BARKSDALE AFB, LA —
OSHA Inspection: PIONEER DRILLING COMPANY, EAST TEXAS DIVISION
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of PIONEER DRILLING COMPANY, EAST TEXAS DIVISION in SLIGO FIELD, USA #39-ALT, S25 T18N R12W, BARKSDALE AFB, LA 71110 (NAICS 213111). OSHA activity number 310249529.
Where did this inspection happen?
- Establishment
- PIONEER DRILLING COMPANY, EAST TEXAS DIVISION
- Site address
- SLIGO FIELD, USA #39-ALT, S25 T18N R12W
- City
- BARKSDALE AFB
- State
- LA
- ZIP
- 71110
- Mailing
- 1409 KILGORE DR, HENDERSON, TX 75652
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 213111
- SIC code (legacy)
- 1381
- Employees
- 12
- Ownership type
- A
Citations
5 citations on file for this inspection.
5(a)(1)
- Issued
- Apr 3, 2007
- Abate by
- Apr 6, 2007
- Penalty
- Initial $1,125 · Current $675 Reduced
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish to each of his employees a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to the hazard of being struck by falling objects. a)DRILL FLOOR; on or about 03/01/07, the employer did not ensure that the hoist lines (wire rope) of both air hoists were in good condition. The lines were not properly wound on the hoist drum which crushed sections of the wire rope and caused numerous strands to break and caused the wire rope to birdcage. This exposed employee to the hazards of being struck by material that is being lifted by the hoists. Among other methods, one feasible and acceptable abatement method to correct this hazard would be to: 1)Perform regular inspections of the air hoist cables to ensure that the cable is in good condition and is properly lubricated and wound onto the drum of the air hoist. DISCLAIMERS: 1) You are not limited to the abatement methods suggested above. 2) The methods explained are general and may not be effective in all cases. 3) The employer is responsible for selecting and carrying out an appropriate method.
Recent events (2)
- — I (S) $675.00
- — Z (S) $1125.00
1910.151 C
- Issued
- Apr 3, 2007
- Abate by
- Apr 3, 2007
- Penalty
- Initial $956 · Current $574 Reduced
Recent events (2)
- — I (S) $574.00
- — Z (S) $956.00
1910.38 C04
- Issued
- Apr 3, 2007
- Abate by
- Apr 6, 2007
Recent events (2)
- — I (O)
- — Z (O)
1910.145 C02 I
- Issued
- Apr 3, 2007
- Abate by
- Apr 6, 2007
Recent events (2)
- — I (O)
- — Z (O)
1910.305 B01
- Issued
- Apr 3, 2007
- Abate by
- Apr 3, 2007
- Penalty
- Initial $637 · Current $382 Reduced
Recent events (2)
- — I (O) $382.00
- — Z (O) $637.00
More inspections in this industry (NAICS 213111)
More inspections in LA
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 310249529.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.