Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,191,871Inspections Most recent open 2026-07-30 Last loaded 2026-08-03

OSHA Inspection: SHOTLEY CONSTRUCTION, INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of SHOTLEY CONSTRUCTION, INC. in 618 NORTH WASHINGTON AVENUE, MINNEAPOLIS, MN 55401 (NAICS 238130). OSHA activity number 311118640.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Shotley Construction, INC. for free Get an email when a new federal OSHA severe-injury report for Shotley Construction, INC. is published. One employer, no account, unsubscribe in one click.
Site address
618 NORTH WASHINGTON AVENUE
City
MINNEAPOLIS
State
MN
ZIP
55401
Mailing
10056 108TH AVENUE NORTH, MAPLE GROVE, MN 55369
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
Y
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
238130
SIC code (legacy)
1751
Employees
4
Ownership type
A

1 citation on file for this inspection.

1926.501 B14

Serious 1 instance 2 exposed
Issued
May 29, 2007
Abate by
Jun 1, 2007
Penalty
Initial $750 · Current $750

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 311118640.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.