Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,191,473Inspections Most recent open 2026-07-28 Last loaded 2026-07-31

OSHA Inspection: ROME CORPORATION DBA WESTERN WELL SERVICE RIG #5

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of ROME CORPORATION DBA WESTERN WELL SERVICE RIG #5 in GE 20-05, WESTON, CO 81091 (NAICS 213112). OSHA activity number 312139082.

What this inspection record means

OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Rome Corporation DBA Western Well Service RIG #5 — free Get an email when a new federal OSHA severe-injury report for Rome Corporation DBA Western Well Service RIG #5 is published. One employer, no account, unsubscribe in one click.
Site address
GE 20-05
City
WESTON
State
CO
ZIP
81091
Mailing
1023 RESERVATION RD., HAYS, KS 67601
Inspection type
Planned (H)
Scope
Complete (A)
Discipline
Safety
Advance notice
No
Union status
N
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
213112
SIC code (legacy)
1389
Employees
4
Ownership type
A

2 citations on file for this inspection.

5(a)(1)

Deleted Serious Gravity 03 1 instance 3 exposed
Issued
Mar 31, 2009
Abate by
Apr 6, 2009
Penalty
Initial $1,125 · Current $1,125
Section 5(a)(1) of the Occupational Safety and Health Act of 1970:  The
employer did not
furnish employment and a place of employment which was free from
recognized hazards
which were likely to cause death or serious physical harm from being
struck by in that, the
clamps on the guy lines were not spaced properly:
a) On or about March 19, 2009 and at times prior, employees were exposed
to injury while
operating Rig #5 in that, the clamps on the guy lines wire rope were
spaced 9-21 inches
apart.
Among other methods, one feasible and acceptable method to correct this
hazard condition
would be to install the clamps in accordance with Table 2 of Section 3.7.4
of the American
Petroleum Institute Recommended Practice on Application, Care and Use of
Wire Rope for
Oil Field Service, API RP 9B.
Abatement Note:  Abatement certification is required for this item (see
enclosed "Sample
Abatement-Certification Letter").
Recent events (2)
  • — I (S) $1125.00
  • — Z (S) $1125.00

1910.23 C01

Other-than-serious Gravity 01 1 instance 3 exposed
Issued
Mar 31, 2009
Abate by
Apr 6, 2009
Penalty
Initial $675 · Current $675
Recent events (2)
  • — I (O) $675.00
  • — Z (S) $675.00

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 312139082.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.