Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,191,871Inspections Most recent open 2026-07-30 Last loaded 2026-08-03

OSHA Inspection: FLOW POLYMERS INC.

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of FLOW POLYMERS INC. in 12819 COIT ROAD, CLEVELAND, OH 44108 (NAICS 325998). OSHA activity number 311162473.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Flow Polymers INC. for free Get an email when a new federal OSHA severe-injury report for Flow Polymers INC. is published. One employer, no account, unsubscribe in one click.
Establishment
FLOW POLYMERS INC.
Site address
12819 COIT ROAD
City
CLEVELAND
State
OH
ZIP
44108
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
325998
SIC code (legacy)
2899
Employees
85
Ownership type
A
Industry flags
Manufacturing safety.

7 citations on file for this inspection.

1910.22 A03

Serious Gravity 01 1 instance 4 exposed
Issued
Sep 26, 2007
Abate by
Oct 3, 2007
Penalty
Initial $525 · Current $315 Reduced
Recent events (2)
  • · I (S) $315.00
  • · Z (S) $525.00

1910.22 D01

Serious Gravity 01 1 instance 1 exposed
Issued
Sep 26, 2007
Abate by
Oct 3, 2007
Penalty
Initial $525 · Current $315 Reduced
Recent events (2)
  • · I (S) $315.00
  • · Z (S) $525.00

1910.23 C03

Serious Gravity 01 1 instance 1 exposed
Issued
Sep 26, 2007
Abate by
Oct 16, 2007
Penalty
Initial $525 · Current $315 Reduced
Recent events (2)
  • · I (S) $315.00
  • · Z (S) $525.00

1910.151 C

Deleted Serious Gravity 05 2 instances 1 exposed
Issued
Sep 26, 2007
Abate by
Oct 1, 2007
Penalty
Initial $1,225
Recent events (2)
  • · I (S)
  • · Z (S) $1225.00

1910.215 B09

Serious Gravity 01 1 instance 1 exposed
Issued
Sep 26, 2007
Abate by
Oct 1, 2007
Penalty
Initial $525 · Current $315 Reduced
Recent events (2)
  • · I (S) $315.00
  • · Z (S) $525.00

1910.219 F03

Serious Gravity 03 1 instance 1 exposed
Issued
Sep 26, 2007
Abate by
Oct 11, 2007
Penalty
Initial $875 · Current $525 Reduced
Recent events (2)
  • · I (S) $525.00
  • · Z (S) $875.00

1910.157 E02

Other-than-serious Gravity 01 1 instance
Issued
Sep 26, 2007
Abate by
Oct 2, 2007

View Flow Polymers INC.'s full OSHA safety record →

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 311162473.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.