BOISE, ID —
OSHA Inspection: PANELIZED STRUCTURES, INC.
Unprogrammed Related inspection · Safety discipline
At a glance
On , OSHA opened an unprogrammed Related safety inspection of PANELIZED STRUCTURES, INC. in 2390 EAST FREIGHT, BOISE, ID 83701 (NAICS 238120). OSHA activity number 311580070.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- PANELIZED STRUCTURES, INC.
- Site address
- 2390 EAST FREIGHT
- City
- BOISE
- State
- ID
- ZIP
- 83701
- Mailing
- 5731 STODDARD ROAD, MODESTO, CA 95356
What kind of inspection was it?
- Inspection type
- Unprogrammed Related (G)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Y
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238120
- SIC code (legacy)
- 1791
- Employees
- 20
- Ownership type
- A
Citations
3 citations on file for this inspection.
5(a)(1)
- Issued
- May 14, 2009
- Abate by
- May 22, 2009
- Penalty
- Initial $4,900
General-duty citation text
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a material lift tipping over and/or losing its load while driving with the load elevated to a level which exceeded the manufacturer maximum elevation: a)East end of cold storage area, bay adjacent to the south exterior wall; On or about 2/18/09 and at times prior thereto, the operator of a JLG, Model 10054 rough terrain material lift traveled distances up to 50 feet with the load elevated from 20 to 47 feet above the ground level. The operator was placing multiple 3,200 - 3,300 pound 5 foot high by 8 foot wide by 83 foot long prefabricated steel roof joist/wood deck assemblies up to the roof deck level. Note 1: Among other methods, one feasible and acceptable abatement method to correct this hazard is to follow JLG's Operating Guide for the material lift being utilized which limits the load elevation during travel to a maximum of 11 feet. Note 2: Abatement certification and documentation IS required for this item.
Recent events (2)
- — I (S)
- — Z (S) $4900.00
1910.178 L03 IA
- Issued
- May 14, 2009
- Abate by
- Jun 3, 2009
Recent events (2)
- — I (S)
- — Z (S)
1926.602 C01 VI
- Issued
- May 14, 2009
- Abate by
- May 22, 2009
- Penalty
- Initial $4,900 · Current $6,000
Recent events (2)
- — I (S) $6000.00
- — Z (S) $4900.00
More inspections at Panelized Structures, INC.
View Panelized Structures, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 238120)
More inspections in ID
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 311580070.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.