026-07-18 Last loaded 2026-07-22

OSHA Inspection: VELASQUEZ CONSTRUCTION CORPORATION

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of VELASQUEZ CONSTRUCTION CORPORATION in 1432 PLEASANT VALLEY ROAD, MANCHESTER, CT 06041 (NAICS 238130). OSHA activity number 310187422.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Velasquez Construction Corporation — free Get an email when a new federal OSHA severe-injury report for Velasquez Construction Corporation is published. One employer, no account, unsubscribe in one click.
Site address
1432 PLEASANT VALLEY ROAD
City
MANCHESTER
State
CT
ZIP
06041
Mailing
P.O. BOX 121, RUCKERSVILLE, VA 22968
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
SIC code (legacy)
1751
Employees
9
Ownership type
A
Industry flags
Construction safety.

2 citations on file for this inspection.

5(a)(1)

Serious Gravity 10 1 instance 1 exposed
Issued
Dec 6, 2007
Abate by
Jan 3, 2008
Penalty
Initial $1,500 · Current $1,500
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which were free from
recognized hazards that
were causing or likely to cause death or serious physical harm to
employees, in that:
On or about August 31, 2007 an employee was struck on the head by falling
parallel chord roof
truss due to shifting of the base wall and not securing the truss to the
base wall using nails or
other methods. Among other methods, one feasible and acceptable abatement
method to correct
the hazard would be to follow temporary bracing recommendations of the
manufacturer;
temporary bracing recommendations of a registered professional engineer;
temporary bracing
recommendations outlined in Wood Truss Council of America (WTCA) summary
sheets B1
Guide for handling, Installing, Restraining & Bracing of Trusses and WTCA
Summary sheet
B10 Post frame truss installation and temporary restraint/bracing.
Specific Abatement Documentation is Required.

1926.1051 A

Serious Gravity 10 1 instance 1 exposed
Issued
Dec 6, 2007
Abate by
Jan 3, 2008
Penalty
Initial $1,500 · Current $1,500

View Velasquez Construction Corporation's full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 310187422.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.