Safety Incidents OSHA Severe Injury Reports · 2015–2025
5,198,201Inspections Most recent open 2026-08-31 Last loaded 2026-09-03

OSHA Inspection: DALLAS CREEK CONSTRUCTION LLC

Planned inspection · Safety discipline

On , OSHA opened a planned safety inspection of DALLAS CREEK CONSTRUCTION LLC in 490 SHERMAN ST., RIDGWAY, CO 81432 (NAICS 236220). OSHA activity number 312139785.

What this inspection record means

OSHA opens inspections for many reasons: routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.

Watch Dallas Creek Construction LLC for free Get an email when a new federal OSHA severe-injury report for Dallas Creek Construction LLC is published. One employer, no account, unsubscribe in one click.
Site address
490 SHERMAN ST.
City
RIDGWAY
State
CO
ZIP
81432
Mailing
P.O. BOX 1270, RIDGWAY, CO 81432
Inspection type
Planned (H)
Scope
Partial (B)
Discipline
Safety
Advance notice
No
Union status
Non-union (N)
Opened
Closing conference
Case closed
Last modified
Data loaded
NAICS code
236220
SIC code (legacy)
1542
Employees
7
Ownership type
Private (A)

7 citations on file for this inspection.

1926.100 A

Serious Gravity 01 1 instance 9 exposed
Issued
May 26, 2009
Abate by
Jun 1, 2009
Penalty
Initial $450 · Current $200 Reduced
Recent events (2)
  • · I (S) $200.00
  • · Z (S) $450.00

1926.102 A01

Deleted Serious Gravity 02 1 instance 9 exposed
Issued
May 26, 2009
Abate by
Jun 1, 2009
Penalty
Initial $600 · Current $600
Recent events (2)
  • · I (S) $600.00
  • · Z (S) $600.00

1926.416 A01

Serious Gravity 10 1 instance 1 exposed
Issued
May 26, 2009
Abate by
Jun 1, 2009
Penalty
Initial $1,500 · Current $1,000 Reduced
Recent events (2)
  • · I (S) $1000.00
  • · Z (S) $1500.00

1926.451 C02 V

Deleted Serious Gravity 03 1 instance 3 exposed
Issued
May 26, 2009
Abate by
Jun 1, 2009
Penalty
Initial $750 · Current $750
Recent events (2)
  • · I (S) $750.00
  • · Z (S) $750.00

1926.451 G01 IV

Deleted Serious Gravity 03 1 instance 3 exposed
Issued
May 26, 2009
Abate by
Jun 1, 2009
Penalty
Initial $750 · Current $750
Recent events (2)
  • · I (S) $750.00
  • · Z (S) $750.00

1926.451 C02 V

Serious Gravity 03 1 instance 3 exposed
Issued
May 26, 2009
Abate by
Jun 1, 2009
Penalty
Current $500
Recent events (3)
  • · Q $750.00
  • · I (S) $500.00
  • · Z (S) $750.00

1926.451 G01 IV

Serious Gravity 03 1 instance 3 exposed
Issued
May 26, 2009
Abate by
Jun 1, 2009
Recent events (3)
  • · Q $750.00
  • · I (S)
  • · Z (S) $750.00

This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). OSHA publishes its own view of this case as inspection number 312139785.

Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.