CHARLOTTE, NC ·
OSHA Inspection: RHINO LININGS OF CHARLOTTE
Planned inspection · Health discipline
At a glance
On , OSHA opened a planned health inspection of RHINO LININGS OF CHARLOTTE in 5016-A N. TRYON STREET, CHARLOTTE, NC 28213 (NAICS 325211). OSHA activity number 311472005.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- RHINO LININGS OF CHARLOTTE
- Site address
- 5016-A N. TRYON STREET
- City
- CHARLOTTE
- State
- NC
- ZIP
- 28213
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Health
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 325211
- SIC code (legacy)
- 5013
- Employees
- 1
- Ownership type
- A
- Industry flags
- Manufacturing health.
Citations
3 citations on file for this inspection.
95012901
- Issued
- Jan 28, 2008
- Abate by
- Mar 14, 2008
- Penalty
- Initial $150 · Current $150
1073
General-duty citation text
North Carolina General Statute 95-129(l) of the Occupational Safety and Health Act of North Carolina: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to methylene bisphenyl isocyanate (MDI) levels that were above the American Conference of Governmental Industrial Hygienists (ACGIH) eight hour threshold limit value (TLV) of 0.005 parts per million MDI per million parts of air (ppm): a)spraying area, employees were exposed to 0.0375 ppm MDI when applying the Rhino Lining bedliner over sixty minutes of sampling, zero increments were assumed for the remainder of the eight hour workshift. Note: A feasible means of abatement would be to increase the ventilation in the area and implement a filter changeout schedule.
1910.132 D02
- Issued
- Jan 28, 2008
- Abate by
- Feb 14, 2008
1910.134 C01
- Issued
- Jan 28, 2008
- Abate by
- Feb 14, 2008
More inspections in this industry (NAICS 325211)
More inspections in NC