JACKSONVILLE, FL ·
OSHA Inspection: MARK LASSETER STONE MASONRY
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of MARK LASSETER STONE MASONRY in 7185 BONNEVAL ROAD, JACKSONVILLE, FL 32256 (NAICS 238140). OSHA activity number 311817274.
OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- MARK LASSETER STONE MASONRY
- Site address
- 7185 BONNEVAL ROAD
- City
- JACKSONVILLE
- State
- FL
- ZIP
- 32256
- Mailing
- 217 SOUTH MAIN STREET, ATTAPULGUS, GA 39815
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- Non-union (N)
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 238140
- SIC code (legacy)
- 1741
- Employees
- 7
- Ownership type
- Private (A)
Citations
9 citations on file for this inspection.
1926.100 A
- Issued
- Nov 12, 2008
- Abate by
- Nov 17, 2008
- Penalty
- Initial $750 · Current $160 Reduced
Recent events (2)
- · I (S) $160.00
- · Z (S) $750.00
1926.451 B01 I
- Issued
- Nov 12, 2008
- Abate by
- Nov 17, 2008
- Penalty
- Initial $1,500 · Current $1,000 Reduced
Recent events (2)
- · I (S) $1000.00
- · Z (S) $1500.00
1926.451 C02
- Issued
- Nov 12, 2008
- Abate by
- Nov 17, 2008
- Penalty
- Initial $1,500 · Current $800 Reduced
Recent events (2)
- · I (S) $800.00
- · Z (S) $1500.00
1926.451 C02 II
- Issued
- Nov 12, 2008
- Abate by
- Nov 17, 2008
- Penalty
- Initial $1,500 · Current $800 Reduced
Recent events (2)
- · I (S) $800.00
- · Z (S) $1500.00
1926.451 E07
- Issued
- Nov 12, 2008
- Abate by
- Nov 17, 2008
- Penalty
- Initial $750 · Current $300 Reduced
Recent events (2)
- · I (S) $300.00
- · Z (S) $750.00
1926.451 F07
- Issued
- Nov 12, 2008
- Abate by
- Nov 17, 2008
- Penalty
- Initial $1,500 · Current $900 Reduced
Recent events (2)
- · I (S) $900.00
- · Z (S) $1500.00
1926.451 G01
- Issued
- Nov 12, 2008
- Abate by
- Nov 17, 2008
- Penalty
- Initial $1,500 · Current $1,000 Reduced
Recent events (2)
- · I (S) $1000.00
- · Z (S) $1500.00
1926.454 A
- Issued
- Nov 12, 2008
- Abate by
- Nov 17, 2008
- Penalty
- Initial $1,500 · Current $800 Reduced
Recent events (2)
- · I (S) $800.00
- · Z (S) $1500.00
1926.20 B01
- Issued
- Nov 12, 2008
- Abate by
- Dec 31, 2008
Recent events (2)
- · I (O)
- · Z (O)
More inspections in this industry (NAICS 238140)
More inspections in FL
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 311817274.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.