GREENVILLE, SC —
OSHA Inspection: DIXIE RUBBER & PLASTICS, INC.
Planned inspection · Safety discipline
At a glance
On , OSHA opened a planned safety inspection of DIXIE RUBBER & PLASTICS, INC. in 100-B INDUSTRIAL DR, GREENVILLE, SC 29606 (NAICS 326299). OSHA activity number 312170988.
OSHA opens inspections for many reasons — routine scheduling under a national or local emphasis program, an employee complaint or referral, or a follow-up after a reported injury. Opening or conducting an inspection is not itself an allegation or a finding that this employer broke any rule; any findings appear as the citations listed below, and citations can be contested, reduced, or withdrawn.
Where did this inspection happen?
- Establishment
- DIXIE RUBBER & PLASTICS, INC.
- Site address
- 100-B INDUSTRIAL DR
- City
- GREENVILLE
- State
- SC
- ZIP
- 29606
- Mailing
- P O BOX 6554, GREENVILLE, SC 29607
What kind of inspection was it?
- Inspection type
- Planned (H)
- Scope
- Complete (A)
- Discipline
- Safety
- Advance notice
- No
- Union status
- N
When did the case open and close?
- Opened
- Closing conference
- Case closed
- Last modified
- Data loaded
Establishment context
- NAICS code
- 326299
- SIC code (legacy)
- 3069
- Employees
- 20
- Ownership type
- A
- Industry flags
- Manufacturing safety.
Citations
37 citations on file for this inspection.
10012 A
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
- Penalty
- Initial $100 · Current $100
General-duty citation text
SCRR 71-112A: Failed to furnish a place of employment which is free of recognized hazards which may cause death or serious physical harm to his employees and comply with this regulation and other occupational safety and health rules and regulations promulgated under Chapter 15 of Title 41, Code of Laws, State of South Carolina, 1976, as amended, as follows: A. Employer knew or should have known that employees operating the Caterpillar forklift, Serial Number 52V290, without a seat belt were exposed to the hazard of being thrown from the forklift and crushed. A feasible and useful method to correct this hazard, among others, is to install a seat belt and enforce the use of it on the forklift.
Recent events (2)
- — I (S) $100.00
- — Z (S) $100.00
1910.147 C04 I
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
- Penalty
- Initial $375 · Current $375
Recent events (2)
- — I (S) $375.00
- — Z (S) $375.00
1910.147 C04 II
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
- Penalty
- Initial $375 · Current $375
Recent events (2)
- — I (S) $375.00
- — Z (S) $375.00
1910.147 C05 II
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
- Penalty
- Initial $375 · Current $375
Recent events (2)
- — I (S) $375.00
- — Z (S) $375.00
1910.147 C07 I
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
- Penalty
- Initial $375 · Current $375
Recent events (2)
- — I (S) $375.00
- — Z (S) $375.00
1910.178 A04
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
- Penalty
- Initial $375 · Current $375
Recent events (2)
- — I (S) $375.00
- — Z (S) $375.00
1910.178 L02 II
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
- Penalty
- Initial $375 · Current $375
Recent events (2)
- — I (S) $375.00
- — Z (S) $375.00
1910.178 P01
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
- Penalty
- Initial $375 · Current $375
Recent events (2)
- — I (S) $375.00
- — Z (S) $375.00
1910.212 A01
- Issued
- Mar 6, 2009
- Abate by
- Mar 18, 2009
- Penalty
- Initial $300 · Current $120 Reduced
Recent events (2)
- — I (S) $120.00
- — Z (S) $300.00
1910.215 B09
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
- Penalty
- Initial $100 · Current $40 Reduced
Recent events (2)
- — I (S) $40.00
- — Z (S) $100.00
1910.219 E03 I
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
- Penalty
- Initial $100 · Current $40 Reduced
Recent events (2)
- — I (S) $40.00
- — Z (S) $100.00
1910.242 B
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
- Penalty
- Initial $100 · Current $40 Reduced
Recent events (2)
- — I (S) $40.00
- — Z (S) $100.00
1910.304 B02 I
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
- Penalty
- Initial $100 · Current $40 Reduced
Recent events (2)
- — I (S) $40.00
- — Z (S) $100.00
1910.304 G05
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
- Penalty
- Initial $100 · Current $100
Recent events (2)
- — I (S) $100.00
- — Z (S) $100.00
1910.304 G06 VIC5
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
- Penalty
- Initial $100 · Current $100
Recent events (2)
- — I (S) $100.00
- — Z (S) $100.00
1910.304 G06 IVC8
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
- Penalty
- Initial $100 · Current $100
Recent events (2)
- — I (S) $100.00
- — Z (S) $100.00
1910.305 B01 II
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
- Penalty
- Initial $100 · Current $100
Recent events (2)
- — I (S) $100.00
- — Z (S) $100.00
1910.305 B03 II
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
- Penalty
- Initial $100 · Current $100
Recent events (2)
- — I (S) $100.00
- — Z (S) $100.00
10012 A
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
- Penalty
- Initial $375 · Current $150 Reduced
Recent events (2)
- — I (S) $150.00
- — Z (S) $375.00
1910.178 L02 II
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
Recent events (2)
- — I (S)
- — Z (S)
1910.147 C04 I
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
- Penalty
- Initial $375 · Current $150 Reduced
Recent events (2)
- — I (S) $150.00
- — Z (S) $375.00
1910.147 C04 II
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
Recent events (2)
- — I (S)
- — Z (S)
1910.147 C05 II
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
Recent events (2)
- — I (S)
- — Z (S)
1910.147 C07 I
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
Recent events (2)
- — I (S)
- — Z (S)
1910.178 A04
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
- Penalty
- Initial $375 · Current $150 Reduced
Recent events (2)
- — I (S) $150.00
- — Z (S) $375.00
1910.178 P01
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
Recent events (2)
- — I (S)
- — Z (S)
1910.304 G05
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
- Penalty
- Initial $100 · Current $40 Reduced
Recent events (2)
- — I (S) $40.00
- — Z (S) $100.00
1910.304 G06 VIC5
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
Recent events (2)
- — I (S)
- — Z (S)
1910.304 G06 VIC8
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
Recent events (2)
- — I (S)
- — Z (S)
1910.305 B01 II
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
- Penalty
- Initial $100 · Current $40 Reduced
Recent events (2)
- — I (S) $40.00
- — Z (S) $100.00
1910.305 B03 II
- Issued
- Mar 6, 2009
- Abate by
- Mar 11, 2009
Recent events (2)
- — I (S)
- — Z (S)
1910.134 C02
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
Recent events (2)
- — I (O)
- — Z (O)
1910.134 E01
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
Recent events (2)
- — I (O)
- — Z (O)
1910.178 Q07
- Issued
- Mar 6, 2009
- Abate by
- Mar 19, 2009
Recent events (2)
- — I (O)
- — Z (O)
1910.303 F01
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
Recent events (2)
- — I (O)
- — Z (O)
1910.1200 E01 I
- Issued
- Mar 6, 2009
- Abate by
- Mar 18, 2009
Recent events (2)
- — I (O)
- — Z (O)
1910.1200 H01
- Issued
- Mar 6, 2009
- Abate by
- Apr 8, 2009
Recent events (2)
- — I (O)
- — Z (O)
More inspections at Dixie Rubber & Plastics, INC.
View Dixie Rubber & Plastics, INC.'s full OSHA safety record →
More inspections in this industry (NAICS 326299)
More inspections in SC
Source
This record is reproduced from the U.S. Department of Labor Open Data API (OSHA inspection dataset). The original IMIS detail view is available at OSHA's Establishment Search for activity number 312170988.
Look up any company's OSHA accident reports by company, or browse severe injury reports by year, state, and company.