SMITHERS, WV —
OSHA Inspection: MOUNTAINEER MANUFACTURING, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MOUNTAINEER MANUFACTURING, INC. in RT.60, SMITHERS, WV 25186 (NAICS 333131). OSHA activity number 311685424.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MOUNTAINEER MANUFACTURING, INC.
- Site address
- RT.60
- City
- SMITHERS
- State
- WV
- ZIP
- 25186
- Mailing
- PO BOX 488, SMITHERS, WV 25186
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 333131
- SIC code (legacy)
- 3532
- Employees
- 17
- Ownership type
- A
Citations
25 citations on file for this inspection.
1910.22 A01
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
- Penalty
- Initial $750 · Current $500 Reduced
Recent events (2)
- — I (S) $500.00
- — Z (S) $750.00
1910.37 A03
- Issued
- Apr 15, 2009
- Abate by
- Apr 20, 2009
- Penalty
- Initial $750 · Current $400 Reduced
Recent events (2)
- — I (S) $400.00
- — Z (S) $750.00
1910.144 A01 III
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
- Penalty
- Initial $600 · Current $500 Reduced
Recent events (2)
- — I (S) $500.00
- — Z (S) $600.00
1910.147 C07 I
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
- Penalty
- Initial $750 · Current $400 Reduced
Recent events (2)
- — I (S) $400.00
- — Z (S) $750.00
1910.151 B
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
- Penalty
- Initial $600 · Current $400 Reduced
Recent events (2)
- — I (S) $400.00
- — Z (S) $600.00
1910.157 G01
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
- Penalty
- Initial $750 · Current $500 Reduced
Recent events (2)
- — I (S) $500.00
- — Z (S) $750.00
1910.157 C01
- Issued
- Apr 15, 2009
- Abate by
- Apr 20, 2009
1910.178 M06
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
- Penalty
- Initial $600 · Current $400 Reduced
Recent events (2)
- — I (S) $400.00
- — Z (S) $600.00
1910.178 L04 III
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
1910.178 Q01
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
- Penalty
- Initial $750 · Current $500 Reduced
Recent events (2)
- — I (S) $500.00
- — Z (S) $750.00
1910.184 H05 I
- Issued
- Apr 15, 2009
- Abate by
- Apr 20, 2009
- Penalty
- Initial $600 · Current $400 Reduced
Recent events (2)
- — I (S) $400.00
- — Z (S) $600.00
1910.212 A01
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
- Penalty
- Initial $750 · Current $500 Reduced
Recent events (2)
- — I (S) $500.00
- — Z (S) $750.00
1910.219 D01
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
- Penalty
- Initial $750 · Current $500 Reduced
Recent events (2)
- — I (S) $500.00
- — Z (S) $750.00
1910.219 D01
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
1910.252 B02 III
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
- Penalty
- Initial $600 · Current $400 Reduced
Recent events (2)
- — I (S) $400.00
- — Z (S) $600.00
1910.253 B04 III
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
- Penalty
- Initial $750 · Current $400 Reduced
Recent events (2)
- — I (S) $400.00
- — Z (S) $750.00
1910.253 B02 II
- Issued
- Apr 15, 2009
- Abate by
- Apr 21, 2009
1910.253 B02 IV
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
1910.303 F01
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
- Penalty
- Initial $750 · Current $500 Reduced
Recent events (2)
- — I (S) $500.00
- — Z (S) $750.00
1910.303 G01
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
- Penalty
- Initial $750 · Current $500 Reduced
Recent events (2)
- — I (S) $500.00
- — Z (S) $750.00
1910.305 A04 IV
- Issued
- Apr 15, 2009
- Abate by
- Apr 20, 2009
- Penalty
- Initial $750 · Current $500 Reduced
Recent events (2)
- — I (S) $500.00
- — Z (S) $750.00
1910.305 B01 II
- Issued
- Apr 15, 2009
- Abate by
- Apr 20, 2009
- Penalty
- Initial $450 · Current $300 Reduced
Recent events (2)
- — I (S) $300.00
- — Z (S) $450.00
1910.1200 E01
- Issued
- Apr 15, 2009
- Abate by
- Apr 23, 2009
- Penalty
- Initial $600 · Current $400 Reduced
Recent events (2)
- — I (S) $400.00
- — Z (S) $600.00
1910.1200 F05 I
- Issued
- Apr 15, 2009
- Abate by
- Apr 20, 2009
1904.29 A
- Issued
- Apr 15, 2009
- Abate by
- Apr 27, 2009
More inspections at Mountaineer Manufacturing, INC.
View Mountaineer Manufacturing, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 333131)
More inspections in WV
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 311685424.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.