OSHA Inspection: KROY INDUSTRIES, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of KROY INDUSTRIES, INC. in 626 S. ROAD H, ULYSSES, KS 67880 (NAICS 326122). OSHA activity number 311789440.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- KROY INDUSTRIES, INC.
- Site address
- 626 S. ROAD H
- City
- ULYSSES
- State
- KS
- ZIP
- 67880
- Mailing
- P.O. BOX 526, ULYSSES, KS 67880
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326122
- SIC code (legacy)
- 3084
- Employees
- 64
- Ownership type
- A
Citations
10 citations on file for this inspection.
5(a)(1)
- Issued
- Aug 20, 2008
- Abate by
- Sep 24, 2008
- Penalty
- Initial $1,375 · Current $688 Reduced
General-duty citation text
Section 5(a)1 of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to fire and explosion hazards: Employees working in the blending room were exposed to fire and explosion hazards for the following conditions: a)Blending Room Dust Collector: The dust collector was located inside the blending room. b)Blending Room Dust Collector: The exhaust from the dust collector was not discharged outside. c)Blending Room Dust Collector: The dust collector and duct work were not bonded and grounded. d)Blending Room Dust Collector: The dust collector was not designed with explosion protection. e)Blending Room Dust Collector and Pneumatic Conveyor System: Isolation devices were not provided between pieces of equipment connected by duct work. Among other feasible and acceptable methods to correct these hazards are to follow NFPA 654 Prevention of Fire and Dust Explosions from the Manufacturing, Processing, and Handling of Combustible Particulate Solids, 2006 Edition including: a)Move the dust collector outside as per Section 7.13.1.1.1. "Where and explosion hazard exists, air-material separators shall be located outside of buildings." b)Ensure the exhaust is vented outside as per Section 7.13.1.7.1. "Exhaust air from the final air-material separator shall be discharged outside to a restricted area and away from air intakes." c)Ground the dust collector and bond all connecting ductwork to the dust collector as per Section 9.3.1.3. "Bonding and grounding with a resistance of less than 1.0 times ten to the 6th ohms to ground shall be provided for conductive components." d)Design and install a dust collector rated for combustible particulate as per Section 7.1.2.1. "The design of explosion protection for equipment shall incorporate one or more of the following methods of protection:" 1)Oxidant concentration reduction in accordance with NFPA 69, Standard on Explosion Prevention Systems a)Where oxygen monitoring is used, it shall be installed in accordance with ISA 84.00.01, Functional Safety: Application of Safety Instrumented Systems for the Process Industry Sector. b)Where the chemical properties of the material being conveyed require a minimum concentration of oxygen to control pyrophoricity, that level of concentration shall be maintained. 2)Deflagration Venting 3)Deflagration pressure containment in accordance with NFPA 69, Standard on Explosion Prevention Systems 4)Deflagration suppression systems in accordance with NFPA 69, Standard on Explosion Prevention Systems 5)Dilution with a noncombustible dust to render the mixture noncombustible 6)Deflagration venting through a listed dust retention and flame-arresting device e)Install devices to prevent the propagation of a fire or explosion as per Section 7.1.4.1. "Where an explosion hazard exists, isolation devices shall be provided to prevent deflagration propagation between pieces of equipment connected by ductwork." Section 7.1.4.2, Isolation devices shall include, but shall not be limited to the following: 1)Chokes 2)Rotary valves 3)Automatic fast-acting valve systems in accordance with NFPA 69, Standard on Explosion Prevention Systems 4)Flame front diverters in accordance with NFPA 69, Standard on Explosion Prevention Systems 5)Chemical isolation systems in accordance with NFPA 69, Standard on Explosion Prevention Systems 29 CFR 1903.19(d)(1) requires certification and documentation that the abatement of the above violation is completed.
Recent events (2)
- — I (S) $687.50
- — Z (S) $1375.00
1910.22 A01
- Issued
- Aug 20, 2008
- Abate by
- Sep 4, 2008
1910.23 C01
- Issued
- Aug 20, 2008
- Abate by
- Aug 25, 2008
- Penalty
- Initial $1,100 · Current $550 Reduced
Recent events (2)
- — I (S) $550.00
- — Z (S) $1100.00
1910.219 C02 I
- Issued
- Aug 20, 2008
- Abate by
- Aug 25, 2008
- Penalty
- Initial $1,100 · Current $550 Reduced
Recent events (2)
- — I (S) $550.00
- — Z (S) $1100.00
1910.219 D01
- Issued
- Aug 20, 2008
- Abate by
- Jun 4, 2008
- Penalty
- Initial $701 · Current $351 Reduced
Recent events (2)
- — I (S) $350.50
- — Z (S) $701.00
1910.219 E01 I
- Issued
- Aug 20, 2008
- Abate by
- Jun 4, 2008
1910.242 B
- Issued
- Aug 20, 2008
- Abate by
- Jun 4, 2008
- Penalty
- Initial $701 · Current $351 Reduced
Recent events (2)
- — I (S) $350.50
- — Z (S) $701.00
1910.253 B04 III
- Issued
- Aug 20, 2008
- Abate by
- Aug 25, 2008
- Penalty
- Initial $1,375 · Current $688 Reduced
Recent events (2)
- — I (S) $687.50
- — Z (S) $1375.00
1910.305 B01
- Issued
- Aug 20, 2008
- Abate by
- Aug 25, 2008
- Penalty
- Initial $1,375 · Current $688 Reduced
Recent events (2)
- — I (S) $687.50
- — Z (S) $1375.00
1910.305 B02 I
- Issued
- Aug 20, 2008
- Abate by
- Aug 25, 2008
- Penalty
- Initial $1,100 · Current $550 Reduced
Recent events (2)
- — I (S) $550.00
- — Z (S) $1100.00
More inspections at Kroy Industries, INC.
View Kroy Industries, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 326122)
More inspections in KS
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 311789440.